Pile Load Capacity ( BH-1<Sofoco>)

Pile 500 x 500 mm


Pu

( 25 x Np x Ap ) +

( Ns x Ls + Nc x Lc ) x K
5
2

Pu = Ultimate pile load capacity (Ton)


Np = Average Nvalue ( 4xDia above and 1xD below pile toe)
Ap = Pile area (m2) = 0.25 x phi x (Dia.)2
Ns = Average Nvalue at Sand layer
Ls = Depth of Sand layer
Nc = Average Nvalue at Clay layer
Lc = Depth of Clay layer
K = Perimeter of pile (meter)
P allowable = Pu / 3
1. Data

SF = 2 (Clay)
= 5 (Sand)

No.

Elevasi

BOC
1
2
3
4
5
6
7
8

-1.50
-4.00
-4.50
-6.00
-7.50
-9.00
-10.50
-12.00
-13.50
-15.00

Soil Type

Clay
Clay
Clay
Clay
Clay
Clay
Clay
Sand

SF

N SPT

NxLxK
SF

2
2
2
2
2
2
2
5

12
6
2
4
7
16
25
39
33
50

0.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

1.00
6.00
10.50
24.00
37.50
58.50
49.50
30.00

11.00

216.00

Pile 400 x 400 mm / Tiang Pancang


K =

###

2.00 m

Ap = 0.50

###

0.25 m

Pu = 25

36

0.25

216.00

443.5
3

148

Ton

Daya dukung tekan =

Daya Dukung Tiang Pancang SPT 50cm x 50 cm


Proyek Belmont Residence

443.5

Daya dukung tarik

216.0
5

Daya Dukung Tiang Pancang SPT 50cm x 50 cm


Proyek Belmont Residence

43

Ton

Pile Load Capacity (BH-2<Sofoco>)


Pile 500 x 500 mm
Pu

( 25 x Np x Ap ) +

( Ns x Ls + Nc x Lc ) x K
5
2

Pu = Ultimate pile load capacity (Ton)


Np = Average Nvalue ( 4xDia above and 1xD below pile toe)
Ap = Pile area (m2) = 0.25 x phi x (Dia.)2
Ns = Average Nvalue at Sand layer
Ls = Depth of Sand layer
Nc = Average Nvalue at Clay layer
Lc = Depth of Clay layer
K = Perimeter of pile (meter)
P allowable = Pu / 3
1. Data

SF = 2 (Clay)
= 5 (Sand)

No.

Elevasi

BOC
1
2
3
4
5
6
7

-1.50
-4.00
-4.50
-6.00
-8.00
-10.00
-11.50
-14.00
-15.00

Soil Type

Clay
Clay
Sand
Clay
Clay
Clay
Sand

SF

N SPT

NxLxK
SF

2
2
5
2
2
2
5

17
14
3
5
20
19
24
27
50

0.50
1.50
2.00
2.00
1.50
2.50
1.00

1.50
7.50
16.00
38.00
36.00
67.50
20.00

11.00

186.50

Pile 450 x 450 mm / Tiang Pancang


K =

###

2.00 m

Ap = 0.50

###

0.25 m

Pu = 25

32

0.25

186.50

384.0
3

128

Ton

Daya dukung tekan =

Daya Dukung Tiang Pancang SPT 40 cm x 40 cm


Proyek Belmont Residence

384

Daya dukung tarik

186.5
5

Daya Dukung Tiang Pancang SPT 40 cm x 40 cm


Proyek Belmont Residence

37

Ton

Pile Load Capacity ( BH-1<Sofoco>)


Pile400 x 400 mm
Pu

( 25 x Np x Ap ) +

( Ns x Ls + Nc x Lc ) x K
5
2

Pu = Ultimate pile load capacity (Ton)


Np = Average Nvalue ( 4xDia above and 1xD below pile toe)
Ap = Pile area (m2) = 0.25 x phi x (Dia.)2
Ns = Average Nvalue at Sand layer
Ls = Depth of Sand layer
Nc = Average Nvalue at Clay layer
Lc = Depth of Clay layer
K = Perimeter of pile (meter)
P allowable = Pu / 3
1. Data

SF = 2 (Clay)
= 5 (Sand)

No.

