INTRODUCTION
The purpose of this paper is to describe the application, construction process, and design methods
for diaphragm walls, since this topic has not been addressed much if at all at previous Hershey
conferences.
Diaphragm walls are a method of creating a cast in-situ reinforced concrete retaining wall using the
slurry supported trench method. As such, they are often known as slurry walls. However, the term
diaphragm walls
Concrete diaphragm slurry walls were first introduced in the United States in the 1960s, and have
found a niche in urban environments such as Boston, New York City, and Washington, DC.
APPLICATIONS
Diaphragm walls are most commonly used :
where the geology and groundwater preclude the use of conventional earth retention systems
Compared to other wall types, diaphragm walls are considered to be very stiff with respect to
ground movement control (Clough and ORourke, 1990).
Diaphragm walls are often attractive in granular soils with a high groundwater level, especially
when a low permeability layer underlies the granular soils. The diaphragm walls are typically
terminated in the underlying low-permeability layer which can consist of soil or rock. Keying into
this low permeability layer reduces groundwater seepage below the wall. (Pearlman, 2004)
Projects that have used these walls include:
dam appurtenances
landslides
For highway projects, diaphragm walls were employed extensively on the Central Artery Tunnel
and also have been used in Denver, CO and Baltimore, MD.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 2 of 17
BENEFITS
Diaphragm walls can:
be formed to depths of several hundred feet, through virtually all soil types and through
rock, and with great control over geometry and continuity
provide structural stiffness which reduces ground movements and adjacent settlements
during excavation
be constructed in relatively low headroom (say 15 feet) and in areas of restricted access
provide economic solutions in cases where temporary and permanent support can be
integrated or redesigned into one retaining structure
Diaphragm walls combine into a single foundation unit the functions of temporary shoring,
permanent basement walls, hydraulic (groundwater) cutoff, and vertical support elements. Because
of this combination, they have proven to be an economical alternative in many circumstances
(Pearlman, 2004).
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 3 of 17
CONSTRUCTION PROCESS
Overview
The trench excavation is performed using slurry for support. The slurry is typically bentonite and
water or polymer and water.
Diaphragm walls are constructed in the following steps:
guidewall construction
endstop placement
panel desanding
tremie concrete
Excavation
Cage Placement
Tremie Concrete
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 4 of 17
Cage Fab *
~120 x panel
depth
* The cage fabrication area is dependant on the number of rigs and production schedule.
** The plant are is dependant on number of tanks.
The slurry plant includes a slurry mixer, storage tanks, and desanding units.
Sufficient storage tanks must be used for bentonite slurry hydration, several panels of bentonite,
recycled bentonite.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 5 of 17
Storage Tanks
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 6 of 17
for inserts ( anchors, slabs, etc.), support the tremie pipes, hold down the cage during concreting,
and provide reaction for jacking out some types of endstops.
Guidewalls are reinforced concrete typically four to five feet deep and constructed similar to the
figure and photo below.
The top of the guidewalls should be at least four feet above the groundwater table to allow for
construction in the dry and to allow for slurry level to be three feet above groundwater table.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 7 of 17
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 8 of 17
The excavation is performed in panels which are vertical slots. Trench stability is mostly provided
by the fluid weight of the bentonite and the arching action of the soil around the trench.
Calculations on trench stability often do not show that successfully excavated trenches should stay
open which indicates conservatism and effects that have not been considered. The bentonite slurry
is placed in the trench after a few buckets have been excavated and continuously added to maintain
at least 3 feet above groundwater level and within 2 feet of the top of the guidewall.
Panel lengths are typically 20 to 24 feet governed by the geometry of the project and the size of
contractors special clamshells. The panel width is governed by the contractors clamshells. Various
widths can be accommodated by reinforcing design including shear and bending reinforcement.
Endstop Placement
Endstops are used to control the concrete placement so that adjacent secondary panels are not
excavating monolithic concrete. Endstops may be permanent or removed after concrete placement.
Permanent endstops are typically wide flange shapes. Removable endstops can be pipe (Figure 1)
or special keyway end stops (Photo below).
Permanent Endstops
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 9 of 17
Panel Desanding
The panel must be de-sanded to remove excess sand in the slurry and bottom of panel. The removal
of sand from the slurry decreases the density of the slurry so that tremie concrete does not mix with
the slurry or trap pockets of sand.
Reinforcing Cage placement
Carefully fabricated three-dimensional reinforcing cage are then inserted into the panel excavation.
The reinforcing cage may also support future structural or utility connections using knockouts
that are pre-set in the wall. Concrete is then placed around the reinforcing cage using tremie
methods to form each concrete panel.
Cage Placement Note blockouts for floor slabs and trumpets for anchors .
Tremie Concrete
Tremie pipes are placed in the panel to within a foot of the bottom. Typically two tremie pipes are
used for full size panels and one tremie pipe is used for single bite panels. Concrete with 8 to 10
inch slump is then tremied into the panel.
The concrete mix is special to provide 4000 to 6000 psi strength with high slump and contains fairly
high cement content, often other pozzolans, plasictizers and often other chemicals.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 10 of 17
The concrete level is sounded after each load and records maintained on actual versus theoretical
concrete take. Tremie pipe sections are removed as the concrete level rises but maintained 10 feet
into the concrete.
