CHECKS TO BE MADE
IN FAGOR ARRASATE
CHECKS :
* MECHANICALS
* ELCTRICALS
* HYDROPNEUMATICS AND LUBRICATION
Correct
Project :
29036
Custom
er :
No apply
FAW JILIN
Machine
SE4-1000-4600-2400
:
Prepared by :
Iker Apraiz
Signatu
re :
Date ::
03/10/2011
ASSEMBLY CHECKS
2/15
Distance between
flywheel and motor
pulley (dimension A
according to drawing)
MEASUREMENT
APPARATUS
Vernier
calliper
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
53,5
Parallelism between
wheel and motor pulley
(dimension A in
accordance with
drawing)
Vernier
calliper
ACTUAL
VALUE
1
mm.
_________ mm.
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
3/15
MEASUREMENT
APPARATUS
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
Total play
A
ACTUAL
VALUE
A
1-Front Left
0,52-0,85 mm.
_________ mm.
2-Back Left
_________ mm.
3-Back Right
_________ mm.
4-Front Right
_________ mm.
Gauges
Connecting rod 1:
_________ mm.
Connecting rod 2:
NOTE:
Mark
the
eccentric
and
connecting rods with
corresponding
number
0,5
_________ mm.
mm .
Connecting rod 3:
_________ mm.
Connecting rod 4:
_________ mm.
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
MEASUREMENT
MEASUREMENT
APPARATUS
4/15
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
Total play between Comparison With the shafts fitted in the crown
shaft and bushing in
gauge or
measure the play between shaft and
gauges
the
seats
of
bushing, inserting the gauge along
intermediate
and
the whole length
eccentric shafts
Total play
Eccentric Shafts
0,20-0,35 mm.
ACTUAL
VALUE
Total play
Eccentric Shafts
1-1:Front Left
_________ mm.
1-2:Back Left
_________ mm.
1-3:Back Right
_________ mm.
1-4:Front Right
_________ mm.
Shaft 2
Shaft 2
2-1:Front
0,20-0,35 mm.
_________ mm.
2-2:Back
_________ mm
Shaft 3
Shaft 3
3-1
0,18-0,325 mm.
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
_________ mm.
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
MEASUREMENT
MEASUREMENT
APPARATUS
Concentricity between
fast
shaft
and
flywheel
support
(mushroom)
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
5/15
ACTUAL
VALUE
Max. dif.
0,10 mm.
_________ mm.
difference
Mx. dif.
0,20 mm.
1-2_______ mm.
3-4_______ mm.
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
6/15
KINEMATIC CHAIN
ASSEMBLY CHEKING OF ECCENTRIC GEAR IN CROWN
With the eccentric gears in B.D.C. check the alignment of gear center with eccentric center and
gear tooth reference
CORRECT
CHECKED BY :
FSG 7.3.5-2
Left
Right
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
MEASUREMENT
MEASUREMENT
APPARATUS
7/15
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
ACTUAL
VALUE
Play between the Comparison Apply the probe to the flank of one of P10,36-0,48mm. P1_______
flanks of the teeth in
gauge
the pinion teeth. Keeping the wheel
the eccentric wheel
still, move the pinion in both rotation P20,54-0,72mm. P2_______
drive gear
directions and observe the deviation
P30,54-0,72mm. P3_______
of the comparison gauge needle
mm.
P40,54-0,72mm. P4_______
mm.
Parallelism between
the flanks of the teeht
in the eccentric wheel
drive gear
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
CORRECT
mm.
mm.
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
8/15
CORRECT
COUNTERBALANCER N 1 ....................
COUNTERBALANCER N 2 ....................
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
9/15
Crown:
Screws/nuts that need to be lock with locking liquid(LOCTITE) ....................
Screws/nuts that need to be lock with steel wire ............................................
Self-locking nuts...............................................................................................
Locking washers ..............................................................................................
Slide:
Screws/nuts that need to be lock with locking liquid(LOCTITE) ....................
Screws/nuts that need to be lock with steel wire ............................................
Self-locking nuts...............................................................................................
Locking washers ..............................................................................................
REGISTRATION MARKS :
Tight
CHECKED BY :
FSG 7.3.5-2
Loose
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
10/15
MEASUREMENT
APPARATUS
Comparison
gauge
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
ACTUAL
VALUE
N1 Front left
_________ mm
N2 Back left
_________ mm
N3 Back right
_________ mm
N4 Front right
_________ mm
Surface contact
between the flanks of
the worm and crown
teeth for slide
adjustment
N1 Front left
l_________ %
t_________ %
N2 Back left
l_________ %
t_________ %
N3 Back right
l_________ %
t_________ %
N4 Front right
l_________ %
t_________ %
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
MEASUREMENT
Lateral play of
adjustment
mechanism crown in
its housing
MEASUREMENT
APPARATUS
Gauges
11/15
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
ACTUAL
VALUE
N1 Front left
h=0,07 - 0,12 mm.
_________ mm
N2 Back left
_________ mm
N3 Back right
_________ mm
N4 Front right
_________ mm
H+h=0,15-0,25mm
N1 Front left
_________ mm
N2 Back left
_________ mm
N3 Back right
_________ mm
N4 Front right
_________ mm
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
MEASUREMENT
MEASUREMENT
APPARATUS
12/15
SPECIFIED
VALUE
MEASUREMENT INSTRUCTIONS
mm
ACTUAL
VALUE
N1 Front left
_________ mm
N2 Back left
_________ mm
N3 Back right
_________ mm
N4 Front right
_________ mm
Anti-overload system
hydraulic cylinder
stroke
Vernier
calliper
25
0,50
mm
(Difference
between the four
connections
not
more than
0,30
mm)
N1 Front left
_________ mm
N2 Back left
_________ mm
N3 Back right
_________ mm
N4 Front right
_________ mm
CHECKED BY :
FSG 7.3.5-2
Front right
Back left
Front left
Back right
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
13/15
Front right
Back left
Front left
Back right
NOTE: The right, left, front and back positions mentioned in the slide checks are taken looking at the
press from the front
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
14/15
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02
ASSEMBLY CHECKS
15/15
Parallelism ..........................................................................
Check that the distance between the wheels of the moving bolster comply
with the measurements specified on the drawing
-
CHECKED BY :
FSG 7.3.5-2
CHECK DATE :
Proyect:29036
APPROVAL :
Ed.: 11-02