You are on page 1of 16

SUBUDHI TECHNO ENGINEERS PVTLTD

checklist for reIki survey


Option
SN Details Remarks
Choice (Y/N)

Understanding about the scope of work/Specification is cleared by Survey


1
Manager/HOD/Branch Head.
Team moved to site with all relevant documents from Survey manager/HOD/Branch
2
Head.
3 Concurrent Permission of HOD/Concerned Head to conduct Reki Survey.
4 Joint Site Visit is done in Presence iof Client

If yes, Whether Client Specified Jurisdiction/boundery(start,end)of road /area/Project


If No,Immideately intimated to your concerd HOD and Branch head.
5 Any Reference documents are Supplied by client to us.

6 Workability of project area (easy/Moderate/difficult/Extream Difficult), please tick


one.
7 Availability of accomodation and other facility for survey team in near vicinity of
20Km., if not, please mentioned the distance in Km.
8 Collection of Site Photographs aare done?
If Yes,Provide details like mode of supply(physical/eloctronic to Survey Manager
along with date& time.

Whether below details are collected (Gen


9
information of site, Obstacles, critical point of concern, availability of labour, material
etc. , feasibility of mobilisation of Team etc).
Note of Visit Observation:-

10

Note of key attention area:-

11

Basic Inventory types & details:-


12

13 Duration of Reki survey with start and end Dates


14 Daily update to HOD by staff is done?
Provide details If any
Details of team mobilised to site ( Name,Designation, contact Number

15

Acknoldgeed by
Visited &Reported by Reviewed by
SUBUDHI TECHNO ENGINEERS PVTLTD

Checklist for Control Point Survey


Option Choice
SN Details Remarks
(Y/N)
Subject knowledge understanding of work is clear
Understanding about the scope of work/Specification is cleared by Survey
1
Manager/HOD/Branch Head.
Team moved to site with all relevant documents from Survey
2
manager/HOD/Branch Head.
3 Weather Reki Survey is done ?
If Yes, then proceed to survey (Ctrl point)
3 In TOR, it is specified about the primary ctrl points ?
If No, immediately intimate to survey manager/HOD/Branch head of RO
If Yes, weather to setup on permanent structure or RCC Pillars to be erected by
us ?
In case if RCC pillar erection , Specify size of pillar(L X B X D) and number
4
of pillar
5 Frequency of ctrl point (Primary/Secondary) is ensured ?
8 Weather observation parameer are followed as per TOR?
9 Weather processing parameer are followed as per TOR?
10 Do the staff update RO about daily work progress?
11 Do you agree to the correctness of ctrl points(Primary/Secondary) data ?
Total no of ctrl points fixed :-
Start date of work :-
End date of Work :-
Length of the project:-
12 Weather observation schedule is provided to HO/RO ?
If Yes, mode of communication, Date of communication,
13 Site observation Note:-
Team Details

Photo with nomenclature

Sign of Staff Acknowedge by


HOD/Superiority
14 Daily Work update

Before leave verify the survey


SUBUDHI TECHNO ENGINEERS PVTLTD
checklist for Densification of control points survey
Option
SN Details Remarks
Choice (Y/N)
Understanding about the scope of work/Specification is cleared by Survey
1
Manager/HOD/Branch Head.
Team moved to site with all relevant documents from Survey manager/HOD/Branch
2
Head.
3 Weather primary & secondary ctrol points are setup at site ?
4 Weather processed data is received by survey staff ?
4 Weather the concerned staff is educated by HOD/Surver manager ?
5 As per TOR, interval of TBM: -- M
6 As per TOR, size of pillar
7
Is the erected TBM pillars are prone to disturbance ?
8 Horizontal Traverse:-
Weather calibrated TS (e-1") is available ?
Weather all the accessories like tribach, tripod & prisom in good condition receive ?

At the commence point of traverse, weather control point co-ordinate are matching
Weather traverse formats are maintained ?

9 Vertical Traverse:-
Weather calibrated Autolevel/digital level is available ?

Weather accessories are in good condition ?


Weather GIS BM level & location is received or not ?
If yes, give GTS details :-
Weather level formats are maintained ?
Weather each clossing accuracy within limit ?

If yes - mention the accuracy :-

If no Re traverse shall be done:-

Are all the data collected accurate ?

Daily work progress updete to HO/RO


Team Details

Photographs with proper nomenclature

Weather all the process is followed ?


