ix

i.

All required instrumentation and control for safe, reliable


and efficient operation of the major plant and associated
plant required for the conversion of the OCGT power plant
to a CCGT power plant.

Civil Works:
All civil works associated with the above equipment, including
but not limited to:
i

ii
APPROVED

AlexV

JAMIL M AL-MUTAIRI,
MANAGER, EPED

Main power plant area:

Additional
or
confirmatory
geotechnical
and
topographical surveys of the site, including ground
pollution report if necessary.

Data collection including verification of design data


provided in the tender documents.

Site preparation excavation and filling,


grading, all necessary ground improvement.

Site access roads, car parks and footpaths, external


paving, site surfacing with granular layer.

Utilities pipe work.

Acoustic attenuation where required to meet noise


limits.

Storm, foul, oily and plant drainage systems.

Utilities and underground services.

Security works during construction

Fencing and gates.

Hard and soft landscaping.

Site services, (ie power, water, sewage and


telephone) for Contractor C and Owner (SEC) office
accommodation during the construction period.

Office accommodation during the construction


period for Contractor C, and the Owner (SEC)
building
works,
foundations,
structures
and
associated facilities:

site

Seawater intake and discharge system:


QURAYYAH COMBINED CYCLE POWER PLANT
PROJECT C - CONVERSION OF OPEN CYCLE
GAS TURBINES TO COMBINED CYCLE PLANT

PTS # 07EG908
Volume 1 OF 3

Page
15 of 481