Professional Documents
Culture Documents
06 - C Telia Sonera Optimization Case
06 - C Telia Sonera Optimization Case
Introduction
The TeliaSonera Sweden optimisation task force (TSSOTF) currently
focuses on
1. Optimisation of the eNB parameter values, with respect of KPIs from the
system performance evaluation agreement towards the customer, and
those reported to upper managerial layers.
2. Follow-up of outstanding faults that can impact the aforementioned KPIs.
This includes
1. Specific UE issues
2. Specific core network issues
3. Internal eNB faults that can be determined from alarms/PM data/drive
testing analysis.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Upgrade to RL20: valid from March 8th 2011 in the nine golden cluster sites.
First parameter alignment with default golden parameters and/or some parameters
previously tuned for Gothenburg: valid from March 16th 2011.
Minor parameter change in the golden cluster, tweak for TP during drive testing associated
to system performance evaluation (SPE), maxNrSymPdcch 32 (fine insofar that the
network has very light load)
Link parameters changed in the golden cluster, valid from 25th/March (nCqiDtx,t310,)
PRACH parameters + HO correction valid from 30th/March in the golden cluster
Network-wide alignment with golden recommendations, valid from April 6th.
Network-wide PRACH parameters tested in the golden cluster, valid from April 6th.
Link+PRACH parameters changed in a test cluster, valid from April 7th (nCqiDtx,t310,)
Additional testing for feedback to GMC: valid from April 20th, Lindholmen: taCmdMaxRetry
10->3 and Brunnsparken: taOffScheMarg 40->20
Date
Golden Cluster
8-Mar-11 Upgrade to RL20 PCD 1.1
9-Mar-11
16-Mar-11
Gothenborg
Whole Network
SW
updates
software version. Manual change of the vendor files is required, which is errorprone.
A custom build for PCD 1.1 was produced, so that the parameters could be
deployed network-wide upon the software upgrade.
However, the customer chose not to upgrade to PCD 1.1 before Easter.
After Easter, the upcoming release of PCD 2.2 makes the customer reconsider
about upgrading to PCD 2.1. Upgrade to PCD 2.2 may be done instead.
Most of the modified vendor file parameter changes have been agreed upon, to
be deployed in PCD 2.2. Exception made for taCmdMaxRetry and
taOffScheMarg. These are currently being tested, each one in an individual
site.
RL20: both eRAB drop ratio and RRC success ratio have bad KPI values with
the default parameter values.
A discussion on the analysis of the traces followed.
The increase in radio link drops can be explained partially by a different
behaviour of the eNB, upon arrival of RRC connection re-establishment
requests. This does not account for all the drops, though.
Development has requested more extensive tracing. A large TTI trace
collection campaign is being organized.
100428
0
0
1
1
0
0
0
100435
0
0
1
0
0
0
0
100438
0
0
0
0
0
0
0
100445
2
0
45
17
25
29
28
Sporadic
drops in
Gtaplatsen
enb_rel_rnl Succ. eRAB setup Total eRAB releases
18 04 2011
36
155
158
19 04 2011
27
298
301
20 04 2011
133
544
546
21 04 2011
52
464
470
22 04 2011
33
186
186
23 04 2011
38
137
136
24 04 2011
32
149
150
100448
0
0
5
0
0
0
0
100480
0
0
6
0
0
0
2
100493
0
0
0
0
0
0
0
100494
30
21
62
6
6
9
1
Kaserntorget will
be investigated
from the TTI +
Emil traces
Additional
drops in
Svenska
Mssan, to
be checked
Lindholmen: large
variability in the
drops, no evident
change.
Brunnsparken:
situation may have
improved, but
there are too few
drops to be
certain,.
Lindholmen (100468):
taCmdMaxRetry 103
Brunnsparken:
taOffScheMarg 4020
60
50
40
30
100443
20
100468
10
0
28 04 2011
27 04 2011
26 04 2011
25 04 2011
24 04 2011
23 04 2011
22 04 2011
21 04 2011
20 04 2011
19 04 2011
18 04 2011
17 04 2011
16 04 2011
15 04 2011
14 04 2011
13 04 2011
12 04 2011
11 04 2011
10 04 2011
09 04 2011
08 04 2011
07 04 2011
60
Usage [%]
50
40
30
20
10
10
UL TP v/s
RSRP per
MCS
15
MCS
20
25
30