Professional Documents
Culture Documents
second floor
third floor
fourth floor
no of wc
no of lav
no of sprinkler
no of urinals
no of faucet
ksk
total height of building
25mm 4m PPR
25mm 4m PPR
25mm 4m PPR
25mm 4m PPR
TOTAL LENGTH
PIPES
PIPES
PIPES
PIPES
0.3
8.17
38.29
55.989
351.8597
23
21
3
6
6
7
0.5
11.5
1
21
0.25
0.75
0.5
3
0.25
1.5
1
7
10.2
25mm 4m PPR PIPES TOTAL LENGTH OF PIPES
406.8097
NO OF PIPES
94.73824
95
32mm 4m PPR PIPES TOTAL LENGTH OF PIPES
27.85672
NO OF PIPES
6.964181
7
21
2
8
1
8
1
31
2.8965
0.2214
0.6
0.2214
4.2
0.2214
0.6
0.2214
78.16
116.45
232.9
4.69
237.59
27.85672
378.953
1.6862
4.5434
1.8279
0.227
0.4
0.227
4.5
0.337
22
0.0638
9.701
0.3378
0.1928
4.1
0.1928
0.6
0.1928
1.6768
2.0489
1.9697
78
3.3429
0.5492
0.5133
1.3983
50.1107
BILL OF MATERIALS
DESCRIPTION
QTY
FIXTURES
Water Closet Set(Lavatory Rod, Paper Holder/Soap Holder)
Water Closet
Urinal
Floor Drain
Shower Drain
Shower Set
Faucet
Kitchen Sink
P-Trap
Sprinkler
6
15
6
41
6
6
34
7
72
3
SANITARY LINES
100
33
58
45
76
6
8
5
68
55
24
17
6
91
43
15
6
29
ALS
UNIT
UNIT COST
TOTAL COST
sets
pcs
pcs
pcs
pcs
sets
pcs
sets
pcs
pcs
25000.00
15000.00
8770.00
256.00
150000.00
225000.00
52620.00
10496.00
0.00
0.00
11900.00
58240.00
0.00
0.00
PHP 508,256.00
350.00
8320.00
Total
R LINES
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
538.00
932.00
16.00
25.00
26.00
40.00
34.00
34.00
650.00
767.00
55.00
20.00
Total
51110.00
6524.00
768.00
100.00
2028.00
720.00
748.00
68.00
52000.00
767.00
0.00
0.00
1705.00
600.00
PHP 117,138.00
ES
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
pcs.
pcs.
pcs.
pcs.
Total
0.00
0.00
0.00
0.00
PHP 0.00