Professional Documents
Culture Documents
M/N DANSTAR
Stores
LINEA CIERRE CUBIERTA
8500
SALA DE MAQUINAS
ENTREPUENTE 1
Tween deck
Forepeack
45000
BODEGA 2
-4
12
24
20
16
28
32
40
36
44
48
3000
BODEGA 1
Hold
52
12600
BOW
THRUST
565
36000
1958
1988
ENTREPUENTE 2
1200
600
SALA DE MAQUINAS
9080
11900
6600
38400
After - peack
2092
2427
3851
6167
11900
SERVO MOTOR
4200
56
60
68
64
72
80
76
84
88
92
96
100
104
112
108
CUBIERTA PRINCIPAL
CUBIERTA DE PUERTA
ENTRE CUADERNAS 600 mm
CASTILLO PROA
d
Toilet
d
2M.
u
12
16
20
0
Galley
-4
PUENTE DE GOBIERNO
12
Off. Mess
1M.
Casing
1M.
24
20
16
28
32
40
36
44
48
52
60
68
64
72
80
76
84
88
92
96
100
104
108
112
Crews M
CHIMENEA
1M.
1M.
Stores
1M.
Toilet
Dimensions:
Length overall:
Length betw. p.p.
Breath moulded
Depth to shelterdeck
Depth to maindeckt
Height of forecastle min.
Height of boatdeck
Height of nav. bridge
Height of wheel house
Frame spac.
Draugth
Blockcoeff.
Speed
Coeficiente de block
SEGUNDA CUBIERTA
CUBIERTA DE BOTE
S2
S1
4,64 x
1,65 x
0,65
d
Maindeck
u
2Off
Stores
Steering - gear
12
16
Captain
20
-4
Casing
12
16
24
20
28
32
36
40
44
48
52
1200
56
60
64
68
72
Voltage:
88
92
96
5600
100
108
112
3000
Lubr.
oil
FONDO BODEGA
Tank no 2
Tank no 4
Aux. engines:
84
Forepeak
1Off
Machinery:
Main engine:
80
76
39400
Casing
Chain Locker
Ch.Eng
71,95m
66,00m
13,00m
6,30m
3,60m
2,10m
2,05m
2,05m
2,10m
0,60m
3,56m
0,69m
11,5 kn
0,69
Tank no 8
Tank no 5
Tank no 6
Tank no 9
After - peak
-4
12
16
Tank no 7
20
24
28
32
36
40
44
48
52
56
60
Tank no 1
Tank no 3
64
68
72
76
80
84
88
Tank no 9
92
96
100
Forepeak
104
108
FECHA
112
NOMBRE
FIRMA
PROYECTO
Tank no 1
Tank no 5
Tank no 6
DIBUJO
REVISO
APROBO
Tank no 8
Tank no 4
Tank no 2
PROYECTO/ CONSTRUCCION N
ESCALA
1:150
M/N DANSTAR
PLANO DE ARREGLO
GENERAL
PLANO N
PLANO N
1/1