task_code status_codewbs_id bcws sv

Activity ID Activity Sta WBS Code (*)Planned Value Cost($) (*)Schedule Variance($)
A1000 Not Started CWRM.Preco0 0
A1010 Not Started CWRM.Preco0 0
A1020 In ProgressCWRM.Preco 0 0
A1030 In ProgressCWRM.Preco 0 0
A1040 In ProgressCWRM.Preco 0 0
A1050 Not Started CWRM.Const0 0
A1060 Not Started CWRM.Const0 0
A1070 Not Started CWRM.Const0 0
A1080 In ProgressCWRM.Const 0 0
A1090 Not Started CWRM.Post0 0
A1100 Not Started CWRM.Post0 0
A1110 Not Started CWRM.Post0 0
bcwp task_name start_date end_date
(*)Earned Value Cost($) Activity Name (*)Start (*)Finish
0 Notice to proceed 24/03/2024 07:00
0 Kick off meeting 24/03/2024 07:00 24/03/2024 17:00
0 Submittals 16/03/2024 08:00 25/03/2024 07:00
0 NOC registers 16/03/2024 08:00 25/03/2024 15:00
0 Shop drawing for approval 14/03/2024 08:00 04/04/2024 12:00
0 site preparation 04/04/2024 12:00 16/04/2024 12:00
0 utility relocation 16/04/2024 12:00 04/05/2024 12:00
0 concrete pads for car wash i 04/05/2024 12:00 21/05/2024 12:00
0 car wash installation 21/05/2024 12:00 27/05/2024 12:00
0 cleaning 27/05/2024 12:00 29/05/2024 12:00
0 snag works 27/05/2024 12:00 28/05/2024 12:00
0 handover 29/05/2024 12:00 30/05/2024 12:00
resource_list delete_record_flag
(*)Resources Delete This Row

Project Controls, Project Managers


Management, Engineering Department
Management, Engineering Department
Management, Engineering Department
Process Operations, Subcontractor
Process Operations, Subcontractor
Process Operations, Subcontractor
Process Operations, Subcontractor
pred_task_itask_id pred_type PREDTASK__status_code TASK__status_code
PredecessoSuccessor Relationshi (*)Predecessor Activity Stat(*)Successor Activity Status
A1000 A1010 SS Not Started Not Started
A1010 A1020 FS Not Started In Progress
A1020 A1030 SS In Progress In Progress
A1010 A1040 SS Not Started In Progress
A1040 A1050 FS In Progress Not Started
A1020 A1050 FS In Progress Not Started
A1050 A1060 FS Not Started Not Started
A1060 A1070 FS Not Started Not Started
A1070 A1080 FS Not Started In Progress
A1080 A1090 FS In Progress Not Started
A1080 A1100 FS In Progress Not Started
A1090 A1110 FS Not Started Not Started
A1100 A1110 FS Not Started Not Started
pred_proj_id proj_id predtask__projwbs__wbs_ftask__projwbs__wbs_full_
(*)Predecessor Project (*)Successor Project (*)Predecessor WBS (*)Successor WBS
CWRM CWRM CWRM.Preconstruction.ProCWRM.Preconstruction.Pro
CWRM CWRM CWRM.Preconstruction.ProCWRM.Preconstruction.Con
CWRM CWRM CWRM.Preconstruction.ConCWRM.Preconstruction.Con
CWRM CWRM CWRM.Preconstruction.ProCWRM.Preconstruction.Des
CWRM CWRM CWRM.Preconstruction.DesCWRM.Construction (New
CWRM CWRM CWRM.Preconstruction.ConCWRM.Construction (New
CWRM CWRM CWRM.Construction (New CWRM.Construction (New
CWRM CWRM CWRM.Construction (New CWRM.Construction (New
CWRM CWRM CWRM.Construction (New CWRM.Construction (New
CWRM CWRM CWRM.Construction (New CWRM.Post construction (
