Perhitungan Struktur Tangki

You might also like

You are on page 1of 23

TITLE

CIVIL STRUCTURE CALCULATION SHEET OF 2000 BBLs


CAPACITY
DOCUMENT NO
FORMAT
F007-12-CAL-CS-001
CLIENT
PT. PERTAMINA EP UBEP LIRIK
PROJECT TITLE

PEMBANGUNAN SATU UNIT TANKI 2000 BBLs, SATU UNIT TANK


BBLs, SATU UNIT TANKI 10000 BBLs DI FIELD PERTAMINA EP
LIRIK

PT. PERTAMINA EP
UBEP LIRIK

CIVIL STRUCTURE CALCULATION SHEET OF


2000 BBLs TANK CAPACITY

PT. KLARAS PUSAKA INTERNASIONAL


PREPARED BY

PT. PERTAMINA EP UBEP LIRIK


CHECKED/REVIEWED BY

Issued For Review

20-Mar-11

NP

REV

DESCRIPTION REVISION

DATE

Prepare

REV

DESCRIPTION REVISION

DATE

Prepare

ULATION SHEET OF 2000 BBLs TANK


CAPACITY
REV
SHEET
A
1 of 10

AMINA EP UBEP LIRIK

TANKI 2000 BBLs, SATU UNIT TANKI 5000


0000 BBLs DI FIELD PERTAMINA EP UBEP
LIRIK

LATION SHEET OF
s TANK CAPACITY

AMINA EP UBEP LIRIK


APPROVED BY

ERT

ARF

Check

Approved

Check

Approved

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

DOCUMENT CHANGES HISTORY


PAGES

REV. NO

DATE

REMARKS

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

DAFTAR ISI
1.0.

TUJUAN

..........................................................................................................................

2.0.

REFERENSI

3.0.

KRITERIA DESIGN

3.1.
3.2.
3.3.

Material
.................................................................................................................................
Beban Rencana
............ .................................................................................................................................
Kombinasi Pembebanan
.................................................................................................................................

4.0.

DETAIL PERHITUNGAN

.................................................................................................................................

4.1.
4.2.
4.3.
4.4.
4.5.
4.6.

Denah dan Potongan


Data Pembebanan
Foundation Outline
Ringkasan Pembebanan
Stability of Foundation
Perhitungan Ring Wall

.................................................................................................................................
.................................................................................................................................
.................................................................................................................................
.................................................................................................................................
.................................................................................................................................
.................................................................................................................................

..........................................................................................................................
..............................................................................................................

ATTACHMENT 1: TANK LOADING CALCULATION

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

1.0 TUJUAN
Dokumen ini bertujuan untuk memperlihatkan hasil perhitungan untuk Pondasi Tangki Air Kapasitas 5000 Bbl
pada proyek SPU Anggana UBEP Lirik
2.0 REFERENSI
Referensi yang digunakan antara lain:
1. SNI 03 1734

Petunjuk Perencanaan Beton Bertulang dan struktur Dinding


Bertulang untuk Rumah dan Gedung, 2002

2.

SNI 03 1727

Pedoman Perencanaan Pembebanan untuk Rumah dan


Gedung, 2002

3.

SNI-03-1726-2002

Tata Cara Perencanaan Ketahanan Gempa untuk Bangunan Gedung

4.

UBC 1997

Uniform Buildiing Code 1997

5.

ACI 318 02

American Concrete Institute : Building Code Requiriments for Buildings

6.

API650

American Petroleum Institute : Welded Steel Tanks for Oil Storage

7.

ASCE

American Society of Civil Engineering : Minimum Design Loads for


Building and Other Structures

8.

ASTM A615

American Society for Testing Materials Specification for Deformed


and Plain Billet Steel Bars for Concrete Reinforcement

9.

