R1028 - Extension of Tripoli Street

Cut off 28-Feb-18

- Delay Events Chronology

W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12

May/2017

Aug/2017

Nov/2017
Mar/2017

Apr/2017

Dec/2017
Sep/2017

Feb/2018
Jun/2017

Oct/2017

Jan/2018
Jul/2017
Delay
Trigger Date - Notified to Trigger TO Issue Solved
Event From To Event Description Issue Status Location Consultant Ref Length of Delay Remarks Detailing cause and effect
CL 8.3 Consultant Notice on
No.

Additional works instructed in


DE-1 Junction 1 Junction 4 Additional works Additional works Closed From Junction 1 to Junction 4 20-Mar-17 29/Mar/17 9 6-Sep-17 170 1 2
Design NOC

Additional works instructed in


DE-2 Junction 1 Junction 2 Additional works Additional works Closed Greenfield 28-Mar-17 29-Mar-17 1 26-Aug-17 151 1 2
Design NOC

DE-3 Junction 4 132KV Circuit Relocation works Client Instruction Closed Underpass Location 10-Apr-17 25/Apr/17 15 6-Sep-17 149 1 2

DE-4 Ch. 10+000 Ch. 11+797 Design NOC for Exploration area at J3 Design NOC Closed Junction 3 16-May-17 24-Jul-17 69 21-Oct-17 158 1 2

DE-5 All Project Areas Additional scope of Works for Water Department Additional works Closed All Project Areas 15-May-17 22/Jul/17 68 16-Jan-18 246 1 2

Tripoli-Underpass Delay due to increase in capacity of Drainage Pump The design of pumping station
DE-6 Design Closed Underpass Location 15-May-17 27/Aug/17 104 15-Jan-18 245 1 2
Location Station was changed

Additional works instructed in


DE-07 All Project Areas Additional Scope of works - Irrigation Additional works Closed All Project Areas 15-May-17 11-Sep-17 119 26-Dec-17 225 Construction Drawings and 1 2
Construction NOC

The grading layout of junctions was received later.


Grading Plan of Junction 232
DE-8 All Project Areas Delay in issuing grading plan at all locations Drawings Closed All Project Areas 8-Jun-17 20/Aug/17 73 19-Dec-17 194 The delay in receipt of grading layout at Jn 232 will 1 2
(Underpass Location)
cause maximum impact.

DE-9 Emirates Road Proposed Irrigation Diversion Additional works Closed 12/Oct/17 15/Oct/17 3 26-Dec-17 75 1 2

Underpass design was changed


DE-10 Ch.2+900 Ch.3+550 Revised Structural and Road Design for Underpass Additional works Closed Underpass Location 18-Oct-17 29-Oct-17 11 21-Dec-17 64 on 17 Oct 17, 2 Nov 17, 10 Dec 17 1 2
& 21 Dec 17

Engineer instructed to use Geo-


DE-11 All Soakaways Change in Soakaway Additional works Open All Project Areas 16-Nov-17 26-Nov-17 10 28-Feb-18 104 1 2