CWRM CWRM CWRM.Construction (New CWRM.Post construction (
CWRM CWRM CWRM.Post construction ( CWRM.Post construction (
CWRM CWRM CWRM.Post construction ( CWRM.Post construction (
predtask__task_name task__task lag_hr_cnt predtask__rtask__rsrc_delete_record_flag
(*)Predecessor Activity Na (*)SuccessoLag(h) (*)Predeces(*)SuccessoDelete This Row
Notice to proceed Kick off mee0 PMs
Kick off meeting Submittals 0 PMs Management
Submittals NOC registe0 ManagemenManagement
Kick off meeting Shop drawin0 PMs Management
Shop drawing for approval site prepara0 ManagemenOperations
Submittals site prepara0 ManagemenOperations
site preparation utility reloc 0 Operations Operations
utility relocation concrete pad 0 Operations Operations
concrete pads for car wash car
i wash ins0 Operations Operations
car wash installation cleaning 0 Operations
car wash installation snag works 0 Operations
cleaning handover 0
snag works handover 0
task_id cost_name TASK__stattarget_cost act_cost
Activity ID Expense It (*)Activity SBudgeted Cost Actual Cost
remain_cost total_cost delete_record_flag
Remaining Cost At Completion Cost Delete This Row
rsrc_short rsrc_name rsrc_type unit_id role_id
Resource I Resource (*)ResourceUnit of Measure (*)Role ID
MathisL Lane MathisLabor
AndersonG Glen Ander Labor
VincentI Ian Vincent Labor DEV
CharlesM Mandy CharlLabor EA
ZhuS Shannon ZhLabor QA
LaffertyV Vanessa LafLabor EA
BennettC Carina BennLabor DEV
PaxsonD Dan PaxsonLabor EA
SinghD Deepak SinLabor QA
SharpeD Dan SharpeLabor DEV
ITCon IT ConsultaLabor BA
LiR Roy Li Labor PMO
RiceB Barbara RicLabor PMO
ChopraA Amit Chopr Labor DEV
AbrahamM Molly Abra Labor PMO
WrenJ Jo Wren Labor PMO
ATM ENG Automation Labor Engr
IT Information Labor
Product De Product De Labor
ManufEng ManufacturiLabor
CaseyA Andrea CasLabor Eng
RileyP Paul Riley Labor ProdAn
MarshallG Gary Marsha Labor ProdAn
LeeC Cindy Lee Labor ProdDes
ProductOpsProduct OpeLabor
HillF Frank Hill Labor ProdMgr
WestL Larry West Labor ProdMgr
BaxterS Sue Baxter Labor Tester
WynnA Alice Wynn Labor Tester
ProductMkt Product MarLabor
LincolnR Robert LincLabor Eng
ShawH Harry ShawLabor LeadEng
JacksonL Lendell Jac Labor MarkMgr
RickelsS Sam Rickel Labor MarkMgr
IthanP Peg Ithan Labor Sales
Corporate Corporate Labor
Bpmpmo Business P Labor
JohnsonR Rea JohnsoLabor LEAD
McneillL Lori McNeil Labor LEAD
Operations Process Ope Labor
BillingsJ Judy Billing Labor ARCH
Chuf Frank Chu Labor ARCH
Contr External CoLabor CNSL
Bpm001 BPM ConsulLabor CNSL
Bpm002 BPM ConsulLabor CNSL
Bpm003 BPM ConsulLabor CNSL
FrostB Ben Frost Labor PBA
CooperP Peter CoopeLabor CMC
PetersonM Michelle PeLabor BA1
PrescottW Wayne PresLabor ARCH
E&C ResourE&C ResourLabor
SubcontractSubcontractLabor
Trades Trades Labor
ManagemenManagemenLabor
Purchasing Purchasing Labor
EngineeringEngineeringLabor
CretefinisheConcrete FiLabor Trades
Admin Administrat Labor Manage
Fabrication Fabrication Labor
Elev Inst Elevator InstLabor Trades
Elec Electrician Labor Trades
