Perhitungan Struktur Tangki
Perhitungan Struktur Tangki
Perhitungan Struktur Tangki
PT. PERTAMINA EP
UBEP LIRIK
20-Mar-11
NP
REV
DESCRIPTION REVISION
DATE
Prepare
REV
DESCRIPTION REVISION
DATE
Prepare
LATION SHEET OF
s TANK CAPACITY
ERT
ARF
Check
Approved
Check
Approved
TITLE
- EP
FORMAT
F007-12-CAL-CS-001
A4
REV. NO
DATE
REMARKS
TITLE
- EP
FORMAT
F007-12-CAL-CS-001
A4
DAFTAR ISI
1.0.
TUJUAN
..........................................................................................................................
2.0.
REFERENSI
3.0.
KRITERIA DESIGN
3.1.
3.2.
3.3.
Material
.................................................................................................................................
Beban Rencana
............ .................................................................................................................................
Kombinasi Pembebanan
.................................................................................................................................
4.0.
DETAIL PERHITUNGAN
.................................................................................................................................
4.1.
4.2.
4.3.
4.4.
4.5.
4.6.
.................................................................................................................................
.................................................................................................................................
.................................................................................................................................
.................................................................................................................................
.................................................................................................................................
.................................................................................................................................
..........................................................................................................................
..............................................................................................................
TITLE
- EP
FORMAT
F007-12-CAL-CS-001
A4
1.0 TUJUAN
Dokumen ini bertujuan untuk memperlihatkan hasil perhitungan untuk Pondasi Tangki Air Kapasitas 5000 Bbl
pada proyek SPU Anggana UBEP Lirik
2.0 REFERENSI
Referensi yang digunakan antara lain:
1. SNI 03 1734
2.
SNI 03 1727
3.
SNI-03-1726-2002
4.
UBC 1997
5.
ACI 318 02
6.
API650
7.
ASCE
8.
ASTM A615
9.
ASTM A36
11. Soil test report yang dilakukan oleh Laboratorium Teknik Sipil Politeknik Negeri Samarinda
:
:
:
:
:
ASTM A-36
K-300
BJTD40/ASTM 615
BJTD24/ASTM 615
ASTM 307
=
=
=
=
=
fy
f`c
fy
fy
ft
beton
2400
280
4000
2400
20
kg/cm2
kg/cm2
kg/cm2
kg/cm2
kips
= 2400
kg/m3
tanah
= 1830
kg/m3
pasir
= 1800
kg/m3
TITLE
- EP
FORMAT
F007-12-CAL-CS-001
A4
DL
OL
WL
: EL
:
:
:
=
=
=
=
t
b
Sx
Sy
Cx1
Cx2
=
=
=
=
=
=
0.30 m
0.75 m
outer diameter pondasi
tinggi pondasi
inner diameter pondasi
lebar pondasi telapak
Sx
Sy
Cx1
Cx2
Cx3
=
=
=
D + 2*0.5b
t+d
D - 2*0.5b
Cx1 - 2*0.6
6.00
8.40
8.39
8.00
m
m
m
m
TITLE
- EP
FORMAT
F007-12-CAL-CS-001
A4
: DL
762.43
kg/m
- Live Load
: LL
122.00
kg/m
: WO
5,530.95
kg/m2
: Wh
6,372.16
kg/m2
: WL
4,571.69
kg
: RW
71.17
kg/m
: MW
13,715.07
kg.m
928.40
:V
: RS
11.75
