Professional Documents
Culture Documents
A. Masonry Works
A.1 Concrete Hollow Blocks, all labor works only incl. laying
out, rebar installation, job mixing, lintel beams and stiffener
columns, zocalo, seismic gaps, handling and laying
A.2 Smooth cement plaster ready to receive paint finishes, all labor
works only, incl. laying out, job mixing, handling and plastering
A.3 Silicone Sealant with backer rod on both side (vertical and
horizontal) with styrophor filler (seismic gap)
NOTE:
NOTE:
NOTE:
- STRUCTURAL COLUMNS TO
FINISH READY TO RECEIVE
PAINTING
NOTE:
- STRUCTURAL COLUMNS TO
FINISH READY TO RECEIVE
PAINTING
NOTE:
- STRUCTURAL COLUMNS TO
FINISH READY TO RECEIVE
PAINTING
NOTE: