task_code status_codewbs_id task_name start_date

Activity ID Activity Sta WBS Code Activity Name (*)Start


A1000 No iniciado NEWPROJ INICIO 03/08/2022 08:00
A1010 No iniciado NEWPROJ CARTEL DE IDENTIFICAC 03/08/2022 08:00
A1020 No iniciado NEWPROJ CAMPAMENTO DE OBRA 03/08/2022 08:00
end_date resource_list delete_record_flag
(*)Finish (*)Resources Delete This Row
03/08/2022 08:00
03/08/2022 16:00
09/08/2022 16:00
rsrc_short rsrc_name rsrc_title_name
Resource I Resource Title
MathisL Lane Mathis, CIO
AndersonG Glen Anderson, VP Development
VincentI Ian Vincent
CharlesM Mandy Charles, VP IT Ops
ZhuS Shannon Zhu
LaffertyV Vanessa Lafferty
BennettC Carina Bennett
PaxsonD Dan Paxson
SinghD Deepak Singh
SharpeD Dan Sharpe
ITCon IT Consultant
LiR Roy Li
RiceB Barbara Rice, PMO Director
ChopraA Amit Chopra
AbrahamM Molly Abraham
WrenJ Jo Wren
ATM ENG Automation Systems Engineer
IT Information Technology Group
Product De Product Development Resources
ManufEng Manufacturing Engineering Group
CaseyA Andrea CasSix Sigma Engineer
RileyP Paul Riley Product Engineer
MarshallG Gary Marsha Product Engineer
LeeC Cindy Lee Product Engineering Specialist
ProductOpsProduct Operations Group
HillF Frank Hill
WestL Larry West
BaxterS Sue Baxter
WynnA Alice Wynn
ProductMkt Product Marketing Group
LincolnR Robert LincManufacturing Engineer
ShawH Harry ShawSenior Engineering Lead
JacksonL Lendell Jackson
RickelsS Sam Rickels
IthanP Peg Ithan
Corporate Corporate Resources
Bpmpmo Business Process PMO
JohnsonR Rea Johnson
McneillL Lori McNeil
Operations Process Operations
BillingsJ Judy Billings
Chuf Frank Chu
Contr External Contractors
Bpm001 BPM Consultant 1
Bpm002 BPM Consultant 2
Bpm003 BPM Consultant 3
FrostB Ben Frost
CooperP Peter Cooper
PetersonM Michelle Peterson
PrescottW Wayne Prescott
E&C ResourE&C Resources
SubcontractSubcontractor
Trades Trades
ManagemenManagement
Purchasing Purchasing Department
EngineeringEngineering Department
CretefinisheConcrete Finisher
Admin Administrator
Fabrication Fabrication
Elev Inst Elevator Installer
Elec Electrician
Floor Floor and Carpet Layer
Operator Operator
Plumb Plumber
FCarp Finish Carpenter
RCarp Rough Carpenter
GenLabor Laborer-Construction
FieldEng Field Engineer
IrnWrk Ironworker
FieldEngSnField Eng-Senior
FieldEngAssField Eng-Assistant
Exc Excavator
KimP Paul Kim Design Engineer
YoungJ Jeff Young Analyst
PMs Project Managers
ResnerW Wendy Resn Automation Systems Engineer
DesEng Design Engineer
McGuireO Owen McGuire, Project Manager
Project ContProject ContAccounts Manager
InsEng Instrumentation Engineer
HVAC HVAC
Millwork CaMillwork Subcontractor
Thermal ProThermal Protection Subcontractor
Finishes Finishes & Fit-out Subcontractor
Concrete-S Concrete Foundation Subcontractor
Specialty MSpecialty Metal Fabricator Subcontractor
Pools Pool Installation Subcontractor
Conveying- Conveying Subcontractor
Fire SuppreFire Suppression Subcontractor
LandscapinLandscaping Subcontractor
Specialties FF&E Specialties
Drywall Drywall Subcontractor
Roofing Roofing Subcontractor
Glass Glass & Glazing Subcontractor
Paving Paving & Roadways Subcontractor
Utilities Utilities Subcontractor
OPTGP Operations Test Group
INSP Inspections Senior Inspector
Hydro Hydroblaster
Paint Painter
Material Material Resources
Test resour New Resource Name
Test ResourNew Resource Name-1
pred_proj_i proj_id PREDTASK_ TASK__PROJWBS__wbs_fu
pred_task_id
(*)Proyecto (*)Proyecto (*)Predece (*)Successor EDT Predecesor
task_id PREDTASK__task_name TASK__task_name pred_type
Sucesor (*)Predecessor Nombre de (a*)Successor Nombre de actTipo de relación
lag_hr_cnt PREDTASK_ TASK__statPREDTASK_ TASK__rsrcdelete_record_flag
Demora (*)Predeces(*)Successo(*)Predeces(*)SuccessoDelete This Row
user_data
UserSettings Do Not Edit
DurationQtyType=QT_DayShowAsPercentage=0SmallScaleQtyType=QT_HourDateFormat=dd/MM/yyyyCurrencyFormat=US
ourDateFormat=dd/MM/yyyyCurrencyFormat=US Dollar