Professional Documents
Culture Documents
Standards Turbine
Standards Turbine
841011
841012
841013
841090
Indian standards
IS 12800 :
Part 3 :
1991
Active
IS 12837 :
1989
Hydraulic Turbines for Medium and Large Power Houses Guidelines for Selection
Active
IS 14197 :
1994
Active
Standards
ASME PTC 18-2002, Hydraulic Turbines
and Pump - Turbines
This Code defines procedures for field
performance and acceptance testing of
hydraulic turbines and pump-turbines operating
with water in either the turbine or pump mode.
ASME PTC 29-2005, Speed Governing
Systems for Hydraulic Turbine
Generators Units
The objective of this Code is to provide uniform
test methods and procedures to determine the
performance and operational characteristics of
a hydraulic turbine speed governor. This Code
may be used to conduct factory acceptance
testing or to evaluate the current characteristics
of an installed speed governor. Not all of the
possible results that can be determined by
application of this Code need be part of every
test. Prior to testing, the parties to the test shall
agree whether the Code shall be used in whole
or in part to satisfy individual test objectives.
computing the results and the content and style of the final
report. Replaces IEC 60198 (1966) and IEC 60607 (1978). "
IEC 60193 Ed. 2.0 b:1999
"Hydraulic turbines, storage pumps and pump-turbines - Model acceptance tests "
IEC 60308 Ed. 2.0 b:2005
Hydraulic turbines - Testing of control systems
"Deals with the definition and the characteristics of control systems. It is not limited to
the actual controller tasks but also includes other tasks which may be assigned to a
control
system, such as sequence control tasks, safety and provision
for the actuating energy. The following systems are included,
speed, power, opening, water level and flow control for all
turbine types; electronic, electrical and fluid power devices;
safety devices as well as start-up and shutdown devices. "
IEC 60545 Ed. 1.0 b:1976
"Guide for commissioning, operation and maintenance of hydraulic turbines"
"Establishes suitable procedures for commissioning, operating
and maintaining hydraulic turbines and associated equipment.
Applies to impulse and reaction turbines of all types, and
especially to large turbines directly coupled to electric
generators. Also applies to pump-turbines when operating as
turbines, and water conduits, gates, valves, drainage pumps,
cooling-water equipment, generators, etc., where they cannot
be separated from the turbine and its equipment. "
"Hydraulic turbines, storage pumps and pump-turbines - Tendering Documents Part 2: Guidelines for technical specifications for Francis turbines"