You are on page 1of 2

MAST

Safe Work Procedure


Division:

Analysis By:

Department:

Supervisor:

Job Title:

Approved By:

Job Title:

91 Fencing - Dial Before You


Dig

Date:
Frequency:
JSA Number:

Job Performed By:

REQUIRED PERSONAL PROTECTIVE EQUIPMENT:


GENERAL NOTES: CSA Approved means Green Triangle Footwear
JOB SAFETY ANALYSIS:
Step
1
1
2
2
3
4
1
1

2
3

Description
CHAIN LINK FENCING-Pinpoint location and auger
holes for posts
Set posts in concrete

Hazard

Controls

Strains, personal injury from power


equipment
Strains, personal injury

Placement of fence fabric


and fittings
Clean-up work area

Strains, cuts, working at heights

Safety wear, gloves, hearing protection. Firm grip on


equipment.
Safe work practice
Clear area for safe delivery
Proper lifting techniques, use of gloves, hard hats. Ladders
to be secured.
Proper lifting techniques. Use of personal protective
equipment.

SNOW FENCING
Push/hammer posts into
ground by manual or by
mechanical means
Setting top guy wire on
fencing material
Tie fabric to fencing

Strains, cuts, abrasions

Personal injury, fence post breaking

Safe operation of all equipment

Cuts, abrasions, strain

Use of gloves and safe work practices

Cuts, abrasions, strain

Use of gloves and safe work practices

AUTHORIZED EMPLOYEE INFORMATION:


Page 1 of 2

Print Date: Jan/25/2008

ID NUMBER:

LAST NAME:

FIRST NAME:

REMARKS:

JOB HISTORY INFORMATION:


DATE:

REMARKS:

Approval Signature:

Date:

Page 2 of 2

Print Date: Jan/25/2008

You might also like