Floor Floor and CLabor Trades
Operator Operator Labor Trades
Plumb Plumber Labor Trades
FCarp Finish CarpLabor Trades
RCarp Rough CarpLabor Trades
GenLabor Laborer-ConLabor Trades
FieldEng Field Engin Labor Engr
IrnWrk Ironworker Labor Trades
FieldEngSnField Eng-SLabor Engr
FieldEngAssField Eng-ALabor Engr
Exc Excavator Labor Trades
KimP Paul Kim Labor Manage
YoungJ Jeff Young Labor Manage
PMs Project ManLabor Manage
ResnerW Wendy Resn Labor Manage
DesEng Design EngiLabor Engr
McGuireO Owen McGui Labor Manage
Project ContProject ContLabor Manage
InsEng InstrumentaLabor Engr
HVAC HVAC Labor Trades
Millwork CaMillwork SuLabor
Thermal ProThermal ProLabor
Finishes Finishes & FLabor
Concrete-S Concrete FoLabor
Specialty MSpecialty Me Labor
Pools Pool Install Labor
Conveying- Conveying SLabor
Fire SuppreFire SuppreLabor
LandscapinLandscaping Labor
Specialties FF&E Specia Labor
Drywall Drywall SubLabor
Roofing Roofing SubLabor
Glass Glass & GlaLabor
Paving Paving & R Labor
Utilities Utilities Su Labor
OPTGP Operations Labor
INSP Inspections Labor
Hydro HydroblasteLabor
Paint Painter Labor Trades
Material Material ReMaterial Cubic Yards
Test resour New ResouLabor
Test ResourNew ResourLabor
RES L&T ResourLabor
R1028-E24 R1028-500 Nonlabor
R1028-E25 R1028-Milli Nonlabor
R1028-E26 R1028-Bitum Nonlabor
R1028-E27 R1028-Bitum Nonlabor
R1028-E01 R1028-Grade Labor
R1028-E07 R1028-TrucNonlabor
R1028-E28 R1028-PilinNonlabor
R1028-E29 R1028-RoadNonlabor
R1028-E30 R1028-50 MNonlabor
R1028-E11 R1028-Pug Nonlabor
M
R1028-E12 R1028-HMPNonlabor
R1028-E13 R1028-PTRNonlabor
R1028-E14 R1028-WateNonlabor
R1028-E15 R1028-WalkNonlabor
R1028-E16 R1028-Plat Nonlabor
R1028-E17 R1028-SkidNonlabor
R1028-E18 R1028-SkidNonlabor
R1028-E19 R1028-Comp Nonlabor
R1028-E20 R1028-25 MNonlabor
R1028-E02 R1028-ExcaNonlabor
R1028-E03 R1028-BackNonlabor
R1028-E04 R1028-Dozer Nonlabor
R1028-E05 R1028-GradNonlabor
R1028-E06 R1028-TrucNonlabor
R1028-E22 R1028-BOBNonlabor
R1028-E08 R1028-PaveNonlabor
R1028-E09 R1028-VibroNonlabor
R1028-E10 R1028-Roll Nonlabor
R1028-E21 R1028-HIA Nonlabor
R1028-E23 R1028-125 Nonlabor
WD BF LJ Backfilling Material Linear meter
WD BF CE Backfilling Material Linear meter
RD-SB RD-AggregaMaterial Square meter
R1028-L10 R1028-Surve Labor
R1028-L11 R1028-RiggLabor
R1028-L12 R1028-PaintLabor
RD-WMM RD-AggregaMaterial Square meter
PHW Physical WeNonlabor
RD-WC RD-AsphaltiMaterial Square meter
RD-KB RD-Kerb LaMaterial Linear meter
RD-PV RD-Block PMaterial Square meter
R1028-L01 R1028-LaboLabor
R1028-L02 R1028-CarpLabor
R1028-L03 R1028-PipefLabor
R1028-L04 R1028-MasLabor
R1028-L05 R1028-SteelLabor
R1028-L13 R1028-ElectLabor
R1028-L07 R1028-Rac Labor
R1028-L08 R1028-CharLabor
R1028-L09 R1028-ChaLabor
DM-GC DEM-Genera Material Hectres
RD-BC RD-AsphaltiMaterial Square meter
DM-RI DEM-Removal Material Square meter
DM-RS DEM-Remova Material Numbers
DM-CI DEM-Remova Material Cubic meter
DM-LS DEM-Remova Material Square meter
DM-RK DEM-Remova Material Linear meter
