Delay
Trigger Date - Notified to Trigger TO Issue Solved
Event From To Event Description Issue Status Location Consultant Ref Length of Delay Remarks Detailing cause and effect
CL 8.3 Consultant Notice on
No.
DE-3 Junction 4 132KV Circuit Relocation works Client Instruction Closed Underpass Location 10-Apr-17 25/Apr/17 15 6-Sep-17 149 1 2
DE-4 Ch. 10+000 Ch. 11+797 Design NOC for Exploration area at J3 Design NOC Closed Junction 3 16-May-17 24-Jul-17 69 21-Oct-17 158 1 2
DE-5 All Project Areas Additional scope of Works for Water Department Additional works Closed All Project Areas 15-May-17 22/Jul/17 68 16-Jan-18 246 1 2
Tripoli-Underpass Delay due to increase in capacity of Drainage Pump The design of pumping station
DE-6 Design Closed Underpass Location 15-May-17 27/Aug/17 104 15-Jan-18 245 1 2
Location Station was changed
DE-9 Emirates Road Proposed Irrigation Diversion Additional works Closed 12/Oct/17 15/Oct/17 3 26-Dec-17 75 1 2