Good, Better, Best The City of Copenhagen
Good, Better, Best The City of Copenhagen
Published 2011 by
The City of Copenhagen
Technical and Environmental Administration
Traffic Department
www.kk.dk/cityofcyclists
Visualisations and Graphic Design
Goodmorning Technology, LOTS Design, Public Arkitekter,
Cobe, DISSING+WEITLING architecture A/S, Visualization
Studio Olafur Eliasson and TMF Graphic Design
Photos
Troels Heien, Chr. Alsing
Additional photos
The City of Copenhagen
Copenhagen Museum
Translation
Copenhagenize Consulting
COPENHAGENERS
CYCLE
FROM GOAL
TO REALITY
COPENHAGEN MUST BECOME THE WORLDS
BEST BICYCLE CITY!
The goal was firmly set by a unanimous city council as an
integral part of the vision of Copenhagen as an Environmental
Capital. Above par conditions for cycling are also an important
200,000
2010
160,000
120,000
1970
80,000
40,000
commuting in Copenhagen.
36%
CO2-neutral
by 2025
*Average 2008-2010
A BETTER
BICYCLE CITY
A MORE
LIVEABLE
CITY
PRIORITISING
The cycle tracks of Copenhagen are already under pressure
during rush hour. It is necessary to give more space to cyclists
on the main arteries. In order to increase the sense of security,
make it possible for people to ride at their preferred speed
and, not least, to make it more attractive for those who are
too insecure to cycle today. In some places the existing cycle
tracks will be widened, in other places alternative routes
will be necessary to move some of the bicycle traffic away
from the congested routes. Infrastructure expansion will be
accompanied with campaigns focused on more considerate
behaviour in traffic.
ships within the municipality should put the bicycle onto the
WHAT
NEEDS TO
BE DONE?
City life
Comfort
Speed
Sense of
security
INNOVATION
One of the unique things about Copenhagen is our cycle tracks.
way for cars in order to create improved space for better cycling
Numbers
and Trends
150,000 people cycle each day to work or educational institutions in The City of Copenhagen.
*Average 2008-2010
7000
og cases, COWI,
2009) of bicycle initiatives
Socio-economic
analyses
6000
5000
4000
3000
2000
1000
0
2006
2008
2007
2009
2010
enough for parents to not let their children cycle to school. Just
50%
40%
30%
20%
10%
comfort greatly, as the route is separated from car traffic, and not
be found. Today, there are roughly 45,000 people who drive 2-10
0%
1998
2000
2002
2004 2006
2008
2009
2010
Target
for 2015
The modal share for bicycles has been stable for the past five
and the opening of a new metro and it is the result of the many
charges for motor vehicles will cause the cycling share to rise.
bicycle trips. Wider cycle tracks on all streets with more than
Figure 2: People who work or study in Copenhagen, divided by mode and distance to work/educational institutions
(TU-data 2008).
0 - 2 km
2 - 4.9 km
5 - 9.9 km
10 - 14.9 km
> 15 km
30,000
6,000
36,000
BICYCLE
35,000
67,000
43,000
9,000
1,000
155,000
CAR
3,000
18,000
27,000
23,000
67,000
138,000
Bus
1,000
9,000
14,000
3,000
1,000
29,000
TRAIN
1,000
4,000
13,000
13,000
43,000
74,000
OTHER
1,000
1,000
4,000
6,000
All
70,000
105,000
98,000
49,000
116,000
438,000
All
WALK
36%
7%
walk
29%
BICYCLE
car
Nordhavnsvej
Motorway expansion from
Roskilde-Flng
Metro
TRAIN
Bus
City of Copenhagens
annual bus subsidy
BICYCLE
28%
CAR
PUBLIC
TRANSIT
More space
Large-scale improvements /
start from scratch
New bridge/tunnel for
cyclists and pedestrians
New urban development
areas with perspectives
beyond 2015
plusnet
CONVERSATION CYCLING
2
3
2 Cirkelbroen
3 Bryggerampen
4 Bridge across the Inner Harbour
Stretches:
Nrrebrogade (wider cycle tracks, among other projects)
Farum Route (Bicycle Superhighway)
Albertslund Route (Bicycle Superhighway)
Svanemlle Route (Green Cycle Route)
Nrrebro Route, buen - Jagtvej (Green Cycle Route)
10
11
CITY
LIFE
12
13
17% of Copenhagen families have a cargo bike. Cargo bikes are especially
used for transporting children and shopping and they are often an alternative
to having a car. One fourth of all cargo bike owners say that their cargo
bike is a direct replacement for a car. In 2025 there will be excellent parking
facilities for cargo bikes outside of homes, institutions and shops. In addition,
cargo bikes will be an integral part of Copenhagens City Logisitics system.
Pilot projects for cargo bike parking will be replaced by standard solutions
developed in collaboration with businesses, home-owner associations and
developers.
IN 2011
CITY LIFE
FROM A TO B
IN 2025
Requirements for bicycle parking for new buildings including cargo bike
parking have been included in the Municipal Plan 2011. It has been
decided to develop and implement more cargo bike parking in 2012-2013.
The streets in 2025 can handle rush hour, peak shopping hours,
IN 2011
Funding has been allocated to ITS solutions for cyclists. Pilot projects
dynamic. LED lights in the asphalt signal which transport form has
priority and when. Certain stretches, for example, can be made oneway for cars for some periods of the day, just as cycle tracks can be
widened during the morning rush hour by taking over space from
the sidewalk. The sidewalks can then be widened during the middle
of the day when there are more pedestrians and fewer cyclists. By
letting the street follow the natural rhythm of the city and not vice
versa, there will be more vitality and a more pleasant urban space.
