task_code status_code wbs_id task_name target_drtn_hr_cnt

Activity ID Activity Status WBS Code Activity Name Original Duration(d)


A1000 Not Started MRU-1 A 3
A1010 Not Started MRU-1 B 3
A1020 Not Started MRU-1 C 5
A1030 Not Started MRU-1 D 5
delete_record_flag
Delete This Row
rsrc_short rsrc_namersrc_title_name
Resource I Resource Title
MathisL Lane Mathis, CIO
AndersonGGlen Anderson, VP Development
VincentI Ian Vincent
CharlesM Mandy Charles, VP IT Ops
ZhuS Shannon Zhu
LaffertyV Vanessa Lafferty
BennettC Carina Bennett
PaxsonD Dan Paxson
SinghD Deepak Singh
SharpeD Dan Sharpe
ITCon IT Consultant
LiR Roy Li
RiceB Barbara Rice, PMO Director
ChopraA Amit Chopra
AbrahamMMolly Abraham
WrenJ Jo Wren
ATM ENG Automation Systems Engineer
IT Information Technology Group
Product DeProduct Development Resources
ManufEng Manufacturing Engineering Group
CaseyA Andrea CasSix Sigma Engineer
RileyP Paul Riley Product Engineer
MarshallG Gary MarshProduct Engineer
LeeC Cindy Lee Product Engineering Specialist
ProductOpProduct Operations Group
HillF Frank Hill
WestL Larry West
BaxterS Sue Baxter
WynnA Alice Wynn
ProductMkProduct Marketing Group
LincolnR Robert Lin Manufacturing Engineer
ShawH Harry Sha Senior Engineering Lead
JacksonL Lendell Jackson
RickelsS Sam Rickels
IthanP Peg Ithan
Corporate Corporate Resources
Bpmpmo Business Process PMO
JohnsonR Rea Johnson
McneillL Lori McNeil
OperationsProcess Operations
BillingsJ Judy Billings
Chuf Frank Chu
Contr External Contractors
Bpm001 BPM Consultant 1
Bpm002 BPM Consultant 2
Bpm003 BPM Consultant 3
FrostB Ben Frost
CooperP Peter Cooper
PetersonMMichelle Peterson
PrescottW Wayne Prescott
E&C ResouE&C Resources
SubcontracSubcontractor
Trades Trades
ManagemeManagement
PurchasingPurchasing Department
EngineerinEngineering Department
CretefinishConcrete Finisher
Admin Administrator
FabricationFabrication
Elev Inst Elevator Installer
Elec Electrician
Floor Floor and Carpet Layer
Operator Operator
Plumb Plumber
FCarp Finish Carpenter
RCarp Rough Carpenter
GenLabor Laborer-Construction
FieldEng Field Engineer
IrnWrk Ironworker
FieldEngSnField Eng-Senior
FieldEngAsField Eng-Assistant
Exc Excavator
KimP Paul Kim Design Engineer
YoungJ Jeff Young Analyst
PMs Project Managers
ResnerW Wendy ResAutomation Systems Engineer
DesEng Design Engineer
McGuireO Owen McGuire, Project Manager
Project ConProject ConAccounts Manager
InsEng Instrumentation Engineer
HVAC HVAC
Millwork CMillwork Subcontractor
Thermal PrThermal Protection Subcontractor
Finishes Finishes & Fit-out Subcontractor
Concrete-SConcrete Foundation Subcontractor
Specialty MSpecialty Metal Fabricator Subcontractor
Pools Pool Installation Subcontractor
Conveying-Conveying Subcontractor
Fire Suppr Fire Suppression Subcontractor
LandscapinLandscaping Subcontractor
SpecialtiesFF&E Specialties
Drywall Drywall Subcontractor
Roofing Roofing Subcontractor