DM-FN DEM-Remova Material Linear meter
EW-SE ER-Soil ExcMaterial Cubic meter
EW-RE ER-Rock ExMaterial Cubic meter
EW-SD ER-Soil DisMaterial Cubic meter
EW-RD ER-Rock DiMaterial Cubic meter
EW-DH ER-Double Material Cubic meter
EW-FE ER-FinishinMaterial Square meter
EW-EE ER-Embankm Material Cubic meter
EW-EI ER-Embankm Material Cubic meter
EW-PF ER-Preparati Material Square meter
SMW Structural MMaterial Numbers
GI Ground InveMaterial Cumulative
RD-CCB RD-Concrete Material Linear meter
DM-RT DEM-Remova Material Numbers
R1028-L06 R1028-Scr Labor
RD-PC RD-Prime CMaterial Square meter
RD-TC RD-Tack CoMaterial Square meter
RD-PT RD-PaintingMaterial Square meter
RD-RM RD-Road Ma Material Linear meter
RD-GR RD-Guard RMaterial Linear meter
RD-KP RD-Kerb PaiMaterial Square meter
ED-BF ED-Backfill Material Linear meter
ED-BED ED-Bed LayMaterial Linear meter
ED-EX ED-ExcavatMaterial Linear meter
ED-PS ED-ProtectiMaterial Numbers
ED-SL ED-SlewingMaterial Linear meter
ED-DT ED-uPVC Du Material Linear meter
ETS-BF Etisalat-BackMaterial Linear meter
ETS-DT Etisalat-DucMaterial Linear meter
ETS-EXp Etisalat-ExcMaterial Linear meter
ETS-MS Etisalat-Ma Material Numbers
ETS-PS Etisalat-ProMaterial Linear meter
ETS-EXn Etisalat-ExcMaterial Linear meter
GAS-PS Dusup GasliMaterial Numbers
RTA-DT RTA Spare Material Linear meter
TS-ES Traffic Sign Material Numbers
TS-CB Traffic Sig Material Linear meter
TS-EB Traffic Sig Material Linear meter
TS-CL Traffic Sign Material Linear meter
TS-CN Traffic Sign Material Numbers
TS-FD Traffic Sign Material Numbers
TS-SP Traffic Sign Material Numbers
TS-SH Traffic Sign Material Numbers
RL-BF Road LightinMaterial Linear meter
RL-CL Road Light Material Numbers
RL-CN Road Lighti Material Numbers
RL-ES Road Lighti Material Numbers
RL-CA Road Lighti Material Linear meter
RL-EX Road Lighti Material Linear meter
RL-FP Road LightinMaterial Numbers
RL-FNp Road Lighti Material Numbers
RL-FNs Road Lighti Material Numbers
RL-LM Road Lighti Material Numbers
RL-MDB Road Light Material Numbers
RD-WM RD-WetmixMaterial Square meter
RD-MO RD-Milling Material Square meter
RL-CLr Road Lighti Material Numbers
RL-UP Road Lighti Material Cumulative
RL-DT Road Light Material Linear meter
CC12-SC CC1&2-SiteMaterial Square meter
CC12-EX CC1&2-Exca Material Cubic meter
CC12-SP CC1&2-SurfMaterial Square meter
CC12-CT CC1&2-Concr Material Cubic meter
CC12-ST CC1&2-SteeMaterial Tonnes
CC12-SH CC1&2-Shutt Material Square meter
CC12-WP CC1&2-Wate Material Square meter
CC12-SG CC1&2-StagMaterial Cubic meter
CC12-RH CC1&2-Reha Material Cubic meter
CC12-CS CC1&2-Concr Material Square meter
CC12-DS CC1&2-DispMaterial Cubic meter
CC12-RD CC1&2-RoaMaterial Square meter
CC3-SC CC3-Site ClMaterial Square meter
CC3-EX CC3-ExcavaMaterial Cubic meter
CC3-SP CC3-Surface Material Square meter
CC3-CT CC3-Concret Material Cubic meter
CC3-ST CC3-Steel Material Tonnes
CC3-SH CC3-Shutteri Material Square meter
CC3-WP CC3-WaterpMaterial Square meter
