P-R-O-J-E-C-T
Feb

Mar

Apr

May

Jun

2017

Jul

Aug

Sep

Oct

Nov

Dec

Jan

ENGINEERING

ENGINEERING

Site Survey

18

Draft Survey Results

18

GMBH Review
Survey RPT (Final)
GMBH RFV Approval
System Design
HMBC Review
Bid and Award
Construction Support

17

Marwell Engineering
5

Marwell Engineering

2
3

Lost Creek Point Mgmt


24

Electrical Contractor
8

Lost Creek Point Mgmt

16

20
20

Marwell Engineering
4

Electrical Contractor

Marwell Engineering

29

CONSTRUCTION
Buy Cable Conduit

24

15
1

24

Electrical Contractor

20

A & J Security

20

20

A & J Security

11

A & J Security

13

Load Data
Configure Software

Electrical Contractor
7

Install Hardware
Deliver Console

Marwell Engineering
CONSTRUCTION

Install Cable
Procure Hardware

R-E-S-P

10
26

Lost Creek Point Mgmt.


A & J Security