I. Objective
BIM will be used for design visualization, construction documentation, 3D coordination, and digital
fabrication.
Project phase
SD DD CD FAB Notes
deliverable
V. Model Requirements
Measurement and coordinate systems: Identify project spatial location (real world co-ordinate
and level system).
All performed scope of work shall be in 3D format except as noted in the trade specific description.
a. All models should include separate 3D representations of required clearances and/or access
requirements for equipment access, light clearances, overhead cable tray access, etc. These
clearance/access models should be in a separate layer(s) for each trade clearly labeled as such.
b. Modeled insulation should be in a separate layer from other model elements and labeled as
such.
c. All 3D model files submitted for clash detection must be “clean” meaning that any extraneous
2D references and/or 3D elements stripped are stripped from the models.
HVAC Duct:
HVAC equipment, concrete pads, bases, ductwork, plenums, terminal boxes, fire and smoke
dampers, grilles, access panels, hangers (including seismic).
HVAC Piping:
Piping types with insulation, piping materials, access panels, valves, equipment, concrete
pads, bases, flanges/coupling, hangers (including seismic), racking. Piping less than 1” will
not be coordinated and is shown for intent only.
Plumbing Drawings:
Piping types, insulation, pipe material, access panels, valves, equipment, concrete pads,
bases, flanges/couplings, hangers (including seismic), racking steel, gravity fed piping
(sloped per code), in-wall plumbing systems being prefabricated. Piping less than 1” will not
be coordinated and is shown for intent only.
Electrical Drawings:
All conduits larger than 1”, conduit racks and supports, cable trays, access panels,
equipment, concrete pads, bases, disconnects, breakers, panels, light fixtures, pull boxes,
junction boxes, lighting supports, hangers.
Architectural Drawings:
Ceilings (hard and lay-in), soffits with framing, shaft and wall chase locations, wall thickness
and heights, exterior walls, windows.
Structural Drawings:
Footings, grade beams, elevator pits and walls, shear wall locations, precast concrete
locations, columns, beams, bracing (especially x-bracing), slabs, curbs, ramps.
VI. Software
Any changes in software or version upgrades must be communicated to the BIM team prior to the
change or upgrade.
Examples:
HP-L01-2013-10.dwg
PL-DWV-L01-2013-10.dwg
ST-L01-2013-10.nwc
Multiple updates may be made in a given week using the same file name. The final update for
the week will be considered the final submittal for the week.
Milestone Date
Preliminary Coordination Meeting 04/01/18
First Coordination Meeting 06/05/18
First Floor FAB Model Completion 10/15/18
Second Floor FAB Model Completion 12/31/18