ASTM A36

Standard Specification for Structure Steel. and Heat Treated Joints

American Institute of Steel Construction

10. AISC 9 th Edition

11. Soil test report yang dilakukan oleh Laboratorium Teknik Sipil Politeknik Negeri Samarinda

3.0 KRITERIA DESAIN


3.1 Material
Spesifikasi Material :
Baja
Beton
Tulangan Utama
Tulangan Sengkang
Anchor Bolt

:
:
:
:
:

Berat Jenis Beton

ASTM A-36
K-300
BJTD40/ASTM 615
BJTD24/ASTM 615
ASTM 307

=
=
=
=
=

fy
f`c
fy
fy
ft
beton

2400
280
4000
2400
20

kg/cm2
kg/cm2
kg/cm2
kg/cm2
kips

= 2400

kg/m3

Berat Jenis Tanah

tanah

= 1830

kg/m3

Berat Jenis Pasir (Sirtu)

pasir

= 1800

kg/m3

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

3.2 Beban Rencana


Beban Rencana yang bekerja adalah:
- Beban Mati
- Beban Operation
- Beban Angin
- Beban Gempa

DL
OL
WL
: EL
:
:
:

3.3 Kombinasi Pembebanan


Kombinasi untuk pembebanan mengacu pada LRFD
- 1.4 DL
- 1.2 DL + 1.6 OL
- 1.2 DL + 1.6 WL + 0.5 OL
- 1.2 DL 1.0 EL + 0.5 OL
- 0.9DL (1.6 WL atau 1.0 EL)
4.0 DETAIL PERHITUNGAN
4.1 DENAH dan POTONGAN
DATA :
H1
OD
D
d

=
=
=
=

t
b
Sx
Sy
Cx1
Cx2

=
=
=
=
=
=

0.30 m
0.75 m
outer diameter pondasi
tinggi pondasi
inner diameter pondasi
lebar pondasi telapak

Sx
Sy
Cx1
Cx2
Cx3

=
=
=

D + 2*0.5b
t+d
D - 2*0.5b

Cx1 - 2*0.6

6.00
8.40
8.39
8.00

m
m
m
m

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

4.2 Data Pembebanan


- Dead Load, Shell, Roof, & Ext.Structure Loads

: DL

762.43

kg/m

- Live Load

: LL

122.00

kg/m

- Uniform Load, Operating Condition

: WO

5,530.95

kg/m2

- Uniform Load, Hydrotest Load

: Wh

6,372.16

kg/m2

- Base Shear due to Wind

: WL

4,571.69

kg

- Reaction due to Wind

: RW

71.17

kg/m

- Moment Due to Wind

: MW

13,715.07

kg.m

- Base Shear due to Seismic Load

928.40

- Reaction due to Seismic Load

:V
: RS

11.75

kg/m

- Moment Due to Seismic Load

: MS

2,785.19

kg.m

4.3 Foundation Outline


- Lebar Ring Wall
- Tinggi Ring Wall
- Soil Cover
-

Footing Outer Dia


Footing Inner Dia

b=
d+t =
d+t =

0.75
8.30
8.30

m
m
m

Sx =
Cx1 =

9.14
7.64

m
m

kg

SxO
D
Cx1

Areas & Moment of Inertia


Area of Ring Foundation

AF = ( Sx2-Cx12 ) / 4

19.78 m

197,

Area of Soil

AS = Cx12 / 4

45.89 m

458,

Area Enclosed by Tank

AT = D 2 / 4

55.34 m

553,

= Section modulus of ring foundation


= 1/32 * * (Sx3 - Cx13)

31.21 m

31,210,771.90

Loading at Bottom of Foundation


% Content Load transferred to Ring ( P1 )

17.07%

P1 = (AT - AS) / AT (%)

% Content Load transferred to Soil ( P2 )

82.93%

P2 = 100% - P1

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY


DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

4.4 Ringkasan Pembebanan


Beban yang akan menjadi input dalam analysis
Vertical (kg)

Beban

Remarks

DL

Equip Erecting

20,105.63

WO

52,251.82

LL

3,217.20

W O + LL

55,469.02

Wind Load
Seismic Load

1,876.72
309.88

OL
WL
EL

Below Ring (NR)

