DISCIPLINE : PIPING
STRESS CALCULATION
DOCUMENT NUMBER :
DWE-PI-00-CA-0001
REVISIONS
PAGE ATTACHMENT REMARK
A B 0
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
RECORD OF REVISION
Rev. Implemented
Section Page Company Comment Explanation
No (Y/N)
TABLE OF CONTENT
1. INTRODUCTION ........................................................................................................... 5
2. OBJECTIVE .................................................................................................................. 5
3. REFERENCES .............................................................................................................. 5
8. ATTACHMENT ............................................................................................................ 13
1. INTRODUCTION
PT. ASAHIMAS CHEMICAL (AGC GROUP) Intends to Modification Vapor Line project at
2. OBJECTIVE
The analysis shall ensure that the piping systems conform to applicable piping codes and
equipment specifications.
Line numbers which are calculated are around equipment heat exchanger (HE-2410 A/B) to
- 20”-PL-132-24-258-H27
- 10”-PL-132-24-297-H75
- 4”-PL-45-24-27-H65
- 6”-PL-348-24-1211-H65
Design Consideration in the pipe stress analysis and Load from piping system acting on load
3. REFERENCES
This calculation has been performed based on all data and requirements on referred
• PFD DrawingTIP-PI-00-EC-0009
4. DESIGN DATA
Design data for this calculation is listed below. The detail of process data for each piping
Weight
Weight
Yield Stress
Size (inch)
(Sy) [psig]
m in
No. Mat’l Spec. m in Allowance of
kgs
kgs (mm) Flange
(mm) Sch. (Full of
(Empty)
Water)
1 B03 ASTM A106 Gr. B 4 35000 6.02 40 16 24 1.27 150#
2 B03 ASTM A106 Gr. B 6 35000 7.11 40 28 47 1.27 150#
3 B03 ASTM A106 Gr. B 10 35000 6.35 20 42 95 1.27 150#
4 B03 ASTM A106 Gr. B 20 35000 9.525 20 117 305 1.27 150#
5. METHODOLOGY
5.1 Software
The software program which is used for carrying out the stress calculations is CAESAR II
verion 5.10 developed by Coade Inc and the analysis uses the following coordinates:
X: South Y
Y: Up
Z: West
Z X
Friction effects shall be included in the thermal expansion and contraction analysis for all
sizes lines and all sizes lines connected to strain and load sensitive equipment.
Friction force shall be calculated based on the properties of the sliding surface and contact
Abbreviation:
6. RESULT OF ANALYSIS
Summary of pipe stress calculations for each combination load, are provided in the table
below.
Summary of restraint load in this calculation are provided in the Table below and the detail of
Summary of nozzle check for each equipment connected to piping system in this calculation
My Kg.m 2744.2
Mz Kg.m 1901.7
Fx Kg 7303
Fy Kg -2772.3
Fz Kg -1042.5
HE-2410 B 300
Mx Kg.m --444.2
My Kg.m 1339.8
Mz Kg.m -3265.9
Fx Kg -5543.2
Fy Kg 62.7
Fz Kg -1585.1
TW-2404 200
Mx Kg.m -749.9
My Kg.m -1456.3
Mz Kg.m -380.3
Equipment Node
Direction Unit Active Load Remark
Name Number
My Kg.m -290.2
Mz Kg.m 81.6
Fx Kg 124.1
Fy Kg -202.1
Fz Kg -337.8
HE-2410 B 300
Mx Kg.m -16.2
My Kg.m -219.8
Mz Kg.m -13.2
6.4 Displacement
Summary of restraint load in this calculation are provided in the Table below and the detailing
Calculated Allow.
Case
Load Cases Node Line No. Displacement (mm) Displacement
No.
Dx Dy Dz (mm)
85 20”-PL-132-24-258-H27 -0.423 - -
Hydrotest
01 420 20”-PL-132-24-258-H27 - -3.082 - 25.4
(WW+HP)
420 20”-PL-132-24-258-H27 - - 0.548
130 20”-PL-132-24-258-H27 -8.993 - -
Operation
02 420 20”-PL-132-24-258-H27 - -3.300 - -
(W+T1+P1)
70 20”-PL-132-24-258-H27 - - 14.888
40 20”-PL-132-24-258-H27 -0.433 - -
Sustained
04 420 20”-PL-132-24-258-H27 - -3.154 - 25.4
(W+P1)
420 20”-PL-132-24-258-H27 - - 0.561
Calculated Allow.
