You are on page 1of 14

Site Survey/Site Selection

Fortune LTE Project


GENERAL PURPOSE OF TECHNICAL SITE SURVEY IS TO EVALUATE AND VALIDATE
TELECOM SITES BASED ON THE FOLLOWING:

• Confirm the space availability for the


Proposed Structure
• Power availability
• Accessibility
• Cost consideration
• Network Compatibility
GUIDELINES
• SITE TYPES Greenfield
Monopole

Guy Mast Self Supporting Tower

Camouflaged cell towers


• SITE TYPES Rooftop

Bipod/Tripod

Bipod/Tripod RT-SST
SPACE REQUIREMENTS FOR ROOFTOP

• Space Requirements:
1. 3.5m x 3.5 m= 9sq.m (Minimum)
2. 2.5m x 2.5 m= 4 sqm( 2 to 3 points) (Minumum)

Space should not be limited on square feet(sq.m)-whole roof


deck/rooftop shoul be considered
- Consider the space for Equipment, cable trays
- Grounding System space availability
BUILDING REQUIREMENTS FOR ROOFTOP

• Building Height Requirements:

Building Floors Rooftop Antenna Support Structure


5 to 6 Storey: 9m Bipod/RT SST
7 Storey: 6m Bipod
8 to 9 Storey: 3m BiPod
TYPICAL ROOFTOP SITE LAYOUT

LAYOUT PLAN OF ANTENNA MAST

Bipod/Tripod(1 mast)
TYPICAL ROOFTOP SITE LAYOUT

Bipod/Tripod(1 mast)
TYPICAL ROOFTOP SITE LAYOUT

Bipod (3 mast)
TYPICAL ROOFTOP SITE LAYOUT

Rooftop-SST( 1 mast)
• Building with roofdeck/Slab is preferable
• Building with GI sheet roofing can be considered but with complex building structure modification
and Design consideration.
• Structure Type/Height against Area for the site • Flooding(Greenfield site)
Proposed Structure should fit on the area acquired/area to be Check flood history in the Area
developed. • Electrical Line Extension
Structure on the roof deck, for the equipment (Rooftop site). Length and distance of available power source
Considerations for a Multi carrier site (additional Structure) • Power Outages in the Area
• Site location For generator allocation.
Site condition feasible for construction • Power Source Rated Voltage
Free of obstruction. All existing facilities, improvement, existing Required information needed
vegetation, trees that need removed • For Rooftop sites
Site level /profile. Site with excessive slope with alternative Engineering solution such Grounding system route cables location of earth Pits
as cut and fill, or provide retaining walls. Power System routes of cables source of power in the building
SETBACKS (Near school, Mosque, Inside Monastery. Near body of water shall be flagged and
subject for rejection of the site. Generator Requirements
• Access to the site. -Site will provided with generator
Road condition. Mode of transport. - Space for Gen set on the ground
Access road, distance and length must be indicated. Other structure: Drainage/canal
crossing proposal
ROW-Road Right of Way. Access to the site shall be unrestricted.
Access for Cranes specially rooftop site.
Access for delivery of material, equipment and generators.
• Special Handling
Mode of transportation. Site that requires to travel by Boat/bancas, Motorcyles, light vehicles,
Motorized carriage, travel
by foot to reach the and for delivery of materials
Distances and length