Horisontal (kg)
H

Below Soil (NS)

Mom

253,823.18

169,222.91

4,571.69
928.40

4.5 Stability of Foundation


Asumsi data tanah seperti dibawah ini
Titik CPT
Kedalaman
qc
qc @1.5m
Satuan
1.40
3.20
Titik S-01
3.20
1.60
3.20
1.40
8.52
Titik S-02
10.65
kg/cm2
1.60
12.78
1.00
6.39
Titik S-03
5.59
3.00
3.20
Rata-rata qc
=
6.48 kg/cm
SF
=
3
Menurut Schmertmann (1978), untuk tanah lempung dengan pondasi persegi, daya dukung tanah yang diijinkan adalah sbb:
all
=
(5+0.34*qc)/SF
= (5+0.34*6.48)/3
=

2.40

kg/cm

Maximum Soil Pressure Below Ring

: PR = NR / AF + M/W

< Pallow : Allowable Soil Pressure

: PS = NS / AS

< Pallow : Allowable Soil Pressure

dan
Maximum Soil Pressure Below Soil
Cek Soil Pressure
Kombinasi Beban

NR/AF

M/W

1.4 DL

0.142

0.000

1.2 DL + 1.6 OL

0.545

0.000

1.2 DL + 1.6 WL + 0.5 OL

0.269

1.2 DL + 1.0 EL + 0.5 OL

0.256

1.2 DL - 1.0 EL + 0.5 OL


0.9DL + 1.0 EL
0.9DL - 1.0 EL

(kg/cm2)
PR

Hasil
PS

Allowable

0.142

0.000

2.40

0.545

0.88

2.40

0.070

0.340

0.277

2.40

0.009

0.265

0.277

2.40

0.253

-0.009

0.244

0.277

2.40

0.093

0.009

0.102

0.000

2.40

-0.002

-0.009

-0.010

0.000

2.40

(PS da

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY

Cek Overturning
Resistant moment : Mr = N.Do / 2 (kg-cm)
Safety Factor
: Fo = Mr/Mo
Kombinasi Beban

DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

> Foallow : Minimum Safety Factor for Overturning


Mr (kg.cm)

Mo (kg.cm)

1.4 DL

11,822,109.60

1.2 DL + 1.6 OL

47,408,419.56

1.2 DL + 1.6 WL + 0.5 OL

23,042,887.24

Fo = Mr/Mo

Foallow

999.00

1.50

999.00

1.50

2,194,411.14

10.50

1.50

1.2 DL + 1.0 EL + 0.5 OL

21,911,880.25

278,518.51

78.67

1.50

1.2 DL - 1.0 EL + 0.5 OL

21,651,582.57

(278,518.51)

77.74

1.50

0.9DL + 1.0 EL

7,730,076.44

278,518.51

27.75

1.50

0.9DL - 1.0 EL

7,469,778.76

(278,518.51)

26.82

1.50

Cek Overturning
Resistant force
: Hr = 0.5 N (kN)
Safety Factor
: Fs = Hr / H
Kombinasi Beban

Hasil

(Fo

> Fsallow : Minimum Safety Factor for Sliding


Hr (kg.cm)

Ho (kg.cm)

