Work Schedule

Project: 001
Activity List
1 Plan Discussion
2 Construction Permit
3 Land Survey
4 Purchasing Cement for Foundation
5 Foundation Construction
6 Sewage & Septic line Construction
7 Fresh water supply pipe construction
8 Purchasing 2x 40' Containers
9 Purchasing Pipes (Sewage, septic, F.W.)
10 Purchasing M/S plate 3mm Thk
11 Purchasing 1x1" x 3mm angle bar
12 Fabrication Container Support
13 Installation Container Support
14 Installation and positioning of containers
15 Purchasing of Wire mesh
16 Installation of wire mesh (outside)
17 Installation of steel side supports
18 Door Cutting
19 Installation of angle bar inside Container
20 Purchasing angle bar
21 Cutting container for windows space
22 Cementing outside wall (container)
23 Installation of wire mesh inside toilet area (uper
container)
24 Purchasing Fiber cement for toilet wall (uper
container)
25 Cement flooring installation (container)
26 Fiber Cement wall installation
27
Inside container ply wood panelling guide
28
installation (Living room and Bed room area)
29 Cutting hole for Toilet line, drain line and FW supply
pipe line
30 Inside wood wall installation (Container)
31 Door Installation
32 Door Fabrication
33 Roof framing installation for ground floor
34 Outside wall installation
35 2nd floor installation
36 stairway installation
37 Gate fabication
38 Gate installlation

39 Tile dcor installation (wall)


40 Paint Application
41 Shower and toilet installation
42 Countertop / sink installation
43 Electrical Initial Installation
44 Electrical Final Installation
45 House Blessings

April
8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

(or earlier march 20?)


(or earlier march 21?)

May
4

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

30 31