You are on page 1of 1

Safety Walk Report Form

SAFETY WALK NO.: 01


SAFETY WALK DETAILS:

DATE: 06.08.2015

Area/Locatio
n

Boiler -3

Name
Signatur

Contractor

BHEL /EDAC

Dipti Prakash Bhanja

OBSERVATIONS (Pros & Cons):


Earthing of welding machine was not proper ( Loosely connected).

GENERAL COMMENTS or FOLLOW-UP ACTIONS TO BE TRACKED:


Told to Edac Engineer and the problem is rectified.

OPGC II DISTRIBUTION:

Original to Reporting Officer/Manager


Copy to HSE&S department

OPGCII-CMT-HSE&S 102 Rev 1

Updated: 23/04/14