Case
Load Cases Node Line No. Displacement (mm) Displacement
No.
Dx Dy Dz (mm)
Hydrotest 01 180 10”-PL-132-24-297-H75 -0.022 - - 25.4
Calculated Allow.
Case
Load Cases Node Line No. Displacement (mm) Displacement
No.
Dx Dy Dz (mm)
(WW+HP) 1070 10”-PL-132-24-297-H75 - -1.484 -
160 10”-PL-132-24-297-H75 - - -0.017
90 10”-PL-132-24-297-H75 -4.540 - -
Operation
02 170 10”-PL-132-24-297-H75 - -6.204 - -
(W+T1+P1)
90 10”-PL-132-24-297-H75 - - 14.269
180 10”-PL-132-24-297-H75 -0.025 - -
Sustained
04 1070 10”-PL-132-24-297-H75 - -1.612 - 25.4
(W+P1)
180 10”-PL-132-24-297-H75 - - 0.024
Calculated Allow.
Case
Load Cases Node Line No. Displacement (mm) Displacement
No.
Dx Dy Dz (mm)
135 6”-PL-348-24-1211-H65 0.046 - -
Hydrotest
01 90 6”-PL-348-24-1211-H65 - -0.870 - 25.4
(WW+HP)
135 6”-PL-348-24-1211-H65 - - -0.054
130 6”-PL-348-24-1211-H65 -5.396 - -
Operation
02 130 6”-PL-348-24-1211-H65 - 8.331 - -
(W+T1+P1)
130 6”-PL-348-24-1211-H65 - - -10.034
135 6”-PL-348-24-1211-H65 0.046 - -
Sustained
04 90 6”-PL-348-24-1211-H65 - -0.874 - 25.4
(W+P1)
135 6”-PL-348-24-1211-H65 - - -0.054
The following conclusions have been made from the result of the analyses:
1. For line number 20”-PL-132-24-258-H27; the maximum stresses is 185.6 MPa (57.2%
stress ratio) at node 150 which is meet the allowable criteria due to Expansion case.
horizontal direction (x-axis) at node 130 at operation load case L2 (OPE) = W+T1+P1.
3. For inlet line number 20”-PL-132-24-258-H27, in order to avoid thermal stress (for
expansion load case 6 (L6) and load case (L7), it is needed to change piping configuration
as seen attachment A. Caesar II Model or attachment G. Stress Isometric.
4. For line number 10”-PL-132-24-297-H75; the maximum stresses is 236.5 MPa (70.5%
stress ratio) at node 140 which is meet the allowable criteria due to Expansion case.
7. For line number 6”-PL-348-24-1211-H65; the maximum stresses is 24.3 MPa (17.6%
stress ratio) at node 320 which is meet the allowable criteria due to Sustain case.
horizontal direction (-z-axis) at node 130 at operation load case L2 (OPE) = W+T1+P1.
9. The Nozzle loads at HE-2410 and TW-2404 will be checked against allowable nozzle
8. ATTACHMENT
Attachment D – Displacement
Attachment E – P&ID
Attachment A
Input Listing
DWE-PI-00-CA-0001 Rev. A
DETAIL ENGINEERING WORK FOR VAPOR LINE HE-2410 A/B
STRESS CALCULATION
Attachment B
Stress Summary
DWE-PI-00-CA-0001 Rev. A
DETAIL ENGINEERING WORK FOR VAPOR LINE HE-2410 A/B
STRESS CALCULATION
Attachment C
Restraint Summary
DWE-PI-00-CA-0001 Rev. A
DETAIL ENGINEERING WORK FOR VAPOR LINE HE-2410 A/B
STRESS CALCULATION
Attachment D
Displacement
DWE-PI-00-CA-0001 Rev. A
DETAIL ENGINEERING WORK FOR VAPOR LINE HE-2410 A/B
STRESS CALCULATION
Attachment E
P&ID
DWE-PI-00-CA-0001 Rev. A
DETAIL ENGINEERING WORK FOR VAPOR LINE HE-2410 A/B
STRESS CALCULATION
Attachment F
Stress Isometric
DWE-PI-00-CA-0001 Rev. A