CC3-SG CC3-StaginMaterial Cubic meter
CC3-RH CC3-Rehand Material Cubic meter
CC3-CS CC3-Concret Material Square meter
CC3-DS CC3-DisposMaterial Cubic meter
CC3-RD CC3-RoadwMaterial Square meter
UP-ASB Underpass-Material Cubic meter
UP-BEJ Underpass-B Material Linear meter
UP-CT Underpass-Material Cubic meter
UP-SH Underpass-S Material Square meter
UP-KRB Underpass-Material Linear meter
UP-PNT Underpass-P Material Square meter
UP-EX Underpass-Material Cubic meter
UP-DR Underpass-P Material Linear meter
UP-VED Underpass-V Material Linear meter
UP-PES Underpass-P Material Square meter
UP-ST Underpass-S Material Tonnes
UP-RD Underpass-Material Square meter
RL-PB Road Lighti Material Numbers
RL-RP Road Light Material Numbers
UP-EPJ Underpass-E Material Linear meter
UP-WP Underpass-Material Square meter
UP-RHD Underpass-R Material Cubic meter
BR-AS Bridge-ApprMaterial Cubic meter
BR-APW Bridge-AsphMaterial Square meter
BR-CT Bridge-ConcMaterial Cubic meter
BR-ST Bridge-SteeMaterial Tonnes
BR-BP Bridge-PainMaterial Square meter
BR-DSH Bridge-DeshMaterial Square meter
BR-DS Bridge-DispMaterial Cubic meter
BR-TP Bridge-TestMaterial Cumulative
BR-MSE Bridge-MSEMaterial Square meter
BR-EXP Bridge-ExcaMaterial Cubic meter
BR-MSEF Bridge-MSEMaterial Cubic meter
BR-SH Bridge-ShutMaterial Square meter
BR-FMSE Bridge-FounMaterial Linear meter
BR-EJ Bridge-ExpaMaterial Linear meter
BR-MSEB Bridge-MSEMaterial Linear meter
BR-UST Bridge-UltraMaterial Cumulative
BR-PHC Bridge-Pile Material Numbers
BR-PHP Bridge-Pile Material Numbers
BR-PLT Bridge-Pile Material Cumulative
BR-PILE Bridge-PilinMaterial Numbers
BR-PT Bridge-PostMaterial Cumulative
BR-PTS Bridge-Pile Material Cumulative
BR-RSG Bridge-Remo Material Cubic meter
BR-PTA Bridge-Pile Material Cumulative
BR-SG Bridge-StagMaterial Cubic meter
BR-STEX Bridge-Stru Material Cubic meter
BR-WP Bridge-WateMaterial Square meter
BR-NPTA Bridge-Non-Material Cumulative
BR-NPTS Bridge-Non-Material Cumulative
BR-CCB Bridge-ConcMaterial Cubic meter
BR-MSECBBridge-MSEMaterial Linear meter
WD-CEP Water-Conne Material Numbers
IRR-DEM Irrigation-D Material Linear meter
IRR-VALVEIrrigation-R Material Numbers
IRR-RP Irrigation-R Material Linear meter
IRR-EX Irrigation-E Material Linear meter
UP-RSH Underpass-Material Square meter
UP-SGT Underpass-S Material Cubic meter
IRR-LP Irrigation-P Material Linear meter
DU-BF Du-Backfill Material Linear meter
DU-MN Du-ManholeMaterial Numbers
DU-CE Du-ConcretMaterial Linear meter
DU-EXe Du-ExcavatiMaterial Linear meter
DU-EXn Du-ExcavatiMaterial Linear meter
DR-BF Drainage-Bac Material Linear meter
DR-BEDgmDrainage-BeMaterial Linear meter
DR-BEDim Drainge-BedMaterial Linear meter
DR-CS Drainage-CoMaterial Linear meter
DR-PS Drainage-PuMaterial Cumulative
DR-MNCH Drainage-MMaterial Numbers
DR-GRP Drainage-GMaterial Linear meter
DR-uPVC Drainage-u Material Linear meter
DR-EX Drainage-ExMaterial Linear meter
GEN PreliminarieMaterial Cumulative
