Professional Documents
Culture Documents
PSA Monthly Sheet
PSA Monthly Sheet
From
To
V. Good
06 Ability to
a) Understand concepts
b) Evolve concepts
07. Ability in
a) Drafting
b) Detailing
c) Presentation
08. Ability to supervise construction
feedback obtained from site engineer
09 .Adherence to time schedules in the
given assignment
10.Ability
to
understand
procedures
11. Any other remarks
12. Signature of the Head of the
Office/Organization
13. Remarks if any
14. Signature of the HOD
office
as
Good
Fair
Poor