Professional Documents
Culture Documents
wtg
Title
Engineer
Company
Date
Notes
17/07/2015
Scenario Summary
ID
Label
Notes
Active Topology
Physical
Demand
Initial Settings
Operational
Age
Constituent
Trace
Fire Flow
Energy Cost
Transient
Pressure Dependent Demand
Failure History
User Data Extensions
Steady State/EPS Solver Calculation
Options
Transient Solver Calculation Options
1
Base
Base
Base
Base
Base
Base
Base
Base
Base
Base
Base
Base
Base
Base
Base
Active Topology
Physical
Demand
Initial Settings
Operational
Age
Constituent
Trace
Fire Flow
Energy Cost
Transient
Pressure Dependent Demand
Failure History
User Data Extensions
CALCULO ESTATICO
Base Calculation Options
Network Inventory
Pipes
Junctions
Hydrants
Tanks
Reservoirs
Pumps
Pump Stations
Variable Speed Pump
Batteries
11
10
0
0
2
0
0
0
PRV's
PSV's
PBV's
FCV's
TCV's
GPV's
Isolation Valves
Spot Elevations
1
0
0
0
0
0
0
0
Rupture Disks
Discharges to Atmosphere
Orifices Between Pipes
Valves With Linear Area
Change
Surge Tanks
0
0
0
0
0
0
0
Surge Valves
Check Valves
0
0
0
0
90 m
401 m
300 m
1.25 (in)
1.50 (in)
All Diameters
356 m
540 m
1,688 m