Weather processing distribution of horizontal & vertical errors and preparation of final
TBM list is done ?
Any Comment
SUBUDHI TECHNO ENGINEERS PVTLTD
checklist for topographical survey
Option
SN Details Choice Remarks
(Y/N)
1 Weather finalised TBM list is provided ?
2 Weather Scope of work details are received ?
3 Equipment :- Calibrated TS

4 Weather all ground features were defined and collected as per TOR ?

Weather L-Section , cross section and grid interval is followed as per


5
TOR ?
6 Weather field sketch is prepared and submitted to cadd team ?
Observation sequence format is ensured and handed over to cadd team
7
?
8 IsStandard code list followed ?
Project Specification:-
Road
9 Weather features of roads are collected ?
(Center, edge , top edge of earthen shoulder, bottom edge of
shoulder,drain & others)

10 Weather Target point surver is done for new proposed alignment ?

11 Weather required interval are mainted ?


Rail
Weather left rail @ 30 m interval in straight , @ 10m interval in curve
12
are followed ?
All mats with numbers, signals(Posts, grade posts, curve details,
13
intersections with sej and nose and other are captured ?
14 Weather formation level of embankment is captured ?
15 Weather bridge details with bridge numbers are collected ?

16 Weather station / Yard surver is done with all existing features ?


SUBUDHI TECHNOENGINEERS PVT LTD
Surveyed Raw Data checklist(For field staff/surveyor) Y/N
1 Whether surveyor knows the detailed scope for survey of the work

2 Mention the type of survey to be followed

a Highway survey (linear road project)

b Area survey (inclusive of contour)

c Hydrological survey(River/Nallah/Stream)

For hydrological survey follow the prescribed checklist

3 If linear road project mention the scope of highway improvement from the below
mentioned
i) SL (CORRIDOR WIDTH 30 M)

II)IL (CORRIDOR WIDTH 30 M)

III)DL (CORRIDOR WIDTH 60 M)

IV)DL+PS (CORRIDOR WIDTH 60 M)

V)FL (CORRIDOR WIDTH 100 M)

VI)6L (CORRIDOR WIDTH 100 M)

4 Whether all existing feathures all along the corridor has been surveyed

5 Whether type of CD type of cross road noted as code during survey

6 Whether different stretches of highway(flexible,Rigid,earthen) are noted as code in


the drawing?
7 Whether the interval of cross section are maintained regularly and per TOR

8 Whether contour points are taken at 5 min interval for area survey with all existing
feature
i
certify all features in the entire corridor are survey with accuracy and followed the
above checklist
SUBUDHI TECHNO ENGINEERS PVTLTD
checklist for topographical survey
Surveyed Drawing preparing and check (After drawn the best Y/N
drawing)
1 Whether existing feature (ex-building not overlapped ,other different
features not overlapped) are in proper arrangement

2 Whether culvert/bridge/( structure including details in proper format


are mentioned in the drawing at proper location

3 Whether G.L/Road corridor surveyed width match with below


mentioned guidelines

I) Guidelines Min Corridor width

four lane road 100(50 m each side from CL)


Two lane/two lane paved shoulder road 60m(30m each side from CL)

intermediate/single lane road 30m(15m each side from CL)

4 Minimum corridor width mentioned here however corridor width to


be checked from TOR before proceeding for survey.

5 Whether all the existing features pre drawn and arranged in layer

6 Whether cross loads category are mentioned in the drawing

7 Details of existing feature shown in the drawing or not?

(Ex-two storeyed building ,forest area,agricultural area,small


huts,cabins,shed,temple,graveyard,river,nallah,streams,water logged
area,concrete drain,cross road,earthen drain,protection wall etc)

8 TBM,TS,DGPS are properly shown in the drawing and listed in tabular


format or not ?

9 whether existing C/L LS and existing road edge line is checked


properly

i) hereby checked and prepared the survey base drawing and ground in order.
CHECKLIST FOR HYDRAULIC PARTICULAR

