Professional Documents
Culture Documents
10
11
15
Acknoldgeed by
Visited &Reported by Reviewed by
SUBUDHI TECHNO ENGINEERS PVTLTD
At the commence point of traverse, weather control point co-ordinate are matching
Weather traverse formats are maintained ?
9 Vertical Traverse:-
Weather calibrated Autolevel/digital level is available ?
4 Weather all ground features were defined and collected as per TOR ?
c Hydrological survey(River/Nallah/Stream)
3 If linear road project mention the scope of highway improvement from the below
mentioned
i) SL (CORRIDOR WIDTH 30 M)
4 Whether all existing feathures all along the corridor has been surveyed
8 Whether contour points are taken at 5 min interval for area survey with all existing
feature
i
certify all features in the entire corridor are survey with accuracy and followed the
above checklist
SUBUDHI TECHNO ENGINEERS PVTLTD
checklist for topographical survey
Surveyed Drawing preparing and check (After drawn the best Y/N
drawing)
1 Whether existing feature (ex-building not overlapped ,other different
features not overlapped) are in proper arrangement
5 Whether all the existing features pre drawn and arranged in layer
i) hereby checked and prepared the survey base drawing and ground in order.
CHECKLIST FOR HYDRAULIC PARTICULAR
DO NOT
GIVE ANY
ARE THE UNNECESS
ONLY ONE L/S OF ATTACHED IS NAME IF NOT ARY
TBM PROPOSED IN RL THEN
DRAWING CATCHME DRAWING OF THE MENTION ALL THE IS POINTS CHANGE DATA/
ALL TECHNICAL DETAIL SITE PLAN CROSS ROAD (IF / NT AREA S CLEARLY ONLY WORK ED IN THE PAGES ON THE TO A LINES ETC. DESIGNATI
NAME OF THE PROJECT QUESTIONARY TBM MARKED SHOULD DRAWING SHOWING NOTE IN SECTION INDEX L/S OF L/S OF PROPOSED WITH
PHOTOGR TOPOSHEE VISIBLE/ BORE MENTION BORE LOG SHOULD CONTENTS CROSS IN SITE
STRAIGHT PLAN ON OF
CORRECT IN REPORT QUESTIONARY BE BORE WITH HFL, U/S B/S D/S EXISTING ALIGNME READABLE LOGS ARE ED IN THE MUST BE SECTION , IT OFFICERS
AND DRAWING ? MUST BE FILLED IN SITE PLAN MARKED ANNEXED HOLE SITE PLAN OFL, LWL PLAN NALLAH ROAD NT APH OF T IN ? IF NOT TO BE GEOTECH MATCHIN BE ATTACHED ARE ON A LINE AND SHOULD ARE
UP EXISTING G WITH NUMBERE THEN
WITH A LOCATION MARKIN DEVIATES CD BACKGRO PRINT IT ATTACHED NICAL CROSS D? STRAIGHT GENERATE NEAT AND CORRECT ?
ROUND FROM UNDD IN LARGE REPORT SECTION IINE CROSS CLEAN
FIG. EXISTING ) FORMAT CORRECT? WITH
PAPER SECTION COMPLETE
INFORMAT
ION
SUBUDHI TECHNOENGINEERS PVT LTD
4 Catchment Area:
16 Hand Sketch (Showing U/S & D/S and Both Side of Road):
SUBUDHI TECHNO ENGINEERS PVTLTD
CHECKLIST FOR HYDRAULIC PARTICULAR
NAME OF THE PROJECT:
2
BRIDGE NO
3
LOCATION (Km.)
NAME OF RIVER
4
BRIDGE
Name of Project :
YEAR OF
5
COSTRUCTION
6
NUMBER OF SPANS
7
JOINT TO ENPANSION JOINT)(m)
8
CLEAR SPANS
BETWEEN KERBS(m)
OF BRIDGE (m)
13
WIDTH OF FOOTPATH(m)
14
GRADIENT
15
TYPE
AS PER IRC:SP:19-2001
16
TYPE OF BEARING
Surveyor Name
17
18
MATERIAL OF SLAB
DATE OF INVENTORY
BRIDGE INVENTORY & CONDITION SURVEY
HANDRAIL PARAPET
SUBUDHI TECHNOENGINEERS PVT LTD
19
TYPE
COAT
21
THICKNESS(m)
WEARING
DETAILS OF
22
TYPE
23
TOP
24
BOTTOM
OF PIER(m)
THICKNESS
(m)
26
ABUTMENT
USED
27
PIER
MATERIALS
28
TYPE
SUB-STRUCTURE
N
PIER
29
MATERIAL
30
TYPE
N
31
MATERIAL
ABUTMENT
FOUNDATIO FOUNDATIO
32
BED
WORK
33
APPROACH
PROTECTION
34
DIRECTION OF FLOW
38
ABUTMENTS
39
PIERS
40
SLAB
BRIDGE
41
BEARINGS
PERSENT CONDITION OF
42
PARAPET
CLEAR WATER
43
WAY (m)
DESIGN OF
44
LOADING
45
(m/sec.)
49
REMARKS
Subudhi Associates
Details of Protection Works Condition of various features of Culvert Height above Bed level
Type of
Span Arrangement Carriage- Width of Adequacy
Structures Thickness Presence of Parapet Width of
Sl. No Location (km) and Total Ventway way width Culvert (m) of Water Remarks
(Pipe. Slab of Slab (m) Scour Length Slab
(No.x BxD) (m) (m) Internal SLab/ way
Box. Arch) Head wall/ Return Parapet/ U/S Side D/S Side
Type Condition Pipe/ Box/ Wing Wall
Abut. wall Hand Rail (m) (m)
Arch
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 17 18 19
(
m
)
a
r
r
i
a
Carriageway Shoulder Embankment Height (m) R
g
Land Use e
e
(Built m
Terrain(Plain/ Submergence w
From (km) To (km) Up/Agrt./Fores Name of Village/Town Type Condition Type a
a
Rolling/Hilly) Width of L/S Width of R/S Condition (cm)
t/Industrial/Ba (BT/CC/GR Width (m) (G/F/P/VP (BT/CC/ L/S R/S ry
rren) (m) (m) (G/F/P/VP) k
/ER) ) GR/ER)
s
W
i
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ### d
t
h
(
m
)
SUBUDHI TECHNOENGINEERS PVT LTD
CHECKLIST FOR INVENTORY & DATA COLLECTION (INCLUDES ROAD & CD)
NAME OF THE PROJECT:
WHEATHER ALL THE RIGID PAVEMENT SECTIONS WITH & CHAINAGE ARE
9 MEASURED ACCURATELY & MATCHES WITH THE SURVEY DATA?
( HIGHWAY SPECIALIST)