Glass Glass & Glazing Subcontractor
Paving Paving & Roadways Subcontractor
Utilities Utilities Subcontractor
OPTGP Operations Test Group
INSP Inspection Senior Inspector
Hydro Hydroblaster
Paint Painter
Material Material Resources
Test resou New Resource Name
Test ResouNew Resource Name-1
L&T L&T
Man Manpower
MCH Machine
Mat Material
SP Sandeep
R Welder
R-1 Hydra
R-2 Brick
R-3 Cement
MAN-1 Design Engineer
FE Fabrication Engineer
SU Superviser
M Mason
MO Machine Operator
MAT-1 MATERIAL
MACH MACHINE
WR Welding Rods
ST Steel
CM Cement
SD Sand
GR Gravel
JCB JCB Machine
TR Tractor
R-4 (New Resource)
AB IND AB IND
R-5 Manpower
R-6 Machine
R-7 Material
R-8 Welder
R-9 Jignesh
R-10 Fitters
R-11 Hydra
R-12 Brick
R-13 Sand
R-14 Express Ind
R-15 Manpower
R-16 Machine
R-17 Material
R-18 Welder
R-19 Dinesh
R-20 Team Welder
R-21 Hydra
R-22 Brick
CI Combuster Installtion
MP Men power
MC Machine
MT Material
DE-1 Design Engineer
FE-1 Fabrication Engineer
SU-1 Supervisor
M-1 Mason
MO-1 Machine Operator
JCB-1 JCB Machine
TR-1 Tractor
WR-1 Welding Rods
ST-1 Steel
CM-1 Cement
SD-1 Sand
GR-1 Gravel
R-23 Excavation
TP Tata Project
MAN-2 Manpower
R-24 Engineering
R-25 Raja
R-26 Draftsman
R-27 Overall Draftsman
Mch-1 Machine
R-28 Hydra
R-29 Material
R-30 Brick
R-31 Cement
R-32 CCPL
R-33 Manpower
R-34 Machine
R-35 Materail
R-36 Fabrication
R-37 Welder
DE Arvind
R-39 Overall Welder
R-40 Hydra
R-41 Crane
R-42 Cement
R-43 CS 12mm Plate
R-38 L&T
R-44 Manpower
R-45 Machine
R-46 Material
R-47 Welder
R-48 Krunal
R-49 Overall welder
R-50 Hydra
R-51 Plate -60mm CS
R-52 Brick
task_id TASK__sta rsrc_id role_id acct_id rsrc_type
Activity ID (*)Activity Resource I Role ID Cost Account ID (*)Resource Type
A1000 Not Starte R-48 Labor
A1010 Not Starte R-48 Labor
A1020 Not Starte R-48 Labor
A1030 Not Starte R-48 Labor
start_date end_date delete_record_flag
(*)Start (*)Finish Delete This Row
19-05-2023 09:00 22-05-2023 18:00
19-05-2023 09:00 22-05-2023 18:00
30-05-2023 09:00 03-06-2023 18:00
05-06-2023 09:00 09-06-2023 18:00
task_id cost_nameTASK__sta target_cost act_cost remain_cost
Activity ID Expense It (*)Activity Budgeted Cost Actual Cost Remaining Cost
total_cost delete_record_flag
At Completion Cost Delete This Row
pred_task_task_id pred_type PREDTASK__status_codeTASK__status_code pred_proj_id
PredecessoSuccessor Relationsh (*)Predecessor Activity S(*)Successor Activity Sta (*)Predecessor Project
A1000 A1020 FS Not Started Not Started MRU-1
A1020 A1030 FS Not Started Not Started MRU-1
proj_id predtask__projwbs__wbstask__projwbs__wbs_fulpredtask__task_name task__tas
(*)Successor Project (*)Predecessor WBS (*)Successor WBS (*)Predecessor Activity (*)Success
MRU-1 MRU-1 Resource level MRU-1 Resource level A C
MRU-1 MRU-1 Resource level MRU-1 Resource level C D
lag_hr_cntpredtask__task__rsrc_delete_record_flag
Lag(d) (*)Predece(*)Success Delete This Row
0 R-48 R-48
0 R-48 R-48
user_data