MSE PC Precasting Material Numbers
BR-BL Bridge-Blin Material Cubic meter
BR-WPP Bridge-WateMaterial Square meter
TS-DT Traffic Sign Material Linear meter
TS-MN Traffic Sig Material Numbers
CC12-SFWCC1&2-Form Material Square meter
CC3-SFW CC3-Formwor Material Square meter
UP-STG Underpass-Material Cubic meter
BR-BE Bridge-BearMaterial Numbers
MSE-BS MSE PrecasMaterial Cumulative
SUR Survey Material Cumulative
RW-RS Road SignsMaterial Numbers
CC12-BC CC1&2-BindMaterial Cubic meter
CC12-BsC CC1&2-Base Material Cubic meter
CC12-BFWCC1&2-Form Material Square meter
CC12-SwC CC1&2-SideMaterial Cubic meter
CC3-BsC CC3-Base SMaterial Cubic meter
CC3-SwC CC3-Side Wa Material Cubic meter
CC3-BFW CC3-Formwo Material Square meter
CC3-BC CC3-BlindinMaterial Cubic meter
BR-BFo Bridge-FootiMaterial Numbers
BR-AD Bridge-Acces Material Numbers
BR-PD Bridge-PipeMaterial Numbers
IRR-MN Irrigation-PuMaterial Numbers
IRR-PS Irrigation-P Material Linear meter
WD-EXe CEExcavation Material Linear meter
WD-RP NA Removal of Material Linear meter
WD-BF NA Backfilling Material Linear meter
WD-EXe LJExcavation Material Linear meter
WD-BF-ED Backfilling Material Linear meter
WD-BF Re Backfilling Material Linear meter
WD-EXt EDExtension ofMaterial Linear meter
WD-RP RelRemoval of Material
E Linear meter
WD-SAX N Setting Out Material Linear meter
WD-SAX R Setting Out Material Linear meter
WD-SAX EXSetting out Material Linear meter
WD-SL CE Supply and Material Linear meter
WD-SL LJ Supply and Material Linear meter
ED-CS Concrete SuMaterial Linear meter
IRR-EBED Irrigation-E Material Linear meter
IRR-SBED Irrigation- Material Linear meter
IRR-CBED Irrigation- Material Linear meter
DAY Dayworks Material Cumulative
PS-WD Prov. Sum Material Cumulative
PS-ED Prov.Sums Material Cumulative
PS-ETS Prov. Sums-Material Cumulative
PS-Du Prov. SumsMaterial Cumulative
PS-FC Prov. Sums-Material Cumulative
PS-DH Prov. Sums-Material Cumulative
PS-DR Prov. SumsMaterial Cumulative
PS-AF Prov. SumsMaterial Cumulative
PS-EDc Prov. SumsMaterial Cumulative
PS-ETS-DuProv. Sums-Material Cumulative
PS-CT Prov. Sums-Material Cumulative
TD-J2S1 Traffic Dive Material Cumulative
TD-J2S2 Traffic Dive Material Cumulative
TD-J3 Traffic Dive Material Cumulative
TD-RM Traffic Div Material Cumulative
TD-J1 Traffic Dive Material Cumulative
TD-UP Traffic Div Material Cumulative
DU-DL Du-Duct LayMaterial Linear meter
WD-N-BF Water-BackfMaterial Linear meter
WD-N-CE Water-Conne Material Numbers
WD-N-EXe-Water-Excav Material Linear meter
WD-N-LAY-Water-LayinMaterial Linear meter
WD-N-EXe Water-Excava Material Linear meter
WD-N-DE Water-Duct Material Linear meter
WD-N-MN Water-ManhMaterial Numbers
WD-N-EXe-Water-Excav Material Linear meter
ED-N-BF ED-Backfill Material Linear meter
ED-N-BL ED-Bed LayMaterial Linear meter
ED-N-CL ED-Cable La Material Linear meter
ED-N-CS ED-ConcretMaterial Linear meter
ED-N-11KVED-11KV toMaterial Linear meter
ED-N-EXe- ED-ExcavatiMaterial Linear meter
