You are on page 1of 2

M.V.

Tanguar Haor
L WL (m)

B MLD (m)

T (m)

B/T

Cb

Displacement (Tonne)

Parent Data

40.79

8.50

L/B
4.80

1.40

6.07

0.59

285.00

Optimization a

44.60

8.00

5.58

1.40

5.71

0.57

285.00

Design modific

44.60

8.00

5.58

1.60

5.00

0.57

325.00

T (m)

B/T

Cb

Displacement (Tonne)

M.V. Sea Pental


L WL (m)

B MLD (m)

L/B

Parent Data

42.00

9.15

4.59

3.35

2.73

0.84

1077.56

Optimization a

46.00

9.00

5.11

3.35

2.69

0.78

1077.62

Design modific

46.20

9.00

5.13

3.50

2.57

0.74

1076.92

T (m)

B/T

Cb

Displacement (Tonne)

M.V. Ahmedullah
L WL (m)

B MLD (m)

L/B

Parent Data

50.67

10.68

4.74

1.80

5.93

0.81

789.00

Optimization a

50.67

10.68

4.74

2.00

5.34

0.73

790.09

Design modific

46.20

9.00

5.13

3.50

2.57

0.74

1076.92

GRT

EEDI Reduced EEDI Reference


Attained EEDI (%)
(Proposed)

Speed (knots)

Main Engine (kW)

270.21

11.00

522.00

0.28

107.75

270.00

11.00

443.00

0.27

91.90

14.71

86.38

293.00

11.00

431.00

0.27

82.50

23.43

85.09

Speed (knots)

Main Engine (kW)

748.00

8.50

460.00

0.22

44.73

748.00

8.50

346.28

0.21

33.60

24.88

34.97

748.00

8.50

330.00

0.21

31.97

28.53

34.97

Speed (knots)

Main Engine (kW)

604.00

9.00

526.00

0.21

59.72

604.00

9.00

350.00

0.21

39.66

33.59

41.52

748.00

8.50

330.00

0.21

31.97

46.47

41.52

DWT

DWT

Fn

86.37

EEDI Reduced EEDI Reference


Attained EEDI (%)
(Proposed)

Fn

34.97

EEDI Reduced EEDI Reference


Attained EEDI (%)
(Proposed)

Fn

41.52

You might also like