You are on page 1of 2

Page 1

Flow Meter Site Investigation


Project: Location: Date/Time: Crew:
Omaha FM 60’ from road 3-3-10 / 15:00 JN - RC
MH#: Pipe Shape: Pipe Material: Pipe Size (in):
4051002 Circular RCP 60
Site ID: Address: Site Quality: Basin:
44 No address Good

Location Map Planar Description

Summary Description:

Site Hazards Measurements Site Conditions


Heavy Traffic? No Manhole Depth (ft): 18.03 Surcharge Evidence? Yes
Needed Traffic Attendants: 0 Manhole Dia. (in): 120 x 78 Depth of Surcharge (ft): 6
H2S: 0 O2: 20.5 MH Cover Size (in): 32.5 Depth of Debris (in): 0
LEL: 0 CO: 0 MH Cover Type: Hinged, pick, lock Usable MH Steps? Yes
Describe potential hazards: Measured Flow Depth (in): 21 Meter: FloDar / FlowShark
Velocity (fps): 2.75 Cellular Signal Strength: Fair
Mounting Band Description: Antennae Install Considerations:

Flodar with regular bracket Antennae box in grass next to MH or


Scissor jack with anchor bolts possibly use existing flowshark
antennae hole and mount on top
exposed
Other Comments: Permanent Power Available?

Light pole 75’ from MH


Page 2

Installation Sketch & Notes Pipe Cross Section

Depth (in) Width (in) Depth (in) Width (in)

SURFACE DOWN

INFLOW OUTFLOW

You might also like