Professional Documents
Culture Documents
Calculations of Effective Length of Steel Columns: AS PER IS 800: 2007 (Annex D, Cl. 7.2.2)
Calculations of Effective Length of Steel Columns: AS PER IS 800: 2007 (Annex D, Cl. 7.2.2)
Client:
Project:
ABC Consultants
101, Known Street, Known Area, Known City, Pin .
Very Important Industries Ltd, Well Known City
XYZ Building
2
BtY
UC = Upper Col.
1
BtY
Framing Beams
BtZ
1
Column
Z
Beam Span (typ)
2
B bY
Ly =Column
Length
Lz =Column
Length
C = Column
considered
BbZ
2
Y Axis
BtZ
1
BbY
BbZ
1
Beam Span
(typ)
PLAN
LC = Lower Col.
Column Lengths 'Ly' , 'Lz',
and Beam Spans are centre
to centre distance of frame.
Column Mark =
ELEVATION
Z Axis
pan
m S (typ)
B ea
C7
840.00
3.500
3.500
3.500
3.500
3.500
3.500
rz
16.90
-
ry
5.26
-
Company's Name:
Client:
Project:
ABC Consultants
101, Known Street, Known Area, Known City, Pin .
Very Important Industries Ltd, Well Known City
XYZ Building
Details of Columns:(Cont'd)
Column
P ez
P ey
n = P /P e
z-z axis
y-y axis
0.1909
-
0.982
1.985
1.985
0.809
1.847
1.847
28086
28086
28086
2728
2728
2728
78762
159304
159304
6306
14398
14398
`
Details of Beams (See Elevation above):
Beam
Beam
Beam
Far end
Mk
Section
Length(m)
Connection
BtY1 ISMB 400 10
4.000 Fixed 3.000E+00
400
BtY2 ISMB10
4.000 Fixed
3.000E+00
ISMB
400
Fixed
BbY1
10
4.000
3.000E+00
400
BbY2 ISMB10
4.000 Fixed
3.000E+00
ISMB
600
Fixed
BtZ1
14
6.000
3.000E+00
ISMB14
600
BtZ2
6.000 Fixed
3.000E+00
600
BbZ1 ISMB14
6.000 Fixed
3.000E+00
600
BbZ2 ISMB14
6.000 Fixed
3.000E+00
20456
20456
20456
20456
90260
90260
90260
90260
Flexural Stiffness
K = C (I/L)
101523
101523
101523
101523
277893
277893
277893
277893
K c zz + K uc zz
K c zz + K uc zz + K bty
= (78762+159304) / (78762+159304+101523+101523)
= 0.5397
Factor 2y:
K c zz + K lc zz
= (78762+159304) / (78762+159304+101523+101523)
K c zz + K lc zz + K bby
= 0.5397
K y = 0.704
Effective Length of Column C7 along Y-Y axis (major) =
Eff. Length Factor,
3.5 x 0.704 =
2.464 m
Company's Name:
Client:
Project:
ABC Consultants
101, Known Street, Known Area, Known City, Pin .
Very Important Industries Ltd, Well Known City
XYZ Building
K c yy + K uc yy
K c yy + K uc yy + K btz
= (6306+14398) / (6306+14398+277893+277893)
= 0.0359
Factor 2z:
K c yy + K lc yy
K c yy + K lc yy + K bbz
= (6306+14398) / (6306+14398+277893+277893)
= 0.0359
Eff. Length Factor,
K z = 0.5120
1.792 m
Types of Section for Columns and Beams considered in Effective Length Calculations
ABC Consultants
101, Known Street, Known Area, Known City, Pin .
Very Important Industries Ltd, Well Known City
XYZ Building
Company's Name:
Client:
Project:
Job No.:
Design by:
Date:
Page No.
ABC/1001
UVW
21-Dec-12
C/105
HINGED 1.0
0.90
0.9
0.85
0.75
0.70
0.7
0.675
0.6
Ky = 0.7040
0.65
0.5
0.625
0.4
0.60
0.575
0.3
0.55
0.2
0.525
0.1
Kz = 0.5120
0.5
2
Column C7
Along Y-Y axis
1x =
0.5397
2x =
0.5397
Ky =
0.7040
Along Z-Z axis
1y =
0.0359
2y =
0.0359
Kz =
0.5120
HINGED
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
FIXED
FIXED 0.0
Ky = 0.7040
Kz = 0.5120
Series1
0.80
0.8
0.95