You are on page 1of 1

SIL/CIL/EIL Assessment sheet

Client

BPP

Item no.

17.1

Project

Mazari SIL Study

Tag No.

H-610 (still column and reboiler)

Area

Mazari

P & ID no.

018-006-D-1014

Initiating event
Parameter
Associated tags

Low pressure or low flow


Fuel gas supply system
BSL-6001
Risk
considered

People

Worst consequence
Consequenting rating
TMEL (Category)
TMEL (Value)

Causes of imitating
events

Flame out/fire
Ref. Hazop matrix
Safety
Environmental Commercial
D(A Hazop) G(D Hazop) E (B Hazop)
0.00003
0.03
0.003
Initial
Likelihood
per year

General
Process
Design

Environmental
Asset

BPCS

Alternative
fuel supply
system

Additional
Independent
Mitigation
Low
Additional
Dikes
Pressure
flame arrestor
(Bunds),
Controller
Pressure
(N/A)
Relief-N/A

Additional
Mitigation,
Restricted
Access

ICL Safety

Operating and
maintenance
procedure
Regulator failure

0.1

1.0

1.0

0.1

0.1

1.0

1.0

1.0

0.001

Operator error

0.1

1.0

1.0

0.1

0.1

1.0

1.0

1.0

0.001

Total mitigated frequency due to all causes (total mitigated frequency)

0.002

SIL Calculations
Probability on demand (Fgoal or TMEL/Total mitigated frequency) =

PFD (SIL)

Risk reduction factor=

RRF

67

Safety integrity level=

SIL level

ICL
Environment
PFD (EIL)
RRF
EIL level
ICL
commercial
PFD (CIL)
RRF
CIL level

Initiating cause likelihood (Environment)


Probability on demand (Fgoal or TMEL/Total mitigated frequency) =
Risk reduction factor=
Safety integrity level=
Initiating cause likelihood (commercial)=
Probability on demand (Fgoal or TMEL/Total mitigated frequency) =
Risk reduction factor=
Safety integrity level=

1 of 1

0.015

0.001
15
0
0
0.001
3
0
0

You might also like