Saudi Electricity Company

CONTRACT NO. 30621127/00

SCHEDULE "8"
i.

Civil Works:
All civil works associated with the above equipment, including but not
limited to:
Main Power Plant Area:

ii

Additional or confirmatory geotechnical and topographical


surveys of the site, including ground pollution report if
necessary.

Data collection including verification of design data provided in


the tender documents.

Site preparation - excavation and filling, site grading, all


necessary ground improvement.

Site access roads, car parks and footpaths, external paving,


site surfacing with granular layer.

Utilities pipe work.

Acoustic attenuation where required to meet noise limits.

Storm, foul, oily and piant drainage systems.

Utilities and underground services.

Seturity works during construction.

Fencing and gates.

Hard and soft landscaping.

Site services (l.e, power, water, sewage and telephone) for


CONTRACTOR and COMPANY office accommodation during the
construction period.

Office and residential accommodation during the construction


period for CONTRACTOR and COMPANY.

Building works,
facilities.

foundations,

structures

and

associated

Seawater Intake and Discharge System:

Seawater lagoon, intake structure, seal weir pits, discharge


culverts, outfall structure and discharge channels and all
related piping including underground piping.

Dewatering pits.

Jelly fish retention ponds

B-8
Conversion of Open Cycle Gas Turbines to Combined Cycle at Qurayyah Power Plant
Schedule "8"