Elevasi

BOC
1
2
3
4
5
6
7
8

-1.50
-4.00
-4.50
-6.00
-7.50
-9.00
-10.50
-12.00
-13.50
-15.00

Soil Type

Clay
Clay
Clay
Clay
Clay
Clay
Clay
Sand

SF

N SPT

NxLxK
SF

2
2
2
2
2
2
2
5

12
6
2
4
7
16
25
39
33
50

0.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

0.80
4.80
8.40
19.20
30.00
46.80
39.60
24.00

11.00

172.80

Pile 400 x 400 mm / Tiang Pancang


K =

###

1.60 m

Ap = 0.40

###

0.16 m

Pu = 25

36

0.16

172.80

318.4
3

106

Ton

Daya dukung tekan =

Daya Dukung Tiang Pancang SPT 40 cm x 40 cm


Proyek Belmont Residence

318.4

Daya dukung tarik

172.8
5

Daya Dukung Tiang Pancang SPT 40 cm x 40 cm


Proyek Belmont Residence

35

Ton

Pile Load Capacity (BH-2<Sofoco>)


Pile 400 x 400 mm
Pu

( 25 x Np x Ap ) +

( Ns x Ls + Nc x Lc ) x K
5
2

Pu = Ultimate pile load capacity (Ton)


Np = Average Nvalue ( 4xDia above and 1xD below pile toe)
Ap = Pile area (m2) = 0.25 x phi x (Dia.)2
Ns = Average Nvalue at Sand layer
Ls = Depth of Sand layer
Nc = Average Nvalue at Clay layer
Lc = Depth of Clay layer
K = Perimeter of pile (meter)
P allowable = Pu / 3
1. Data

SF = 2 (Clay)
= 5 (Sand)

No.

Elevasi

BOC
1
2
3
4
5
6
7

-1.50
-4.00
-4.50
-6.00
-8.00
-10.00
-11.50
-14.00
-15.00

Soil Type

Clay
Clay
Sand
Clay
Clay
Clay
Sand

SF

N SPT

NxLxK
SF

2
2
5
2
2
2
5

17
14
3
5
20
19
24
27
50

0.50
1.50
2.00
2.00
1.50
2.50
1.00

1.20
6.00
12.80
30.40
28.80
54.00
16.00

11.00

149.20

Pile 450 x 450 mm / Tiang Pancang


K =

###

1.60 m

Ap = 0.40

###

0.16 m

Pu = 25

32

0.16

149.20

275.6
3

92

Ton

Daya dukung tekan =

Daya Dukung Tiang Pancang SPT 40 cm x 40 cm


Proyek Belmont Residence

275.6

Daya dukung tarik

149.2
5

Daya Dukung Tiang Pancang SPT 40 cm x 40 cm


Proyek Belmont Residence

30

Ton

Rekapitulasi Hasil Perhitungan Daya Dukung Tiang Tekan & Tarik


Dengan Menggunakan N-SPT

Lokasi

Kedalaman

L Efektif

Pile 500x500

Pile 400x400

Tekan (Ton) Tarik (Ton) Tekan (Ton) Tarik (Ton)

BH-1

-15.00

11 m

148

43

106

35

BH-2

-15.00

11 m

128

37

92

30

137.92

40.25

99.00

32.50

rata-rata =

maka berdasarkan hasil pengecekan tsb diatas untuk perencanaan diambil


Pile 500x500
Daya Dukung Tekan= 130 Ton
Daya Dukung Tarik = 40 Ton
Pile 400x400
Daya Dukung Tekan= 90 Ton
Daya Dukung Tarik = 30 Ton

Daya Dukung Tiang Pancang berdasar N-SPT


Proyek Belmont Residence

Rekapitulasi Hasil Perhitungan Daya Dukung Tiang Tekan & Tarik


Dengan Menggunakan N-SPT
Sofoco
Pile 400 x 400 mmKedalaman

L Efektif

Tekan (Ton)

Tarik (Ton)

DB-1

-15.00

11 m

106

35

DB-2

-15.00

11 m

92

30

Kesimpulan :
Rekomendasi dari PT. Solefound Sakti / Ir.Soerjatmo Wreksoatmodjo
Daya Dukung Tekan
= 120 Ton
Daya Dukung Tarik
= 22 Ton ( diluar berat sendiri tiang )
maka berdasarkan hasil pengecekan tsb diatas untuk perencanaan diambil
Daya Dukung Tekan
= 90 Ton
Daya Dukung Tarik
= 30 Ton

Daya Dukung Tiang Pancang SPT 40 x 40 cm


Proyek Belmont Residence

Rekapitulasi Hasil Perhitungan Daya Dukung Tiang Tekan & Tarik

Berdasarkan N-SPTBerdasarkan nilai Cu dan Nc


Pile 500 x 500 mmKedalaman L Efektif Tekan (Ton) Tarik (Ton) Tekan (Ton)
Tarik (Ton)
BH-1
-15.00 m
11 m
148
43
100
50
BH-2
-15.00 m
11 m
128
37
75
40

Kesimpulan :
Rekomendasi dari PT. Solefound Sakti / Ir.Soerjatmo Wreksoatmodjo
Daya Dukung Tekan
= 120 Ton
Daya Dukung Tarik
= 22 Ton ( diluar berat sendiri tiang )
maka berdasarkan hasil pengecekan tsb diatas untuk perencanaan diambil
Daya Dukung Tekan
= 140Ton
Daya Dukung Tarik
= 40 Ton