Fs = Hr/Ho

Fsallow

1.4 DL

14,073.94

999.00

1.50

1.2 DL + 1.6 OL

56,438.59

999.00

1.50

1.2 DL + 1.6 WL + 0.5 OL

27,432.01

7,314.70

3.75

1.50

1.2 DL + 1.0 EL + 0.5 OL

26,085.57

928.40

28.10

1.50

1.2 DL - 1.0 EL + 0.5 OL

25,775.69

928.40

27.76

1.50

0.9DL + 1.0 EL

77,300.76

928.40

83.26

1.50

0.9DL - 1.0 EL

74,697.79

928.40

80.46

1.50

Hasil

(Fo

TITLE

- EP

CIVIL STRUCTURE CALCULATION SHEET OF

UBEP Sangasanga & Tarakan

2000 BBLs TANK CAPACITY

4.6 Perhitungan Ring Wall

DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

C. L

PS

F
df

Di

Ka soil df

KaPS

Beban merata terfaktor yang bekerja pada Ring Wall adalah tegangan maximum yang terjadi
pada kombinasi beban 1.2DL + 1.6OL, sebesar
qu
=
0.545
kg/cm
=
5,446.97 kg/m2
Data Tanah :
soil
=
1830
kg/m3

Ka

=
11.2
deg
= tan2 (45-2)
=
0.6747131733
Data Ring Wall:
Lebar Ring Wall: b
=
0.75
Inner Diameter: Di
= Cx1
Tinggi Ring Wall: df
=
8.30

m
=
m

7.64 m

Pembebanan
-

Hoop Stress

Hoop Tension

: F1

= qu*Ka*df

= *soil*Ka*d

42,530.11 kg/m

= F1 + F2

73,033.80 kg/m

= *F*Di

Penulangan Keliling (Circumferencial Reinforcement)


- Luas Tulangan untuk Hoop Tension
At
= T/fy
- As min / ACI-318-05-14.3.3
Asmin
= 0.0025*b*df
Area of Steel Required =

30,503.70 kg/m

F2

2
f

AREQ
Bar size (db)
Sectional area
Required No. of Bars

279,135.20 kg

6,978.38 mm2

15,562.50 mm2

15562.50

mm2

12
113
138

mm2
mm2

Menurut ACI 318 Section 14.3.4, untuk tebal dinding pondasi lebih dari 250mm, harus mempunyai reinforcement dalam 2 (dua)
layer paralel dengan muka (face) dari dinding.
Digunakan tulangan 69 - D12 Bars on each face
Penulangan Vertikal (Vertical Reinforcement)
- As min / ACI-318-05-14.3.2
Asmin
= 0.0015*b

Bar size (db)


Sectional area
Required spacing of bars

12
113
101

Digunakan

D12 @ 200 mm c/c (D22-200)

1,125.00 mm2/m
mm2
mm2
mm

MENT CHANGES HISTORY


REMARKS

REV

SHEET

1 of 10

REV

SHEET

1 of 10

DAFTAR ISI
4
4
4
4
5
5
5
5
6
6
7
7
9

10

REV

SHEET

1 of 10

REV

SHEET

1 of 10

(tinggi tanki)
(outer diameter tanki)
(inner diameter tanki)
(tinggi pondasi di atas
telapak)
(tinggi pondasi telapak)
(lebar pondasi)

=
=
=
=
=

9.14
8.30
7.64
2.00
6.44

m
m
m
m
m

REV

SHEET

1 of 10

197,778.97 cm
458,913.93 cm
553,385.55 cm
31,210,771.90 cm3

P1 = (AT - AS) / AT (%)

REV

SHEET

1 of 10

Moment (kg.cm)
Mo
1,371,506.96
278,518.51

Hasil
(PS dan PR < Allow)
PASS
PASS
PASS
PASS
PASS
PASS
PASS

REV

SHEET

1 of 10

Hasil
(Fo > Foallow)
PASS
PASS
PASS
PASS
PASS
PASS
PASS

Hasil
(Fo > Foallow)
PASS
PASS
PASS
PASS
PASS
PASS
PASS

kg/m
kg/m
kg/m

langan

69 - D12

Bars on each face

D12 @ 200 mm c/c (D22-200)

REV

SHEET

1 of 10

TITLE
UBEP Sangasanga & Tarakan

PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL


ATTACHMENT 1
DOCUMENT NUMBER

FORMAT

REV

SHEET

F007-12-CAL-CS-001

A4

10 of 10

TANK LOADING CALCULATION

REFERENCE MECHANICAL DESIGN


- Mechanical Data Sheet No. : F007-12-CAL-ME-002-Mechanical Calculation Sheet of 5000 BBLs Tank Capacity
- Drawing No. : F007-12-DWG-ME-002