ED-N-RC ED-RemovalMaterial Linear meter
ED-N-SC ED-SlewingMaterial Linear meter
ED-N-uPVCED-uPVC Du Material Linear meter
IRR-N-LAY Irrigation- Material Linear meter
IRR-N-EM Irrigation- Material Linear meter
IRR-N-EP Irrigation-E Material Linear meter
DR-N-BEDgDrainage-BeMaterial Linear meter
DR-N-BEDiDrainage-BeMaterial Linear meter
DR-N-GRE Drainage-GMaterial Linear meter
DR-N-uPVCDrainage-u Material Linear meter
DR-N-TE Drainage-TrMaterial Linear meter
TS-N-CL Traffic Sig Material Linear meter
RL-N-BF Road Lighti Material Linear meter
RL-N-CF Road Lighti Material Numbers
RL-N-LM Road Lighti Material Numbers
RL-N-RP Road Lighti Material Numbers
RL-N-SP Road Lighti Material Numbers
RL-N-uPVCRoad Lighti Material Linear meter
DR-N-BF Drainage-BaMaterial Linear meter
RL-N-EX Road Lighti Material Linear meter
RL-N-FP Road Lighti Material Numbers
R (New ResouLabor
def_qty_per_hr
Default Units / Time(h/h)
2
2
8
8
8
8
8
8
8
6
8
8
2
8
4
8

8
8
8
8
8
8
8
8
8
8
8
4
8
8
8
8
8
8
8
8
8
4
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8

8
8
8

8
8
8
8
8
8
8
8
8
8
8
8
8

8
8

8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
22
22
8
22
8
8
8
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
8
8
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
13
13
13
13
13
10
13
13
13
13
13
13
13
10
10
10
10
10
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
10
13
13
13
13
13
13
13
13
13
13
13
13
13
13
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
8
rsrc_id task_id TASK__statrole_id acct_id
Resource I Activity ID (*)Activity SRole ID Cost Account ID
Project ContA1010 Not Started E&C.Manage
PMs A1010 Not Started E&C.Manage
ManagemenA1020 In Progress
EngineeringA1020 In Progress
ManagemenA1030 In Progress
EngineeringA1030 In Progress
ManagemenA1040 In Progress
EngineeringA1040 In Progress
Operations A1050 Not Started
SubcontractA1050 Not Started
Operations A1060 Not Started
SubcontractA1060 Not Started
Operations A1070 Not Started
SubcontractA1070 Not Started
Operations A1080 In Progress
SubcontractA1080 In Progress
rsrc_type start_date end_date delete_record_flag
(*)Resource Type (*)Start (*)Finish Delete This Row
Labor 24/03/2024 07:00 24/03/2024 17:00
Labor 24/03/2024 07:00 24/03/2024 17:00
Labor 16/03/2024 08:00 25/03/2024 07:00
Labor 16/03/2024 08:00 25/03/2024 07:00
Labor 16/03/2024 08:00 25/03/2024 15:00
Labor 16/03/2024 08:00 25/03/2024 15:00
Labor 14/03/2024 08:00 04/04/2024 12:00
Labor 14/03/2024 08:00 04/04/2024 12:00
Labor 04/04/2024 12:00 16/04/2024 12:00
Labor 04/04/2024 12:00 16/04/2024 12:00
Labor 16/04/2024 12:00 04/05/2024 12:00
Labor 16/04/2024 12:00 04/05/2024 12:00
Labor 04/05/2024 12:00 21/05/2024 12:00
Labor 04/05/2024 12:00 21/05/2024 12:00
Labor 21/05/2024 12:00 27/05/2024 12:00
Labor 21/05/2024 12:00 27/05/2024 12:00
user_data
UserSettings Do Not Edit
DurationQtyType=QT_HourShowAsPercentage=0SmallScaleQtyType=QT_HourDateFormat=dd/mm/yyyyCurrencyFormat=US
ourDateFormat=dd/mm/yyyyCurrencyFormat=US Dollar