DO NOT
GIVE ANY
ARE THE UNNECESS
ONLY ONE L/S OF ATTACHED IS NAME IF NOT ARY
TBM PROPOSED IN RL THEN
DRAWING CATCHME DRAWING OF THE MENTION ALL THE IS POINTS CHANGE DATA/
ALL TECHNICAL DETAIL SITE PLAN CROSS ROAD (IF / NT AREA S CLEARLY ONLY WORK ED IN THE PAGES ON THE TO A LINES ETC. DESIGNATI
NAME OF THE PROJECT QUESTIONARY TBM MARKED SHOULD DRAWING SHOWING NOTE IN SECTION INDEX L/S OF L/S OF PROPOSED WITH
PHOTOGR TOPOSHEE VISIBLE/ BORE MENTION BORE LOG SHOULD CONTENTS CROSS IN SITE
STRAIGHT PLAN ON OF
CORRECT IN REPORT QUESTIONARY BE BORE WITH HFL, U/S B/S D/S EXISTING ALIGNME READABLE LOGS ARE ED IN THE MUST BE SECTION , IT OFFICERS
AND DRAWING ? MUST BE FILLED IN SITE PLAN MARKED ANNEXED HOLE SITE PLAN OFL, LWL PLAN NALLAH ROAD NT APH OF T IN ? IF NOT TO BE GEOTECH MATCHIN BE ATTACHED ARE ON A LINE AND SHOULD ARE
UP EXISTING G WITH NUMBERE THEN
WITH A LOCATION MARKIN DEVIATES CD BACKGRO PRINT IT ATTACHED NICAL CROSS D? STRAIGHT GENERATE NEAT AND CORRECT ?
ROUND FROM UNDD IN LARGE REPORT SECTION IINE CROSS CLEAN
FIG. EXISTING ) FORMAT CORRECT? WITH
PAPER SECTION COMPLETE
INFORMAT
ION
SUBUDHI TECHNOENGINEERS PVT LTD

HYDRAULIC PARTICULAR DATA SHEET FOR SURVEYOR


SL. NO DESCRIPTION YSE/NO REMARKS
Date of Survey :

Name of the Surveyor :

Lat Long of Proposed Bridge Location :


(Send office before Starting Survey)

A SURVEYOR COLLECT DATA FROM DEPARTMENT.

1 Name of the Road:

2 Name of the Nallah/Location of Nallah(Road chainage at center of bridge site)

Toposheet No for calculation catchment


3
area:

4 Catchment Area:

5 HFL(Height of water over existing Bridge):

6 OFL(Height of water over Nallah Bed):

7 LWL(Height of water over Nallah Bed):

8 Annual Rainfall Data:

9 Is the Nala Perinnial or Seasonal

Designation & Section/Sub-Divn./Divn of


10
Department Concern Persons

B FOR SURVEYOR DURING SURVEY

Contour Suvey of 50m both site of


1 Existing Bridge or Propsed Bridge Location

2 Bridge Site Cross Section

3 Existing Road Survey 500m on either side


of Bridge

U/S and D/S Cross Section location will


4 provided by office (SURVEY DEPT.)

5 Cross Section at UP Stream


6 Cross Section at Down Stream

7 LS of Nallah/River survey points taken in


5m interval

The Cross Section GL Points should be


8
perpendicular to the River/Nallah

2 Nos of TBM Marked on Bridge Site at


9 Permanent Structure/ or casting pilar at
site

1 No of TBM RL must be in round figure


10
(100.000, 150.000 )

11 Boring Location must be observed during


survey work:

Photographs & Video recording of site


12 (from U/S to D/S and Road and 4 photo of
Bridge site):

If any bridges on US or DS of the


13 River/Stream ? If Yes then mention its
span and take photo

Surveyor should mention the starting


14 Chainage whether from left or right of
bridge site

15 Hand Sketch (Showing detail dimension of existing Bridge):

16 Hand Sketch (Showing U/S & D/S and Both Side of Road):
SUBUDHI TECHNO ENGINEERS PVTLTD
CHECKLIST FOR HYDRAULIC PARTICULAR
NAME OF THE PROJECT:

NAME OF THE SURVEYOR :

