This equipment list includes tools and safety equipment needed for a pole change out project. It contains lifting equipment like a BOP gantry crane, chain block, and slings to remove an old pole and lift a new one. It also lists safety gear for working over open man holes and inside the void, such as hand rails, secondary retention arrangements, safety harnesses, gas detectors, and radios. Tools are included for opening man holes and removing transmitter heads.
Original Description:
Equipment to be prepared before changing out pole.
This equipment list includes tools and safety equipment needed for a pole change out project. It contains lifting equipment like a BOP gantry crane, chain block, and slings to remove an old pole and lift a new one. It also lists safety gear for working over open man holes and inside the void, such as hand rails, secondary retention arrangements, safety harnesses, gas detectors, and radios. Tools are included for opening man holes and removing transmitter heads.
This equipment list includes tools and safety equipment needed for a pole change out project. It contains lifting equipment like a BOP gantry crane, chain block, and slings to remove an old pole and lift a new one. It also lists safety gear for working over open man holes and inside the void, such as hand rails, secondary retention arrangements, safety harnesses, gas detectors, and radios. Tools are included for opening man holes and removing transmitter heads.
a. Visual inspection prior to use b. Secondary Retention/Securing Arrangement when at deck level 1 x Chain Block 5t @ 50m Man Hole Hand Rails a. Scaffolding Securing Arrangement (plan) for BOP Gantry Block/Secondary Retention Arrangement for BOP Crane Block & Chain Block Secondary retention for Tools working over open Man Holes a. Drops air tools Hold Back Chain block a. For Umbilicals (aker) b. For BOP Gantry Block Slings (web for lifting Old and New Pole) Wrench (for opening man hole) on Main Deck a. Impact Wrench b. Spanners c. Allen keys (for removing Lode Star and for Removing Tcvr Head) Forced Ventilations (Void) Safety Harnesses (Void) Gas detectors (Void) UHF Radios (Void - Deck) Long Tag Lines especially for once inside the Void