kg/m
: MS
2,785.19
kg.m
b=
d+t =
d+t =
0.75
8.30
8.30
m
m
m
Sx =
Cx1 =
9.14
7.64
m
m
kg
SxO
D
Cx1
AF = ( Sx2-Cx12 ) / 4
19.78 m
197,
Area of Soil
AS = Cx12 / 4
45.89 m
458,
AT = D 2 / 4
55.34 m
553,
31.21 m
31,210,771.90
17.07%
82.93%
P2 = 100% - P1
TITLE
- EP
FORMAT
F007-12-CAL-CS-001
A4
Beban
Remarks
DL
Equip Erecting
20,105.63
WO
52,251.82
LL
3,217.20
W O + LL
55,469.02
Wind Load
Seismic Load
1,876.72
309.88
OL
WL
EL
Horisontal (kg)
H
Mom
253,823.18
169,222.91
4,571.69
928.40
2.40
kg/cm
: PR = NR / AF + M/W
: PS = NS / AS
dan
Maximum Soil Pressure Below Soil
Cek Soil Pressure
Kombinasi Beban
NR/AF
M/W
1.4 DL
0.142
0.000
1.2 DL + 1.6 OL
0.545
0.000
0.269
0.256
(kg/cm2)
PR
Hasil
PS
Allowable
0.142
0.000
2.40
0.545
0.88
2.40
0.070
0.340
0.277
2.40
0.009
0.265
0.277
2.40
0.253
-0.009
0.244
0.277
2.40
0.093
0.009
0.102
0.000
2.40
-0.002
-0.009
-0.010
0.000
2.40
(PS da
TITLE
- EP
Cek Overturning
Resistant moment : Mr = N.Do / 2 (kg-cm)
Safety Factor
: Fo = Mr/Mo
Kombinasi Beban
DOCUMENT NUMBER
FORMAT
F007-12-CAL-CS-001
A4
Mo (kg.cm)
1.4 DL
11,822,109.60
1.2 DL + 1.6 OL
47,408,419.56
23,042,887.24
Fo = Mr/Mo
Foallow
999.00
1.50
999.00
1.50
2,194,411.14
10.50
1.50
21,911,880.25
278,518.51
78.67
1.50
21,651,582.57
(278,518.51)
77.74
1.50
0.9DL + 1.0 EL
7,730,076.44
278,518.51
27.75
1.50
0.9DL - 1.0 EL
7,469,778.76
(278,518.51)
26.82
1.50
Cek Overturning
Resistant force
: Hr = 0.5 N (kN)
Safety Factor
: Fs = Hr / H
Kombinasi Beban
Hasil
(Fo
Ho (kg.cm)
Fs = Hr/Ho
Fsallow
1.4 DL
14,073.94
999.00
1.50
1.2 DL + 1.6 OL
56,438.59
999.00
1.50
27,432.01
7,314.70
3.75
1.50
26,085.57
928.40
28.10
1.50
25,775.69
928.40
27.76
1.50
0.9DL + 1.0 EL
77,300.76
928.40
83.26
1.50
0.9DL - 1.0 EL
74,697.79
928.40
80.46
1.50
Hasil
(Fo
TITLE
- EP
DOCUMENT NUMBER
FORMAT
F007-12-CAL-CS-001
A4
C. L
PS
F
df
Di
Ka soil df
KaPS
Beban merata terfaktor yang bekerja pada Ring Wall adalah tegangan maximum yang terjadi
pada kombinasi beban 1.2DL + 1.6OL, sebesar
qu
=
0.545
kg/cm
=
5,446.97 kg/m2
Data Tanah :
soil
=
1830
kg/m3
Ka
=
11.2
deg
= tan2 (45-2)
=
0.6747131733
Data Ring Wall:
Lebar Ring Wall: b
=
0.75
Inner Diameter: Di
= Cx1
Tinggi Ring Wall: df
=
8.30
m
=
m
7.64 m
Pembebanan
-
Hoop Stress
Hoop Tension
: F1
= qu*Ka*df
= *soil*Ka*d
42,530.11 kg/m
= F1 + F2
73,033.80 kg/m
= *F*Di
30,503.70 kg/m
F2
2
f
AREQ
Bar size (db)
Sectional area
Required No. of Bars
279,135.20 kg
6,978.38 mm2
15,562.50 mm2
15562.50
mm2
12
113
138
mm2
mm2
Menurut ACI 318 Section 14.3.4, untuk tebal dinding pondasi lebih dari 250mm, harus mempunyai reinforcement dalam 2 (dua)
layer paralel dengan muka (face) dari dinding.
Digunakan tulangan 69 - D12 Bars on each face
Penulangan Vertikal (Vertical Reinforcement)
- As min / ACI-318-05-14.3.2
Asmin
= 0.0015*b
12
113
101
Digunakan
1,125.00 mm2/m
mm2
mm2
mm
REV
SHEET
1 of 10
REV
SHEET
1 of 10
DAFTAR ISI
4
4
4
4
5
5
5
5
6
6
7
7
9
10
REV
SHEET
1 of 10
REV
SHEET
1 of 10
(tinggi tanki)
(outer diameter tanki)
(inner diameter tanki)
(tinggi pondasi di atas
telapak)
(tinggi pondasi telapak)
(lebar pondasi)
=
=
=
=
=
9.14
8.30
7.64
2.00
6.44
m
m
m
m
m
REV
SHEET
1 of 10
197,778.97 cm
458,913.93 cm
553,385.55 cm
31,210,771.90 cm3
REV
SHEET
1 of 10
Moment (kg.cm)
Mo
1,371,506.96
278,518.51
Hasil
(PS dan PR < Allow)
PASS
PASS
PASS
PASS
PASS
PASS
PASS
REV
SHEET
1 of 10
Hasil
(Fo > Foallow)
PASS
PASS
PASS
PASS
PASS
PASS
PASS
