Equipment List - Pole Change Out

BOP Gantry Crane


a. Visual inspection prior to use
b. Secondary Retention/Securing Arrangement when at deck level
1 x Chain Block 5t @ 50m
Man Hole Hand Rails
a. Scaffolding
Securing Arrangement (plan) for BOP Gantry Block/Secondary
Retention Arrangement for BOP Crane Block & Chain Block
Secondary retention for Tools working over open Man Holes
a. Drops air tools
Hold Back Chain block
a. For Umbilicals (aker)
b. For BOP Gantry Block
Slings (web for lifting Old and New Pole)
Wrench (for opening man hole) on Main Deck
a. Impact Wrench
b. Spanners
c. Allen keys (for removing Lode Star and for Removing Tcvr Head)
Forced Ventilations (Void)
Safety Harnesses (Void)
Gas detectors (Void)
UHF Radios (Void - Deck)
Long Tag Lines especially for once inside the Void