PROJECT

LOCATION
OWNER
SUBJECT
DATE
Item #
A

:
:
:
:
:

PROPOSED 3 STOREY MUNICIPAL HALL EXTENSION


SAN JOSE CORNER MABINI STREET, POLLILO, QUEZON
LGU - POLLILO, QUEZON
COST ESTIMATE PLUMBING
AUG. 26, 2015
DESCRIPTION

GENERAL REQUIREMENTS:
Mobilization/Demobilization
Temporary facilities
Permits and Licenses (Fees by Owner,Legworks by Contractor)
As-built plans
Overhead and Supervision
SUB-TOTAL
PLUMBING WORKS:
2.1 Water line
1" diameter G.I. pipe
3/4" diameter G.I. pipe
1/2" diameter G.I. Pipe
Fittings & consumables
2.2 Sewer line & Drainage line
5" diameter PVC pipe
4" diameter PVC pipe
3" diameter PVC pipe
2" diameter PVC pipe
Catch basins
Fittings & consumables
2.3 Fixtures:
Water closet
sink
Lavatory
Septic tank
Cistern tank
Clean out
Floor drain

QNTY

1.00
1.00
1.00
1.00
1.00

UNIT

Lot
Lot
Lot
Lot
Lot

MATERIAL
UNIT COST

10,000.00

LABOR
UNIT COST

1,000.00

MATERIAL
COST

LABOR
COST
1,000.00

TOTAL

10,000.00
10,000.00

1,000.00

11,000.00
11,000.00

33.00
52.00
50.70
1.00

l.m.
l.m.
l.m.
Lot

125.00
94.00
63.00
10,000.00

120.00
120.00
120.00
4,000.00

4,125.00
4,888.00
3,194.10
10,000.00

3,960.00
6,240.00
6,084.00
4,000.00

8,085.00
11,128.00
9,278.10
14,000.00

107.00
49.39
103.00
39.00
10.00
1.00

l.m.
l.m.
l.m.
l.m.
set
Lot

150.00
120.00
90.00
65.00
850.00
12,000.00

120.00
100.00
80.00
80.00
750.00
8,000.00

16,050.00
5,926.80
9,270.00
2,535.00
8,500.00
12,000.00

12,840.00
4,939.00
8,240.00
3,120.00
7,500.00
8,000.00

28,890.00
10,865.80
17,510.00
5,655.00
16,000.00
20,000.00

12.00
1.00
12.00
1.00
1.00
10.00
23.00

set
set
set
lot
lot
pcs
pcs

12,400.00
2,500.00
2,520.00
30,000.00
35,000.00
250.00
350.00

1,000.00
750.00
900.00
15,000.00
15,000.00
150.00
150.00

148,800.00
2,500.00
30,240.00
30,000.00
35,000.00
2,500.00
8,050.00

12,000.00
750.00
10,800.00
15,000.00
15,000.00
1,500.00
3,450.00

160,800.00
3,250.00
41,040.00
45,000.00
50,000.00
4,000.00
11,500.00

Faucet
Fittings & consumables
SUB-TOTAL
III

XIII

FINISHING WORKS:
3.1 Waterproofing works
SUB-TOTAL
PUMPS
TOTAL CONSTRUCTION COST
Prepared By:
______________________

ANTHONY N. APURILLO
REG. MASTER PLUMBER
PRC # 007147
PTR # 5837783
Date Issued: Jan. 12, 2015
Place Issued: Cavite

15.00
1.00

pcs
Lot

550.00
25,000.00

200.00
10,000.00

8,250.00
25,000.00
366,828.90

3,000.00
10,000.00
136,423.00

11,250.00
35,000.00
503,251.90

84.00

m2

380.00

220.00

31,920.00
31,920.00

18,480.00
18,480.00

50,400.00
50,400.00

1.00

Lot

70,000.00

70,000.00
478,748.90

155,903.00

70,000.00
634,651.90