Professional Documents
Culture Documents
Client
BPP
Item no.
17.1
Project
Tag No.
Area
Mazari
P & ID no.
018-006-D-1014
Initiating event
Parameter
Associated tags
People
Worst consequence
Consequenting rating
TMEL (Category)
TMEL (Value)
Causes of imitating
events
Flame out/fire
Ref. Hazop matrix
Safety
Environmental Commercial
D(A Hazop) G(D Hazop) E (B Hazop)
0.00003
0.03
0.003
Initial
Likelihood
per year
General
Process
Design
Environmental
Asset
BPCS
Alternative
fuel supply
system
Additional
Independent
Mitigation
Low
Additional
Dikes
Pressure
flame arrestor
(Bunds),
Controller
Pressure
(N/A)
Relief-N/A
Additional
Mitigation,
Restricted
Access
ICL Safety
Operating and
maintenance
procedure
Regulator failure
0.1
1.0
1.0
0.1
0.1
1.0
1.0
1.0
0.001
Operator error
0.1
1.0
1.0
0.1
0.1
1.0
1.0
1.0
0.001
0.002
SIL Calculations
Probability on demand (Fgoal or TMEL/Total mitigated frequency) =
PFD (SIL)
RRF
67
SIL level
ICL
Environment
PFD (EIL)
RRF
EIL level
ICL
commercial
PFD (CIL)
RRF
CIL level
1 of 1
0.015
0.001
15
0
0
0.001
3
0
0