DEAD LOAD (D)

2.1 Plat Dinding


Course 1, Plat 1524 x 6096
Course 2, Plat 1524 x 6096
Course 3, Plat 1524 x 6096
Course 4, Plat 1524 x 6096
Course 5, Plat 1524 x 6096
Course 6, Plat 1380 x 6096
Total Berat Plat Dinding

Qty
6
6
6
6
6
6

pcs
pcs
pcs
pcs
pcs
pcs

Weight (kg/mm m2)


7.85
7.85
7.85
7.85
7.85
7.85

Total Weight (kg)


2,625.44
2,625.44
2,625.44
2,625.44
2,625.44
2,377.37
13,127.20

2.2 Plat Dasar


No. 1-7 Plat 8.975m2 x 12mm Thk, A-36:
Total Berat Plat Dasar

Qty
7

pcs

Weight (kg/mm m2)


7.85

Total Weight (kg)


5,918.12
5,918.12

2.3 Plat Atap


No. 1-9, Plat 1828 x 6096 x 6mm Thk, A-36:
Total Berat Plat Atap

Qty
9

pcs

Weight (kg/mm m2)


7.85

Total Weight (kg)


4,723.72
4,723.72

Qty
8.77
96.408
92.508
61.68
30.828
36.108
20.376
1
4
1
1
1
12
48
24
24

m
m
m
m
m
m
m
pcs
pcs
pcs
pcs
pcs
pcs
pcs
set
set

Unit Weight
42.49
28.23
21.4
21.4
21.4
21.4
21.4
7.85
7.85
7.85
7.85
7.85
7.85
7.85
7.85
7.85

Total Weight (kg)


372.64
2,721.60
1,979.67
1,319.95
659.72
772.71
436.05
45.37
22.61
55.89
81.95
14.19
188.40
94.20
565.20
565.20
9,895.35

2.4 Tiang
-

x
x
x
x
x
x

6mm
6mm
6mm
6mm
6mm
8mm

Thk,
Thk,
Thk,
Thk,
Thk,
Thk,

A-36:
A-36:
A-36:
A-36:
A-36:
A-36:

Mast dan Rangka Atap


Pipe 8", L=8.770m, Sch. 40, 1pcs
Pipe 6", L=8.034m, Sch. 40, 12pcs
Rafter1, L=7.709m, UNP 180x75x7mm, 12pcs
Rafter2, L=5.140m, UNP 180x75x7mm, 12pcs
Rafter3, L=2.569m, UNP 180x75x7mm, 12pcs
Girder1, L=3.009m, UNP 180x75x7mm, 12pcs
Girder2, L=0.849m, UNP 180x75x7mm, 24pcs
Base Plat Center Colum 850 x 850 x 8mm Thk, A-36:
Stiffener Plat Center Colum 0.09m2 x 8mm Thk, A-36:
Base Plate Water Drench 0.890m2 x 8mm Thk, A-36:
Neck Plate Water Drench 4350x300x8mm Thk, A-36:
Stiffener Plat Center Drum 0.226m2x8mm Thk, A-36:
Base Plat Middle Colum 500 x 500 x 8mm Thk, A-36:
Bracket Plat Middle Column 8mm Thk, A-36:
Bracket & Plat Shell Middle Column 8mm Thk, A-36:
Rafter Girder Support Plate & Bracket 8mm, A-36:
Total Berat Tiang Mast dan Rangka Atap

Page 21 of 23

kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/m
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm
kg/mm