1 CORRECT NAME OF THE PROJECT IN REPORT AND DRAWING ? Y / N


2 QUESTIONARY Y / N
3 ALL TECHNICAL QUESTIONARY MUST BE FILLED UP Y / N
4 TBM MARKED IN SITE PLAN (ONE MUST BE ROUND FIGURE ie. 100.000, 500.000) Y / N
5 2 NOS. OF TBM PILAR MUST BE FIXING AT SITE Y / N
6 ONLY ONE TBM DETAIL SHOULD BE MARKED WITH A ROUND FIG. e.g. 100.0,150.0,200.0 etc) Y / N
7 DRAWING ANNEXED Y / N
8 SITE PLAN SHOWING BORE HOLE LOCATION Y / N
9 NOTE IN SITE PLAN Y / N
10 CONTOUR AT BRIDGE SITE 50M IN BOTH U/S & D/S Y / N
11 CROSS SECTION WITH HFL, OFL, LWL MARKING Y / N
12 U/S CROSS SECTION Y / N
13 B/S CORSS SECTION (BORE HOLE MARKING) Y / N
14 D/S CROSS SECTION Y / N
15 INDEX PLAN Y / N
16 L/S OF NALLAH Y / N
17 L/S OF EXISTING ROAD Y / N
18 L/S OF PROPOSED ROAD (IF PROPOSED ALIGNMENT DEVIATES FROM EXISTING ) Y / N
19 DRAWING / PHOTOGRAPH OF EXISTING CD Y / N
20 CATCHMENT AREA WITH TOPOSHEET IN BACKGROUNDD Y / N
21 ARE THE ATTACHED DRAWINGS CLEARLY VISIBLE/ READABLE ? IF NOT PRINT IT IN LARGE FORMAT PAPER Y / N
22 GEOTECHNICAL INVESTIGATION REPORT MUST BE ATTACHED SEPARTATELY. Y / N
23 ONLY BORE LOGS ARE TO BE ATTACHED Y / N
24 IS CORRECT NAME OF THE WORK MENTIONED IN THE GEOTECHNICAL REPORT ? Y / N
25 IS RL MENTIONED IN THE BORE LOG MATCHING WITH CROSS SECTION? Y / N
26 ALL THE PAGES SHOULD BE NUMBERED ? Y / N
27 CONTENTS MUST BE ATTACHED Y / N
28 IS POINTS ON THE CROSS SECTION ARE ON A STRAIGHT LINE Y / N
29 IF NOT THEN CHANGE TO A STRAIGHT LINE AND THEN GENERATE CROSS SECTION Y / N
30 DO NOT GIVE ANY UNNECESSARY DATA/ LINES ETC. IN SITE PLAN , IT SHOULD NEAT AND CLEAN WITH
COMPLETE INFORMATION Y / N
31 DESIGNATION OF OFFICERS ARE CORRECT ? Y / N
DRAWINGS AND CALCULATION PREPARED BY ME

DRAWINGS CHECKED BY ME AND I AM FULLY SATISFIED

CALCULATION CHECKED BY ME AND I AM FULLY SATISTFIED.


CALCULATION CHECKED BY ME AND I AM FULLY SATISTFIED.
1
S.NO.

2
BRIDGE NO

3
LOCATION (Km.)

NAME OF RIVER

4
BRIDGE
Name of Project :

YEAR OF

5
COSTRUCTION

6
NUMBER OF SPANS

SPAN ARRANGEMENT (EXPANSION

7
JOINT TO ENPANSION JOINT)(m)

8
CLEAR SPANS

LENGTH OF BRIDGE FACE TO FACE


9
OF ABUTMENTS (m)
10

HIGH LEVEL OR SUBMISSIBLE

CLEAR ROAD WAY WIDTH


11

BETWEEN KERBS(m)

TOTAL OUTER WIDTH


12

OF BRIDGE (m)
13

WIDTH OF FOOTPATH(m)
14

GRADIENT
15

TYPE
AS PER IRC:SP:19-2001

16

TYPE OF BEARING
Surveyor Name

17

THICKNESS OF SLAB (m)


SUPER STRUCTURE

18

MATERIAL OF SLAB
DATE OF INVENTORY
BRIDGE INVENTORY & CONDITION SURVEY

HANDRAIL PARAPET
SUBUDHI TECHNOENGINEERS PVT LTD

19

THICKNESS & HEIGHT (m)


20

TYPE
COAT

21

THICKNESS(m)
WEARING
DETAILS OF

22

TYPE
23

TOP
24

BOTTOM
OF PIER(m)
THICKNESS

HEIGHT OF PIER & ABUTMENT


25

(m)
26

ABUTMENT
USED

27

PIER
MATERIALS

28

TYPE
SUB-STRUCTURE

N
PIER

29

MATERIAL
30

TYPE
N

31

MATERIAL
ABUTMENT
FOUNDATIO FOUNDATIO

32

BED
WORK

33

APPROACH
PROTECTION

34

SKEW ANGLE (Degree)

VERTICAL CLEARANCE (Below


35

Bottom of Deck Slab (m)


36

ROAD FORMATION LEVEL (m)


37

DIRECTION OF FLOW
38

ABUTMENTS
39

PIERS
40

SLAB
BRIDGE

41

BEARINGS
PERSENT CONDITION OF

42

PARAPET

CLEAR WATER
43

WAY (m)

DESIGN OF
44

LOADING
45

HIGH FLOOD LEVEL (H.F.L.)


46

LOWEST WATER LEVEL (L.W.L.)


47

DESIGN DISCHARGE (Cum/sec.)

MIXIMUM DESIGN VELOCITY


48

(m/sec.)
49

REMARKS
Subudhi Associates

SUBUDHI TECHNOENGINEERS PVT LTD


INVENTORY & CONDITION SURVEY FOR CULVERTS
AS PER IRC:SP:19-2001 Sheet No :
Road No. :
Road Name :
Section : Date of Inventory :

Details of Protection Works Condition of various features of Culvert Height above Bed level
Type of
Span Arrangement Carriage- Width of Adequacy
Structures Thickness Presence of Parapet Width of
Sl. No Location (km) and Total Ventway way width Culvert (m) of Water Remarks
(Pipe. Slab of Slab (m) Scour Length Slab
(No.x BxD) (m) (m) Internal SLab/ way
Box. Arch) Head wall/ Return Parapet/ U/S Side D/S Side
Type Condition Pipe/ Box/ Wing Wall
Abut. wall Hand Rail (m) (m)
Arch

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 17 18 19

Note: G = Good P = Poor VP = Very Poor NA = Not Avoidable B = Bad


SUBUDHI TECHNOENGINEERS PVT LTD
ROAD INVENTORY DATA SHEET
AS PER IRC:SP:19-2001
Road No. :
C
Road Name : Road Classification. : a
Section (From) (km) : Date of Inventory : r
r
i
a
Carriageway Shoulder Embankment Height (m) R
g
Land Use e
e
(Built m
Terrain(Plain/ Submergence w
From (km) To (km) Up/Agrt./Fores Name of Village/Town Type Condition Type a
a
Rolling/Hilly) Width of L/S Width of R/S Condition (cm)
t/Industrial/Ba (BT/CC/GR Width (m) (G/F/P/VP (BT/CC/ L/S R/S r
y
rren) (m) (m) (G/F/P/VP) k
/ER) ) GR/ER)
s
W
i
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ### d
t
h

(
m
)
a
r
r
i
a
Carriageway Shoulder Embankment Height (m) R
g
Land Use e
e
(Built m
Terrain(Plain/ Submergence w
From (km) To (km) Up/Agrt./Fores Name of Village/Town Type Condition Type a
a
Rolling/Hilly) Width of L/S Width of R/S Condition (cm)
t/Industrial/Ba (BT/CC/GR Width (m) (G/F/P/VP (BT/CC/ L/S R/S ry
rren) (m) (m) (G/F/P/VP) k
/ER) ) GR/ER)
s
W
i
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ### d
t
h

(
m
)
SUBUDHI TECHNOENGINEERS PVT LTD
CHECKLIST FOR INVENTORY & DATA COLLECTION (INCLUDES ROAD & CD)
NAME OF THE PROJECT:

Sl. No. CHECKPOINTS YES/NO REMARKS

1 WHETHER GPS CO-ORDINATES TAKEN?

2 WHETHER ROAD VIDEO TAKEN ?

3 WHETHER VIDEOS FOR EVERY INDIVIDUAL CD WORKS HAS BEEN TAKEN?

WHETHER ALL THE TYPE OF CD IN INVENTORY REPORT MATCHES WITH


4 VIDEOS?

WHETHER SPAN ARRANGEMENT OF ALL THE INDIVIDUAL CDS MATCHES


5 WITH VIDEOS?

6 WHETHER THE INVENTORY FORMAT CORRECTLY FILLEDUP?

7 WHETHER THE CD INVENTORY DATA MATCHES WITH SURVEY DATA?

WHETHER WIDTH OF THE EXISTING CARRIAGEWAY ARE MEASURED


8 ACURATELY AT ALL VARIABLE SECTIONS & MATCHES WITH THE SURVEY
DATA?

WHEATHER ALL THE RIGID PAVEMENT SECTIONS WITH & CHAINAGE ARE
9 MEASURED ACCURATELY & MATCHES WITH THE SURVEY DATA?

INVENTORY REPORTS ARE CHECKED BY ME ANDS I AM FULLY SATISFIED.

( K.P. DAS ) WITH DATE


COMMENTS:

( HIGHWAY SPECIALIST)