Hasil
(Fo > Foallow)
PASS
PASS
PASS
PASS
PASS
PASS
PASS
kg/m
kg/m
kg/m
langan
69 - D12
REV
SHEET
1 of 10
TITLE
UBEP Sangasanga & Tarakan
FORMAT
REV
SHEET
F007-12-CAL-CS-001
A4
10 of 10
Qty
6
6
6
6
6
6
pcs
pcs
pcs
pcs
pcs
pcs
Qty
7
pcs
Qty
9
pcs
Qty
8.77
96.408
92.508
61.68
30.828
36.108
20.376
1
4
1
1
1
12
48
24
24
m
m
m
m
m
m
m
pcs
pcs
pcs
pcs
pcs
pcs
pcs
set
set
Unit Weight
42.49
28.23
21.4
21.4
21.4
21.4
21.4
7.85
7.85
7.85
7.85
7.85
7.85
7.85
7.85
7.85
2.4 Tiang
-
x
x
x
x
x
x
6mm
6mm
6mm
6mm
6mm
8mm
Thk,
Thk,
Thk,
Thk,
Thk,
Thk,
A-36:
A-36:
A-36:
A-36:
A-36:
A-36:
Page 21 of 23
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
TITLE
UBEP Sangasanga & Tarakan
FORMAT
F007-12-CAL-CS-001
A4
2.5 Nozzles
N1 & N17, 3" Sch.40 Pipe:
N1 & N17, 3" Flange:
N3, N4, N9, N15, 4" Sch.40 Pipe:
N3, N4, N9, N15, 4" Flange:
N2, N5, N10, N11, N13 & N14, 6" Sch.40 Pipe:
N2, N5, N10, N11, N13 & N14, 6" Flange:
N7, N8, N12, N16, 8" Sch.40 Pipe:
N7, N8, N12, N16, 8" Flange:
N6, 10" Sch.40 Pipe:
N6, 10" Flange:
N18 - N21, 1" Sch.40 Pipe:
N22, 2" Sch.40 Pipe:
M1, M2, C1, 24" Sch.40 Pipe:
Total Berat Nozzles
Qty
0.4
1
1.6
4
2.4
6
1.6
4
0.4
1
1.6
0.4
1.2
Qty
30
0.995
1
1
11.661
30
5
3
2
2
2
1
35
9
9
9
Total WEIGHT
- Tolerancy
Dead Load (DL)
-
8.39 m
26.37 m
Dead Load, DL
1,303.12 kg/m
LIVE
-
=
=
=
122
=
=
=
=
kg
kg/m
kg
kg
kg/m
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
31,239.88
3,123.99
34,363.87
860
kg/m3
272,620.00 kg
1/4**ID2
m2
55.34 m2
=
=
Unit Weight
3.791
5.42
0.019625
0.179451
4.05
0.5027555556
3.0551
34.44
23.7144
29.52
18.7452
1.641856
5.7994
24.3
20.34
21.18
kg/m2
(Data Sheet)
6,751.30 kg
256.02 kg/m
kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg/m
kg/m
=
=
=
10%
=
=
LOAD (L)
Uniform Roof Load
Roof Load (Live Load)
Roof Load (Live Load)
ea
ea
ea
=
12,354.86
Page 22 of 23
683,700.00 kg
kg/m2
SHEET
A
Total Weight (kg)
Unit Weight
11.27
3.7
16.06
5.9
28.23
8.6
42.49
13.7
60.24
19.5
2.5
5.43
254.48
m
pcs
m
pcs
m
pcs
m
pcs
m
pcs
m
m
m
ea
m
ea
ea
m
ea
ea
ea
ea
ea
ea
ea
REV
4.51
3.70
25.70
23.60
67.75
51.60
67.98
54.80
24.10
19.50
4.00
2.17
305.38
654.78
Total Weight (kg)
113.73
5.39
0.02
0.18
47.23
15.08
15.28
103.32
47.43
59.04
37.49
1.64
202.98
218.70
183.06
190.62
1,241.19
Kg
Kg
Kg
10 of 10
TITLE
PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL
ATTACHMENT 1
=
=
=
Av
Vertical Plane
DOCUMENT NUMBER
FORMAT
REV
SHEET
F007-12-CAL-CS-001
A4
10 of 10
126 km/hr
8.40
m
6.00
m
=
=
(Data Sheet)
OD x H
50.40 m2
Ce Cg qs Iw
Design Wind Pressure, P =
Ce
=
combined height, exposure and gust factor coefficient as given in Table 16-G (UBC 1997)
=
1.23 (Exposure C)
Cg
=
pressure coefficient for the structure or portion of structure under construction as given in Table 16-H (UBC 1997)
=
0.8 (winward wall)
qs
=
wind stagnation pressure at standard height of 10000 mm as forth in Table 16-F (UBC 1997)
=
0.79 kN/m2
(16.4 psf)
Iw
=
importance factor as set forth in Table 16-K (UBC 1997)
=
1.15 (Essential facilities)
P
=
0.89 kN/m2
Wind Load, W L
44.80 kN
=
P x Av
=
=
4,571.69 kg
MW
W L x H/2
=
Reaction due to W L, Rw
Rw
13,715.07
W L/(0.87*D) x H/2
=
=
=
1,876.72 kg
71.167
kg/m
kg.m
=
=
=
W
Vmaks
0.18
1.25
4.5
=
=
DL + W O
34,363.87 kg
4,295.48 kg
Ct(hn)3/4
Ct
hn
T
=
=
=
0.0731
7.2
0.3213
Cv
0.25
Reaction due to V, Rw
Rs
=
=
=
V/(1.07*D) x H/2
309.88 kg
11.75 kg/m
2,785.19
kg.m
Page 23 of 23
(g = 9.8 m/s2)