TITLE
UBEP Sangasanga & Tarakan

PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL


ATTACHMENT 1
DOCUMENT NUMBER

FORMAT

F007-12-CAL-CS-001

A4

2.5 Nozzles
N1 & N17, 3" Sch.40 Pipe:
N1 & N17, 3" Flange:
N3, N4, N9, N15, 4" Sch.40 Pipe:
N3, N4, N9, N15, 4" Flange:
N2, N5, N10, N11, N13 & N14, 6" Sch.40 Pipe:
N2, N5, N10, N11, N13 & N14, 6" Flange:
N7, N8, N12, N16, 8" Sch.40 Pipe:
N7, N8, N12, N16, 8" Flange:
N6, 10" Sch.40 Pipe:
N6, 10" Flange:
N18 - N21, 1" Sch.40 Pipe:
N22, 2" Sch.40 Pipe:
M1, M2, C1, 24" Sch.40 Pipe:
Total Berat Nozzles

Qty
0.4
1
1.6
4
2.4
6
1.6
4
0.4
1
1.6
0.4
1.2

2.6 Tangga & Handrail


Round Bar 19 x 1700mm Length, ASTM A36:
Bracing 60 x 60 x 6mm, ASTM A36:
Pad Plate, 100 x 150 x 6mm, ASTM A36:
Support, 762 x 300 x 10mm Thk, ASTM A36:
Pipe 1-1/2", Sch. Std, CS
Checquered Plate, 700 x 400 x 4.5mm, ASTM A36:
Round Bar 19 x 1370mm Length, ASTM A36:
CNP. 200 x 80 x 7.5mm, 1400mm Length, ASTM A36
CNP. 200 x 80 x 7.5mm, 964mm Length, ASTM A36
CNP. 200 x 80 x 7.5mm, 1200mm Length, ASTM A36
CNP. 200 x 80 x 7.5mm, 762mm Length, ASTM A36
Checker Plate, 762 x 1200 x 4.5mm, ASTM A36:
L 60 x 60 x 6mm, 1070mm Length, ASTM A36:
Pipe 1-1/2", Sch. Std, 6000mm Length, CS
Pipe 1-1/4", Sch. Std, 6000mm Length, CS
FB 75 x 6mm, 6000mm Length, ASTM A36
Total Berat Tangga & Handrail

Qty
30
0.995
1
1
11.661
30
5
3
2
2
2
1
35
9
9
9

Total WEIGHT
- Tolerancy
Dead Load (DL)
-

Inner Diameter Tank


Keliling Tank

8.39 m
26.37 m

Dead Load, DL

1,303.12 kg/m

LIVE
-

=
=
=

122

Luas Area Tank

Uniform Load, Operating Condition, W O

=
=

=
=

kg
kg/m
kg
kg
kg/m
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

31,239.88
3,123.99
34,363.87

860

kg/m3
272,620.00 kg

1/4**ID2
m2
55.34 m2
=
=

Berat Fluida / Luas di bawah Tank


kg/m2
4,926.40

UNIFORM LOAD, HYDROSTATIC CONDITION


Nominal Capacity
:
795 m3
(Data Sheet)
1010 kg/m3 * 1600 m3
Berat Fluida (Produced Water)
=
-

Unit Weight
3.791
5.42
0.019625
0.179451
4.05
0.5027555556
3.0551
34.44
23.7144
29.52
18.7452
1.641856
5.7994
24.3
20.34
21.18

kg/m2
(Data Sheet)
6,751.30 kg
256.02 kg/m

UNIFORM LOAD, OPERATING CONDITION


Working Capacity
:
317 m3
(Data Sheet)
SG Fluida
(Data Sheet)
:
0.86
Berat Jenis Fluida
SG Fluida / SG Water * 1000 kg/m3
:
1010 kg/m3 * 1512 m3
Berat Fluida (Produced Water)
=
-

kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg
kg/m
kg/m
kg/m

=
=
=

10%

=
=

LOAD (L)
Uniform Roof Load
Roof Load (Live Load)
Roof Load (Live Load)

ea
ea
ea

Uniform Load, Hydrostatic Condition, W h

=
12,354.86

Page 22 of 23

683,700.00 kg
kg/m2

SHEET

A
Total Weight (kg)

