PLO 2G

Workshop,16 June 2010

Process Implementation New site

Process for PLO

Process Implementation Upgrade

In process upgrading TRX, there isnt used Lock Value, after Implementation, check alarm, if clear,
can be anouncement that site is on Air

Lock
Lock Value
Value

Denses Urban, Urban, Sub Urban : 3%

For Site RFI, The Measurement for lock value min 3 hourly,

Measurement
Measurement
KPI measurements statistics are measured 24 hours aggregation using
data from OSS system. Method and scope as follows:
i. For new sites : using three(3) consecutive days measurement
ii. For work description swap Network Element, Relocation
Network Element, and Relocation Expansion NE, all KPI
parameter will be monitored for 3 working days before and 3working
days after.
iii. For upgrading with additional sector/antenna
iv. For upgrading without additional antenna.

KPI Newsite

Based on Tinem 3, For Newsite we have Monitoring 6


KPI :
Voice :
1. SDSR (SDCCH Success Rate %)
2. HOSR (Hand Over Success Rate %)
3. TCHDR (TCH Drop Rate %)
Data:
1. TBFDLR (TBF Down-link Establishment Success
Rate %)
2. TBFULR (TBF uplink Establishment Success Rate
%)
3. TBFSR (TBF Success Rate %)
Additional Monitoring :
1. Traffic & TCHB
2. Share Traffic & KPI Surronding fist layer
Drive Test:
1. CSSR
2. Dropped Calls
3. HOSR
4. RX Qual 0-5
5. SQI-18
6. Idle Rx Level > -90 dBm
7. Attach Success Ratio

KPI Upgrade
Based on Tinem 3, For Upgrade we have Monitoring 6
KPI :
Voice :
1. SDSR (SDCCH Success Rate %)
2. HOSR (Hand Over Success Rate %)
3. TCHDR (TCH Drop Rate %)
Data:
1. TBFDLR (TBF Down-link Establishment Success
Rate %)
2. TBFULR (TBF uplink Establishment Success Rate
%)
3. TBFSR (TBF Success Rate %)
Additional Monitoring :
1. Traffic & TCHB
2. KPI Surronding fist layer
Drive Test for additional antenna/additional sector:
1. Idle & Dedicated Rx Level
2. RX Qual 0-5
3. SQI 0-18

Formula
Formula

KPI

NSN

SDSR (%)

100*(((SDCCH_ASSIGN+SDCCH_HO_SEIZ)(SDCCH_RADIO_FAIL+SDCCH_A_IF_FAIL_CALL+SDCCH_ABIS_FAIL_CA
LL+SDCCH_USER_ACT+SDCCH_BCSU_RESET+SDCCH_NETW_ACT+S
DCCH_BTS_FAIL+SDCCH_LAPD_FAIL+SDCCH_RF_OLD_HO+SDCCH_A
BIS_FAIL_OLD+SDCCH_A_IF_FAIL_OLD))/SDCCH_SEIZ_ATT)

TCH Drop (%)

100*sum(drop_after_tch_assign TCH_RE_EST_ASSIGN)/sum(tch_new_call_assign)

HOSR (%)

100*sum(msc_o_succ_ho+bsc_o_succ_ho+cell_succ_ho)/
(sum(msc_o_tch_tch_at+msc_o_sdcch_tch_at+msc_o_sdcch_at)
+sum(bsc_o_tch_tch_at+bsc_o_sdcch_tch_at+bsc_o_sdcch_at)
+sum(cell_tch_tch_at+cell_sdcch_tch_at+cell_sdcch_at))

TBF DL Establishment SR (%)

100-(100*Sum([NO_RADIO_RES_AVA_DL_TBF])/Sum([REQ_1_TSL_DL]+
[REQ_2_TSL_DL]+[REQ_3_TSL_DL]+[REQ_4_TSL_DL]+
[REQ_5_8_TSL_DL]))

TBF UL Establishment SR (%)

100(100*Sum(NO_RADIO_RES_AVA_UL_TBF)/Sum(REQ_1_TSL_UL+REQ_2_
TSL_UL+REQ_3_TSL_UL+REQ_4_TSL_UL+REQ_5_8_TSL_UL))

TBF Completion SR (%)

100*(1-(Sum(nbr_of_ul_tbf+nbr_of_dl_tbf-ul_tbf_establishment_faileddl_tbf_establishment_failed-ul_egprs_tbf_rel_due_no_respdl_egprs_tbf_rel_due_no_resp-ave_dur_ul_tbf-ave_dur_dl_tbful_tbf_rel_due_to_flush-dl_tbf_rel_due_to_flush-ul_tbf_rel_due_to_suspenddl_tbf_rel_due_to_suspend)/Sum(nbr_of_ul_tbf+nbr_of_dl_tbful_tbf_establishment_failed-dl_tbf_establishment_failedul_egprs_tbf_rel_due_no_resp-dl_egprs_tbf_rel_due_no_respul_tbf_rel_due_to_flush-dl_tbf_rel_due_to_flush-ul_tbf_rel_due_to_suspenddl_tbf_rel_due_to_suspend)))

