You are on page 1of 9

Cipla

Goa

AUTOCLAVE VALIDATION

FILLING LOAD
(MINIMUM)

LOAD NO. –I

LOAD NO. –II

LOAD NO. –III


Cipla
Goa

AUTOCLAVE VALIDATION

FILLING LOAD
(MINIMUM)

PROBE LOCATON
ANNEXURE No.: S/01
Cipla
Goa

AUTOCLAVE VALIDATION

FILLING LOAD
(MINIMUM)

PROBE ORIENTATION
Ci
pla
Goa

Ci
pla
Goa

AUTOCLAVE VALIDATION
AUTOCLAVE VALIDATION
FILLING LOAD
(MINIMUM)
FILLING LOAD
(MINIMUM)
HEAT DISTRIBUTION AND PENETRATION STUDY
LOAD NO. –I
LOAD NO. –I
TEMPERATURE STRIP CHART RECORDER
GRAPH WITH PLC PRINTOUT

ANNEXURE NO._______.
Ci
pla
Goa

AUTOCLAVE VALIDATION

FILLING LOAD
(MINIMUM)

LOAD NO. –I

DATA AND GRAPH OF TEMPERATURE READING


OF DATA LOGGER

ANNEXURE NO._______.
Ci
pla
Goa

AUTOCLAVE VALIDATION

FILLING LOAD
(MINIMUM)

LOAD NO. –I

OBSERVATION ON CHEMICAL INDICATOR STRIPS

ANNEXURE NO._______.
Ci
pla
Goa

AUTOCLAVE VALIDATION

FILLING LOAD
(MINIMUM)

LOAD NO. –I

RESULTS OF MICROBIAL LOAD ON BIOLOGICAL


INDICATORS

ANNEXURE NO._______.
Cipla
Goa

AUTOCLAVE VALIDATION

FILLING LOAD
(MINIMUM)

LOAD NO. –I

CHAMBER TEMPERATURE AND PRESSURE


MONITORING DATA

ANNEXURE NO._______.

You might also like