Unit Weight
11.27
3.7
16.06
5.9
28.23
8.6
42.49
13.7
60.24
19.5
2.5
5.43
254.48

m
pcs
m
pcs
m
pcs
m
pcs
m
pcs
m
m
m

ea
m
ea
ea
m
ea
ea
ea
ea
ea
ea
ea

REV

4.51
3.70
25.70
23.60
67.75
51.60
67.98
54.80
24.10
19.50
4.00
2.17
305.38
654.78
Total Weight (kg)
113.73
5.39
0.02
0.18
47.23
15.08
15.28
103.32
47.43
59.04
37.49
1.64
202.98
218.70
183.06
190.62
1,241.19
Kg
Kg
Kg

10 of 10

TITLE
PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL
ATTACHMENT 1

UBEP Sangasanga & Tarakan

WIND LOAD (WL)


Wind Speed
OD Shell Plate
Tinggi Tanki, H
-

=
=
=
Av

Vertical Plane

DOCUMENT NUMBER

FORMAT

REV

SHEET

F007-12-CAL-CS-001

A4

10 of 10

126 km/hr
8.40
m
6.00
m
=
=

(Data Sheet)

OD x H
50.40 m2

Dari UBC 1997

Ce Cg qs Iw
Design Wind Pressure, P =
Ce
=
combined height, exposure and gust factor coefficient as given in Table 16-G (UBC 1997)
=
1.23 (Exposure C)
Cg
=
pressure coefficient for the structure or portion of structure under construction as given in Table 16-H (UBC 1997)
=
0.8 (winward wall)
qs
=
wind stagnation pressure at standard height of 10000 mm as forth in Table 16-F (UBC 1997)
=
0.79 kN/m2
(16.4 psf)
Iw
=
importance factor as set forth in Table 16-K (UBC 1997)
=
1.15 (Essential facilities)
P
=
0.89 kN/m2
Wind Load, W L
44.80 kN
=
P x Av
=
=
4,571.69 kg

Momen di dasar tangki akibat W L

MW
W L x H/2
=
Reaction due to W L, Rw

Rw

13,715.07

W L/(0.87*D) x H/2

=
=
=

1,876.72 kg
71.167
kg/m

(pembebanan di ringwall / keliling tanki)

SEISMIC LOAD (EL or V)


Seismic Factor
: SUG II (Data Sheet)
Seismic Zone Factor, Z
=
0.15
Maximum Seismic Load (design base shear): V
V
=
2.5*Ca*I*W/R
Ca
I
R

kg.m

=
=
=

W
Vmaks

0.18
1.25
4.5
=
=

(Table E-2 API-650 untuk Seismic Factor 2A)


(UBC 1997 Section 1630.2.1)

(table 16-Q UBC 1997, untuk Sc dan Z=0.15)


(table 16-K UBC 1997, untuk Essential facilities)
(table 16-N UBC 1997, untuk Concrete shear walls)

DL + W O

34,363.87 kg
4,295.48 kg

Minimum Design Seismic Load (design base shear): V


V
=
0.11*Ca*I*W
Vmin
=
850.51 kg

(UBC 1997 Section 1630.2.1)

Design Seismic Load (design base shear): V


V
=
Cv*I*W/(R*T)

(UBC 1997 Section 1630.2.1)

Ct(hn)3/4

Ct
hn
T

=
=
=

0.0731
7.2
0.3213

Cv

0.25

(table 16-R UBC 1997, untuk Sc dan Z=0.15)


928.40 kg

Momen di dasar tangki akibat V


MS
=
V x H/2

Reaction due to V, Rw
Rs

(UBC 1997 Section 1630.2.2 Method A)

=
=
=

V/(1.07*D) x H/2
309.88 kg
11.75 kg/m

2,785.19

(digunakan yang ini)

kg.m

(pembebanan di ringwall / keliling tanki)

Page 23 of 23

(g = 9.8 m/s2)

You might also like