SHOPPING BY BICYCLE
IN 2011
in 2009 and the bicycles share of these trips was 27%. In 2025,
15
comfort
16
17
IN 2011
wider swathes.
IN 2011
Copenhagen has started the process of inviting bids for a new bike
share system that is expected to start operating in Spring 2013.
The new bicycles must be dependable and comfortable. With new
technology like smartphone apps, it will be easy to find available
and things to do in the city.
COMFORTABLE
FROM A TO B
IN 2025
BICYCLE PARKING
In 2011
Bicycle parking at Svanemllen Station was improved in 2011. The
redesigned Nrreport Station, with easier access and more bicycle
parking, will be finished in 2014. The Bicycle Butler project, where
bicycles are moved and serviced at six metro stations, has been
expanded and the efforts to clean up abandoned bicycles has been
intensified from 2011.
18
19
TRAVEL
TIME
20
21
QUICKLY
FROM A TO B
IN 2025
IN 2011
From Dybblsbro to the north side of Fisketorvet and on to
Bryggebroen: A new bicycle ramp will be completed by the end of
2012. The intersection at boulevard/Rosenrns All by The Lakes
will be redesigned in 2012 so there will be a better and faster crossing
for the many people who travel along The Lakes.
CONTRAFLOW
CYCLING ON ONE-WAY
STREETS
for cyclists have been eliminated. Travel times are reduced for
cyclists and the local traffic is better distributed.
IN 2011
Contraflow cycle tracks are being implemented in, among other
streets, Bremerholm and Gothersgade and funding has been
approved for eliminating one-way streets for cyclists in a series of
smaller streets (will be completed 2012/2013).
EFFECTIVE AND
IMPRESSIVE
SHORT CUTS
MORE PEOPLE
CYCLING FARTHER
AND QUICKER
New routes over water, railways and squares can improve travel
IN 2011
times markedly and can also make it possible to experience the city
from new and more peaceful angles. In 2025, there are many more
Den Sorte Diamant, will be completed in 2012 and the bicycle and
IN 2011
more enjoyable when several people cycle together. In 2025, there are
cyclists and the traffic lights adjust to give green lights to groups of
cyclists.
22
23
SENSE OF
SECURITY
24
25
SAFELY
FROM A TO B
IN 2025
GREEN AND
BLUE BICYCLE
CONNECTIONS
IN 2011
ROOM FOR
DIVERSITY
IN 2011
Examples: Wider cycle tracks on Nrrebrogade and Store
Kongensgade, as well as pilot projects with painted lanes on
cycle tracks 2011-2013.
IN 2011
Examples: Cycle track on H.C. Andersens Boulevard along
Rdhushaven, on parts of Rovsingsgade (close to Hans Knudsens
Plads) and lanes on Njalsgade will all be completed 2012-2013.
SMALL STEPS
HUGE EFFECT
With certain singular initiatives it is possible to increase the visibility of cyclists in traffic markedly. For example, blue bicycle lanes through intersections and pulling back the stop lines for cars
at intersections, so that cyclists are in front of the cars and have
the advantage when the light turns green.
IN 2011
These types of solutions are a part of the continuing work and will
continue in the coming years.
26
27
One Big
Construction Site
Between 2011-2018, Copenhagen will be affected
by the construction of the Metro City Ring,
Nordhavnsvej and the redesign of Nrreport
Station, as well as a long line of other projects
that will make Copenhagen an even better city.
Large areas will be closed for building sites for
years. These building sites will affect traffic
especially the transport forms that require a lot
of space like cars, buses and trains.
Vester
Voldgade
28
Hellerup
station
HELLERUP STATION
The trains on Ringbanen and through the city
VESTER VOLDGADE
A metro station will be built under City Hall Square. will be greatly affected during certain periods
Therefore, a large part of the square will become between 2012-2018. Central stations like Nordhavn
a building site between 2012-2018. During the and Svanemllen will experience reduced service.
construction period, Vester Voldgade will be closed Hellerup Station will therefore become the
to car traffic but it will still be possible to walk terminus for journeys from north of the city. A
or cycle. The result will be a safer, more pleasant modern bike share system will make it possible to
bicycle route and improved travel times for cyclists. ensure that commuters at Hellerup Station have a
The more places where it is possible to let cyclists quick and easy access to a good bicycle to use to get
and pedestrians pass despite the need for building to their final destination. An alternative to the timesites and closed streets the more attractive it will consuming and inconvenient switch to buses will
hereby be established.
be to cycle in the city.
29
RECIPE FOR
SUCCESS
Copenhagen - The City of Cyclists
Good, Better, Best here is the recipe for success:
GOALS:
MODAL SPLIT FOR BICYCLES:
2015
2020
2025
50%
50%
50%
40%
60%
80%
5%
10%
15%
80%
85%
90%
50%
60%
70%
SENSE OF SecuriTY
70%
75%
80%
75%
80%
TRAVEL TIME
ties that arent covered on the previous pages, but that are just as
ITS on, for example, routes with Green Waves for cyclists.
Lower speed limits for cars where necessary, for example around
schools.
Cooperation with the police regarding changing traffic laws, including creating contraflow on one-way streets, as well as solutions that make it possible to turn right at red lights.
COMFORT
elderly and people who use the car for short trips.
Partnerships with workplaces and educational institutions regarding bicycle facilities and information.
EXPERIENCES