12#-8Nos.
9"
COLUMN C-1
COLUMN C-2
18"
18"
25#-8Nos.
#8-6"C/C
RINGS
#8-6"C/C RINGS
COLUMN SECTION
C-1
COLUMN SECTION
C-2
12#-8Nos.
25#-8Nos.
#8-6"C/C RINGS
#8-6"C/C RINGS
COLUMN SIZE-9"X18"
COLUMN SIZE-9"X18"
12#-13NOS. BOTHWAYS.
12"
12"
12#-13NOS. BOTHWAYS.
18"
6"
6"
18"
18"
5'
5'
FOUNDATION SECTION
FOUNDATION SECTION
25#-8 NOS.
18"
18"
COLUMN C-4
25#-12 Nos.
18"
18"
COLUMN C-3
RINGS 8#-8" C/C
COLUMN SECTION
25#-12 NOS.
25#-8 NOS.
C-3
COLUMN SECTION
C-4
RINGS 8#-8"C/C
RINGS 8#-6"C/C
12#-15NOS. BOTHWAYS.
18"
18"
12#-15NOS. BOTHWAYS.
6'
6'
FOUNDATION SECTION
18"
FOUNDATION SECTION
COLUMN C-5
25#-16 Nos.
18"
25#-16 NOS.
COLUMN SECTION
C-5
RINGS 8#-6"C/C
COLUMN SIZE 18"X18"
18"
12"
18"
12"
18"
18"
12"
7'
GENERAL NOTES:1.All Dimensions are in inches and feet unless noted otherwise.
2.Grade of concrete mix shall be M:20 conforming to IS:456-2001
3.Reinforcement shall be high strength deformed bars of Grade Fe:415
confirming to IS:1786- 1985.
4.Cover to reinforcement shall be as follows:Foundation
- 50mm
Column
- 40mm
Slab
- 15mm
Beam
- 25mm
5.Not more than half the column bars shall be lapped at a section.
6.Lap length shall be 50 times the diameter of bar.
7.Lap in Slab and Beams of superstructure close to mid-span for bottom bars
and close to support for top bars shall be avoided.
8.Ties/Rings/Distribution reinforcement shall be provided of 8#-8" c/c
otherwise mentioned.
9.Shear Key shall be left at column beam joint.
10.Camber @4mm per metre shll be provided in beams.
1
11.Cantilever shuttering shall be lifted by 50
th of projected length.