2G
2GAcceptance
Acceptance Value
Value

Target for acceptance GSM/ DCS based on Cluster

NPT
NPT(Network
(Networkperformance
performanceTarget)
Target)

SDSR
KPI

NSN

SDSR (%)

100*(((SDCCH_ASSIGN+SDCCH_HO_SEIZ)(SDCCH_RADIO_FAIL+SDCCH_A_IF_FAIL_CALL+SDCCH_ABIS_FAIL_CALL+SDCCH_USER_ACT+SDCCH_
BCSU_RESET+SDCCH_NETW_ACT+SDCCH_BTS_FAIL+SDCCH_LAPD_FAIL+SDCCH_RF_OLD_HO+SDCC
H_ABIS_FAIL_OLD+SDCCH_A_IF_FAIL_OLD))/SDCCH_SEIZ_ATT)

Check SDSR

SD Bloking

Yes

Check SD on
TRX,Add
SDCCH

No

SD Drop Cause

SDRCauseRFCall

SDRCauseRFOld

Check RF,Freq,MALLID,Change Parameter

SDRCauseAbisCall

SDRCauseAbisOld

Check in Part BSC


Over shoot

SDRCauseAifCall

SDRCauseAifOld

Check in Part MSC


LAC/CI already
Create or not?

SDRCauseLAPD

Check alarm for


LAPD in BTS

HOSR
KPI

NSN

HOSR (%)

100*sum(msc_o_succ_ho+bsc_o_succ_ho+cell_succ_ho)/
(sum(msc_o_tch_tch_at+msc_o_sdcch_tch_at+msc_o_sdcch_at)
+sum(bsc_o_tch_tch_at+bsc_o_sdcch_tch_at+bsc_o_sdcch_at)
+sum(cell_tch_tch_at+cell_sdcch_tch_at+cell_sdcch_at))

CauseULLevel
Make Justification
CauseDLLevel
TCH Target Blocking,(ND 153)

CauseULQuality

No TCH Available in target cell

CauseDLQuality

Check Quality TRX, Check


Parameter

SCauseULInterference
Check Freq, TRX,

ND 153

Check HOSR

HO Analysis

HO Drop

CauseDLInterference
CauseUmbrella

Check HO LEVEL UMBRELLA

CausePBGT

Check Margin PBGT

CauseRFD

Check HOC

CauseERFD

Check HOC

CauseDR

Check ADJE

CauseSMM

Check FMT

TCHDROP
KPI

NSN

TCH Drop (%)

100*sum(drop_after_tch_assign TCH_RE_EST_ASSIGN)/sum(tch_new_call_assign)

Check TCHDROP

TCHDrop Cause

CauseRFCalll

CauseRFOld

Check freq,MALLID,Check
Parameter

CauseAbisCall

CauseAbisOld

CauseTRCall

CauseTROld

Check in BSC

Check in BSC

Oveershoot or not?

Oveershoot or not?

CauseAifCall

CauseAifOld

Check in Part MSC


LAC/CI already
Create or not?

CauseLAPD

Check alarm for


LAPD in BTS

Sample ND
ND 196

ND 196, For Check Quality


of TRX, see on Q5, if there
is measure under 90% on
Q5
UL/DL,
sucpect
problem on that TRX,
For Intrf freq must be 1.0,
if greather than 1.0,
suspect interference

ND 195

ND 195, For Check Quality


of Balance per TRX

ND 153

ND 153, for Check


Adjacency, we can see
that site blocking/HO
failure to adje

ND 232

ND 232, for check TA


(Time Advance) for
that site.

ND 70

ND 70, for check Max


Adjacency

ND 61

ND 61, for check non


symetrical
Adjaceny,(one
way adjacency)

Sample SQA Report

Share Traffic

Sample KPI Surrounding Fist Layer


HOSR GDGMEGAMENDNGMD1

On
Air

SDSR GDGMEGAMENDNGMD1

Why ??
On
Air

Sample KPI Surrounding Fist Layer


TCHDROP GDGMEGAMNGMD1

On
Air

ANALYSIS & RECOMEDATION For SDSR MEGAMENDUNGMG1


SDSR GDGMEGAMENDNGMD1

Why ??
On
Air

Analysis :
Based on TQMALL SDSR of
site
MEGAMENDUNGMG1
decrease Caused ABIS CAll
high (20-21 May). But from
22 May until now the
performance SDSR of site
MEGAMENDUNGMG1
is
good.
Recommendation: after 21
May The performance SDSR
is good so we dont need
give to recommendation.

THANK YOU