While the concrete is being placed, the bentonite slurry is pumped back to storage tanks for
treatment and reuse.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 11 of 17
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 12 of 17
The equivalent beam method is outdated and rarely used in current practice. Discussion will focus
on the beam on elastic foundation and finite element methods. Both approaches can be used to
predict stresses, loads, and system movements.
Beam on Elastic Foundation Method (BEF)
The earth pressures are modeled with a series of independent spring supports similar to Winkler
elastic foundation model. At the start of the model, the springs are compressed to create an initial
load equal to represent a state of at-rest pressure. At each stage of excavation or support system, the
spring loads change as soil, water, and support system loads are applied or removed and lateral wall
displacement occurs. The soil springs load-displacement relationship (modulus of subgrade
reaction) is determined by the input soil stiffness and governs the spring displacement until the
limiting value of active or passive pressure is reached.
The Winkler elastic foundation model approximates the wall-soil interaction with a onedimensional model instead of a two-dimensional model that includes the soil mass, and hence does
not include the effects of arching within the soil mass.
Typically, the required soil parameters include: unit weight; at-rest, active, and passive earth
pressure coefficients; and values for the modulus of subgrade reaction for the various soils that may
affect the system. The modulus of subgrade reaction is not a true soil property, but rather depends
on both the soil conditions and the geometry of the excavation being modeled. To be
representative, the modulus of subgrade reaction needs to be adjusted based on the effective
influence zone, which varies with the size of the loaded area.
Typically, the predicted wall displacements are much more sensitive to the values of subgrade
modulus used in the analysis than the predicted brace loads and wall bending moments. Hence,
conservative selection of the modulus of subgrade values should provide conservative estimates of
ground movements, without significantly increasing the structural demand of the wall and bracing
system.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 13 of 17
The BEF method does not directly estimate vertical ground movements behind the wall. Ground
movements behind the wall are evaluated using the calculated wall displacement from the model.
An empirical relationship between wall movement and ground movements must then be used.
There are several computer programs that automate the analysis. Some use Youngs modulus as
input for the soil stiffness. The program then automatically converts the Youngs modulus values
for the various soils to adjusted values of subgrade reaction modulus using closed-form elastic
solutions.
The BEF analytical model can provide useful insights into the behavior of the wall and the wall-soil
boundary, and the automated computer programs make it easy to perform multiple analyses for
optimizing the design and evaluating sensitivity to input parameters.
Finite Element Methods (FE)
Finite element models are typically two-dimensional models that include the soil mass surrounding
the excavation. The stress-strain response of the soil is represented by a mathematical soil model
that can vary from a simple linear-elastic model to a complex nonlinear elasto-plastic model. The
stress-strain response can be defined in terms of effective stresses or total stresses. The required
input parameters depend on the soil model used.
Generally, it is desirable to use a soil model that can model failure (plastic yield) when the soil
strength is exceeded. In some problems, the ability to model volumetric changes in the soil
(consolidation or dilation) may be important. A linear elastic, fully plastic Mohr-Coulomb soil
model is often used. In this soil model, the soil acts linearly elastic until it reaches failure, defined
by the Mohr-Coulomb criterion, where upon it becomes perfectly plastic.
In contrast to the BEF analysis, the FE analysis can provide direct information on the ground
movements outside of and inside the excavation (see Figure 2 below). It can also be used to model
the soil-structure interaction response of nearby structures to the excavation-induced ground
movements.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 14 of 17
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 15 of 17
Page 16 of 17
SUMMARY
Permanent retaining walls with high groundwater tables can be economically constructed using
concrete diaphragm walls.
An introduction to construction methods was presented. Given the various options of permanent
versus temporary endstops, panel length and width, and the economics of these options; the final
design of the diaphragm wall is often done as design/build working in close cooperation with the
Owner, GC, and Engineers.
Design techniques that involve sophisticated soil structure interaction models combined with local
data and experience give a high level of confidence for predicting wall performance on projects
surrounded by other structures, where control of building movement and damage are paramount to a
successful project delivery. These models need to be calibrated to empirical predictions, and other
case histories of successful excavation support projects in similar ground conditions.
ACKNOWLEDGEMENTS
Most of the design section of this paper was prepared By Seth Pearlman, Mike Walker and Marco
Boscardin.
REFERENCES
Bonita, G. (2005) "United States Capital Visitor Center ", Proceedings of 21st Central PA
Geotechnical Conference - March 23-25, 2005
Clough, W.G. and O'Rourke, T.D., 1990. "Construction induced movements of in-situ walls."
Design and Performance of Earth Retaining Structures, ASCE GSP No.25, 439 - 470.
PLAXIS, 1998. Finite Element Code for Soil and Rock Analyses. Brokgreve and Vermeer, et al.,
(ed.), Balkema. Rotterdam, Brookfield, Version 7, A.A.
Pearlman, S.L., Boscardin, M.D., Walker, M.P. 2004. Deep Underground Basements for Major
Urban Building Construction, Presented at Geo-Support 2004, Jan. 28-31, 2004, Orlando,
FL.
Terzaghi, K., Peck, R. B., and Mesri, G., 1996. Soil Mechanics in Engineering Practice, Third
Edition, John Wiley & Sons, New York, NY, 349-360.
WALLAP, 1997. Anchored and cantilevered retaining wall analysis program, D.L. Borin, MA,
Ph.D., CEng., MICE. Geosolve, Users Manual, Version 4.
Diaphragm Walls
21st Central PA Geotechnical Conference - March 23-25, 2005
Page 17 of 17