Standard Code SP66
Standard Code SP66
OF
CONTINUOUS BRIDGES
2014
IRC:SP: 66-2005
OF
CONTINUOUS BRIDGES
Published by
(Plus
& Postage
^^
^^^age)
IRC:SP:66-2005
First
Published
Reprinted
2005
July,
August, 2008
(The
official
in
its
amendments
to this
effective
which
shall
be considered as
(500 copies)
etc.
from the
IRC:SP:66-2005
CONTENTS
Page
Personnel of the Bridges Specifications and Standards Committee
(i)&(ii)
1.
Introduction
2.
Scope
3.
Definitions
4.
Impact Factor
5.
Continuous Bridges
6.
Bridges
7.
References
.2
5
IRC:SP:66-2005
2.
V.K. Sinha
3.
Road Transport
Velayutham
( Convenor)
V.
&
Co-Convenor)
Highways,
Highway,
S&R
New
New
Delhi
Delhi
Ministry of Shipping,
(Member-Secretary)
(A.N. Dhodapkar)
Members
4.
K.N. Agrawal
5.
S.
6.
C.R. Ahmchandani
Ahmed
PWD, Shillong
STUP Consultants
Chairman
&
Managing
Director,
Ltd.,
Mumbai
7.
A.K. Banerjee
New Delhi
8.
Ashok Basa
9.
P.C. Bhasin
10.
S.S.
Chakraborty
Managing
New
(I)
Pvt. Ltd.,
Delhi
11.
K.K. Gupta
12.
A.R. Jambekar
Chief Engineer
&
Faridabad
19,
CIDCO, NAVl
Mumbai
13.
S.K. Jain
Director
Standards,
14.
S.K. Kaushik
Delhi
Chairman, Estate
IIT,
Kand
New
&
Works
&
Coordinator
(TIFAC-CORE)
Roorkee
Consultant, Bhopal
15.
C.V.
16.
Ninan Koshi
17.
Prafulla
18.
RY. Manjure
19.
N.V. Merani
20.
M.K. Mukherjee
21.
A.D. Narain
Kumar
DG
DG (RD) &
AS,
Secy.,
MORT&H
S.K. Puri
(Retd.),
H-54, Residency
Noida
Mumbai
New Delhi
MOST
&
Addl. Secretary,
MOST
NOIDA
Highways
23.
N. Rajagopalan
Chennai
24.
M.V.B. Rao
A- 181,
Sarita Vihar,
(i)
New Delhi
IRC:SP:66-2005
Subba Rao
Mumbai
25.
Dr. T.N.
26.
S.A. Reddi
27.
Director
Highway Research
28.
G. Sharan
29
N.K. Sinha
DG
(RD)
&
SS,
Chitranjan Park,
M.G. Tamhankar
Dr.
31
Mahesh Tandon
Managing
RB. Vijay
A-39/B,
(Shri S.K.
32.
33.
Planning
Chennai
MORT&H
(Retd.) G-1365,
Director,
Tandon Consultants
Floor,
Mumbai
(P) Ltd.,
New Delhi
& Budget
34.
HQ DGBR,
35.
36.
Chepauk, Chennai
37.
R. Subramanian
Engineer-in-Chief,
38.
Rep. of
RDSO
PWD, New
Delhi
(B&S) Bidges
Members
Momin), Secretary
Maharashtra
39.
President,
40.
Director General
(Road Development)
Highways,
Secretary,
IRC
(S.S.
& Structures
RDSO, Lucknow
Ex-Ojficio
IRC
41.
Ground
Delhi
30.
.
Station,
New
Ltd.,
New
(R),
PWD, Mumbai
Delhi
Roads Congress,
New
Kama
Koti Marg,
Delhi
Corresponding Members
1.
M.K. Agarwal
Engineer-in-Chief, Haryana
2.
M.K. Bhagwagar
3.
A. Chakraborti
4.
(ii)
CPWD, New
New
Delhi
Delhi
IRC:SP:66-2005
INTRODUCTION
1.
At
1.2.
its first
Committee
1.1.
felt that in
construction
programme
to bring out
in
was under
was necessary
that
it
following personnel:
IRC Codes
NinanKoshi
Addl.
T.
Viswanathan
was decided
Convenor
Co-Convenor
It
...
...
Member-Secretary
the guidelines
...
DGBR
EURO
Members
Alok Bhowmick
A.N. Dhodapkar
Vinay Gupta
wherever
its
its
several
meeting held on
3"^
S.D. Limaye
M.K. Mukerjee
Dr. A.K. Mulhck
Rajagopalam
2005
G.R Saha
R.S. Sharma
Dr.
in Bangalore
modifications.
N.K. Sinha
K.B. Thandavan
S&R,
for
pubUcation.
MOSRT&H
Ex-Ojficio
2.
Members
IRC
Momin)
President,
(RD)
initial draft
Jose Kurian
DG
codes,
S.G. Joglekar
(S.S.
The
1.3.
G.R. Haridas
C.E. (B)
AASHTO
necessary.
