Rigless Conductor Recovery

Challenges
Rig Less
the lack of accommodation
lack of rotary / SIMOPS
table (use of spreader beams positioned to span the original DP skid beams)
platform cranes rating
deck space
Working hight restritions (is jack-up over head)
logistics / backloading
Formation (pebble beds, cement patio)
barnacle-encrusted conductor pipe through the platforms guides
location/experience of rig less operators