You are on page 1of 1

ENGINEERING REVIEW COMMENTS

CONTRACT NO.
CONTR. TITLE
CONTRACTOR
REVIEW SUBJECT

ITEM

ME 0

ME

PID A-0050B Task Order 20B


Design - Roads, Utilities in light industrial park expansion (LIPE) area
SOFCON
90% Review of package on T.O. 20B

REFERENCE
DWG. PAR. ETC

Calculations

Hydraulic calculations

PAGE
EWR NO.
DISCIPLINE
REVIEWER
SECTION MGR.
DATE

COMMENTS
The calculations provided are not clear and are not done in a systematic way. The
calculations should include following as minimum:
1. Index
2. Nomenclatures and symbols (with units)
3. Formulae used
4. Design input data / parameters (with their reference), limiting values,
assumptions in design, if any etc
5. Detailed calculations
Please consider following data / information for the hydraulic calculations:
1. For calculating friction losses in force mains, use the Hazen Williams equation
with C = 110 for GRP or Plastic pipes
2. Rated flow = 10 % over normal flow
3. Rated pressure = Normal pressure x (Rater flow / Normal flow)^2
4. Desired force main velocities are from 1 to 1.5 m / sec to prevent deposition of
solids at minimum flow

1 of 1
79074
Mechanical
Rajkumar Manikappa
B. R. Samanta
3rd March , 2007

ACTION TAKEN