You are on page 1of 2

Mbagne site

Performance Analyse
critical site
Power on Date : 2015-09-15 03 :26
Peak record :
DC maximum voltage
<DC_Volt.Max.>54.7V</DC_Volt.Max.>

2015-09-15 09:49:04

DC minimum voltage
<DC_Volt.Min.>45.9V</DC_Volt.Min.>

2015-09-19 23:13:42

The site have execute the first shunt down because the starting voltage for the
DG was set at the same point with primary power down votage. Now Fisrt shunt
down is 46 v and dg starting voltage is 47.5 v

Charge current max


<Chg.Curr.Max._1> 257.1A</Chg.Curr.Max._1>

2015-09-19 09:49:02

DisCharge current max


<Disch.Curr.Max._1>-103.2A</Disch.Curr.Max._1>

2015-09-18 20:18:02

Load Current Max


<Load_Curr.Max.>149.2A </Load_Curr.Max.>

2015-09-17 20:05:02

PV current Max
<PV_Curr.Max.> 213.4A </PV_Curr.Max.>

2015-09-15 12:44:02

Correct because we have set solar charge coef to 0.10 so the max is 0.10 x 3000
= 300 A.

Energy_Record
<Date>2015-09-15</Date>
<PV_Production>55.89kWH</PV_Production>

<Load_Consumption>67.01kWH</Load_Consumption>
<Date>2015-09-16</Date>
<PV_Production>54.91kWH</PV_Production>
<Load_Consumption>87.78kWH</Load_Consumption>

<Date>2015-09-17</Date>
<PV_Production>61.40kWH</PV_Production>
<Load_Consumption>88.01kWH</Load_Consumption>
<Date>2015-09-18</Date>
<PV_Production>61.82kWH</PV_Production>
<Load_Consumption>88.03kWH</Load_Consumption>