Assumptions for electrcity consumption by the project activity

Electrical operating load of Mother


Liquor Treatment Plant (MLTP)
(Continuous operation)
Electrical operating load of 1000 m
WWTP
Operating load of existing 2000 m
WWTP
Connected load of boiler (Blowers)

kW

30.02

kW

153.49

kW

174.32

kW

30

Electrical operating load of Digester


recirculation pump
Electrical operating load of sludge
disposal pump
Electrical operating load of caustic tank
mixer
Working hours on grid
Operating hours of Digester
recirculation pump and Sludge disposal
pump on grid
Operating hours of caustic tank mixer
on grid
Operating days
Operating hours of installed
equipments on DG

kW

30

kW

3.7

kW

0.37

Hours/year
Hours/year

8742.29
8012.29

Hours/year

7282.29

days
Hours/year

365
17.71

tivity
Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06-Mar-08 (Refer:
Thermax Offer, Page No.6 - Operating load for MLTP & Page.17 - Operating load of
Booster pump (11.25 KW = 15 HP * 0.75)
Thermax Offer:Wws:DDIL:ETP:2000:TCOff-03 dt.07-Feb-05, Page no: 25,
Thermax Offer:Wws:DDIL:ETP:2000:TCOff-03 dt.07-Feb-05, Page no: 12,
Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06-Mar-08
(Refer: Thermax Offer, Page No. 14)
Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06-Mar-08 (Refer:
Thermax Offer, Page No.6 - Operating load for Digester recirculation pump
Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06-Mar-08 (Refer:
Thermax Offer, Page No.6 - Operating load for Sludge disposal pump
Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06-Mar-08 (Refer:
Thermax Offer, Page No.6 - Operating load for caustic tank mixer
Letter by Thermax Ltd. (Technology Supplier) dt. 02-July-10

Letter by Thermax Ltd. (Technology Supplier) dt. 02-July-10


Calendar days
Ref. Sheet -DG running hours