A.K. Banerjee
Dr. N.
and
SCOPE
The
MOSRT&H
bridges
(Indu Prakash)
Secretary,
(R.S.
IRC
a) Continuous Bridges
Sharma)
b) Bridges
slabs.
Corresponding Members
Ashok Basa
C.V. Kand
The guidelines
IRC:SP:66-2005
or in prestressed concrete or precast girder
bridges
loads
made
&
live load
diaphragm
at
by providing
account
all
superimposed
in-situ concrete
5.1.2.
The
effects of creep
and shrinkage of
at
support.
It
shall
be read
relevant
5.1.3.
DEFINITIONS
3.
IRC Codes.
Secondary effects due
to hyperstatic
Continuous Bridges
Continuous bridge
is
methods.
,.
Due account
shall
5.1.4.
at
shall
be
Bridges
creep redistribution.
Deck Slab
5.1.5.
deck
which
shear shall be as
follows
slab.
(i)
When
IMPACT FACTOR
4.
The
live load
impact
support
may be
'd'
at
as that
computed
When
at
distance
'd'.
(ii)
of the
(ii)
5.2.
5.
member
at that section.
(iii)
at the
is
Design
placed.
CONTINUOUS BRIDGES
may be
equation'^'
5.1. Analysis
Mj = (M - qaV8)
or 0.9M, whichever
where,
5.1.1. Elastic
method of analysis
shall
calculated by
be used to
is greater,
IRC:SP:66-2005
Stifch
nrcox
'^^
llUiaJJ-U-
lt3
a)
Bridge
ItJ
c) Incremental
Launching Method
b)
pCost
in [situ
-Precast Girder
-mm
d) Precast Girders
asT
Made continuous by
vsmr
in situ
slab
& Diaphragm
(ForSIDL&LL)
Fig.
Methods of Achieving
continuity in Bridge
Deck
IRC:SP:66-2005
= Reaction
= Width of Bearing
= R/a
(Refer Fig.
Fig. 2.
5.3.
Dimensioning
&
Detailing
Bearing Layout
&
a)
2).
is
in Figs. 3,4
an important
Fig.
& 5 respectively.
in the Fig. 3,
4 and 5
Movements: The
task,
intermediate support
girders,
5.3.1.
at the
Methods of
to the substructure.
In case of stage
by stage construction,
stability
5.3.2.
by
suitable
means, which
shall
The
forces transferred
be clearly spelt
continuous bridge
is
is
concentration of stress
Figs. 3,
4 and
reinforcement
5.
may be
tie
at the
required to be provided
IRC:SP:66-2005
Span Length,
Span Length, L2
LI
4^
^
^^
-$
^4-
>
Free Bearing
(V)
Fixed bearing
Guided Bearing
Continuous Bridges
which
shall
is
6.
be designed to resist
MADE CONTINUOUS
THROUGH DECK SLAB
BRIDGES
Fig.
slab,
5.3.3.
When
Type
1:
in
coupled
at
slab
is
continued monolithically
lRC:SP:66-2005
^^^^
Free Beoring
Fixed Bearing
Guided Bearing
Pin
beoring
Continuous Bridges
IRC:SP:66-2005
The length of
girders.
to
is
moment continuity
it
simple in design
at the supports.
slab.
For
is
Type 2
doweUing
in
to
(Fig. 8).
medium span
is
lengths and
minimising
is
aimed
at
shall
be
left
Gaps
However
quality.
deck surfacing.
7.
REFERENCE
It
IRC,
of structural
BS,AASHTO
or BEARING/
||NTRMEDIATE SUPPORT
Precc3st
1-
r
-\
a)
q.
OF TREE BEARING
q_
OF FIXED BEARING
beam
Precast
At Intermediate Support
a)
^
Q_
beam
of
pier
-11-,|
Q.
beam
Precast
beam
OF FREE BEARING
Separated decl<
Compresible
tiller
in
slob lengtti
between
Cost
in
situ
Slab
Beam
(6mm mimimum)
(i OF FIXED BEARING
Precast
Precast
Beam
b)
OF FREE BEARING
At End Support
r[d= ANCHORAGE LENGTH OF BAR
b)
A I INFLUENCE WIDTH
Fig. 6.
Beam
Cast in situ
Diaptiragm
REINFORCEMENT
Fig. 7.
at
Connection Type
Continuous separated
Deck Slab
Fixed Bearing
IRC:SP:66-2005
of
Precast
pier
beam
Precast
beam
1^
4'
1
Crack-induceX
filled
with
slot in surfacing
rubDr/bitunnen seal
Higti
yield
strength
Detail
Fig. 8.
publication,
ttie
editions indicated
were
valid. All
&
7.1
Codes
1.
Specifications
IRC:SP:66-2005
2.
6.
Highway Bridges
BS
5400:Part
4:
&
Publications
Economy
(Third Revision)
4.
Papers
Code of
2.
AASHTO
LRFD
Bridge
Design
Zurich.
lABSE
its
effective