Q

m
m /dt
1
2
0.898
1.532
Sumber: Perhitungan
Keterangan :
1. data
2. data
3. data
4. data
3

m/dt
3
0.510

m
4
0.766

m
5
1.500

5. tabel 2.4 (kp-04)


6. (7)/(5)
7. coba-coba
8. (7)-((3)^2/19.62)

Perhitungan Pintu Romijn Saluran Sekunder (SS.1 Ta 1)


H1/L
H1
h1
p1
A*
6
0.331

m
7
0.497

9. (4)-(8)
10. (2)*(8)
11. (2)*(4)
12. 0,93+(0,1*(6))

m
8
0.484

m
9
0.282

m
10
0.742
2

A
m
11
1.174

Cd

Cd.A*/A

Cv

Qhit

14
1.060

m3/dt
15
0.898

12
0.963

13
0.608

13. (12)*((10)/(11))
14. gambar 2.3 (kp-04)
15. (12)*(14)*(2/3)*(((2/3)*9.81)^0.5)*(2)*(8)^1.5

Tabel 3.4. Pola Operasi Pintu Sorong Sal. Sekunder Pintu 2


q
A
Q
a
h1
bulan
lt/dt/ha
ha
m3/dt
m
m
1
2
3
4
5
6
Januari
1.607
400
0.321
0.165 0.871
Februari
1.676
400
0.335
0.173 0.871
Maret
1,120
400
224.000
0.113 0.871
April
0,747
400
149.400
0.071 0.871
Mei
0.600
400
0.120
0.058 0.871
Juni
0,888
400
177.600
0.090 0.871
Juli
0,665
400
133.000
0.066 0.871
Agustus
1,713
400
342.600
0.171 0.871
September 1,554
400
310.800
0.155 0.871
Oktober
1,973
400
394.600
0.200 0.871
November 1,174
400
234.800
0.115 0.871
Desember 1.600
400
0.320
0.160 0.871
keterangan :
1. data
2. data (PTT PU irdas)
3. data (PTT PU irdas)

4. ((2)*(3))/1000
5. tinggi bukaan pintu
6. tinggi muka air hulu

h1/a
7
5.279
5.035
7.708
12.268
15.017
9.678
13.197
5.094
5.619
4.355
7.574
5.444

8
0.561
0.559
0.571
0.600
0.600
0.572
0.580
0.579
0.580
0.568
0.589
0.578

7. (6)/(5)
8. gambar 3.4 (kp-04)
9. gambar 3.3 (kp-04)

2g

Qhit

9
1
1
1
1
1
1
1
1
1
1
1
1

m
10
0.838
0.838
0.838
0.838
0.838
0.838
0.838
0.838
0.838
0.838
0.838
0.838

m/dt2
11
19.62
19.62
19.62
19.62
19.62
19.62
19.62
19.62
19.62
19.62
19.62
19.62

m3/dt
12
0.321
0.335
0.224
0.148
0.121
0.178
0.133
0.343
0.311
0.394
0.235
0.320

10. lebar sal. Tersier


11. 2*9.81
12. (8)*(9)*(5)*(10)*((2*9.81)*(6))^0.5