Improvement for
Distribution Utilities
Role of Technology and
Operational Practices
Vivek Singla
North Delhi Power Limited
1st July, 2008
Presentation Flow
Part I - Introduction to NDPL
Recovery + Return
Regulator consulted prior to unbundling and bound by Transfer
Scheme
Funding of Terminal Benefit Liabilities; Other Contingent Liabilities
Delhi Reform Framework…Cont…
GENCO DISCOM-II
Indraprastha TRANSCO DISCOM-I DISCOM-III
Power BSES Yamuna BSES North Delhi
Delhi Transco Rajdhani
Generation Limited Power Limited Power Limited Power Limited
Company Ltd.
basis.
No penalty for shortfall in supply or purchase.
NDPL to DTL
DTL assures arrangements against forecast, prior to
Front-end Back-end
Generator
UTILITY
Tx. Utility
Govt.
Consumer Trader
Regulator SLDC
Efficiency to Effectiveness.
AT&C
Losses Identificatio
n of 3 Broad
Areas for
Network Improvemen
Constrai
nts t
Strategic Roadmap – pillars for 2002-
Revamped Substations
Power Supply Improvement – Initiatives Cont…
•Network
All Planning
Utility network & Management
assets including Grids,
Substations, Feeder Networks are mapped.
Global Positioning System is used for
accurate positioning of assets which is
critical from operational point of view.
All Consumers as available in CRM of the
NDPL are geographically captured.
Consumer’s LV network feeding points
(poles/pillars) are marked on the map.
Benefits Reaped from GIS
System Improvements schemes being built on GIS which
resulted in savings of approximately Rs.30,00,000 in the very
first system improvement scheme approx. ten (10) percent of
Scheme value
Asset Management
Commercial Management
Legend
•Decentralized •Centralized
•Empowerment to Zones •Consumer Segmentation
•Profit Center •Benchmarking for
Consumer Service
Ndpl has used the age old munadi concept to inform its
consumers about planned shut down & break downs.
• Field Service
Executive (FSE) visits
the consumers’
premises and completes
all formalities for new
connections.
New Connection at Door
step
Meter Installation
through VAN Model –
initiative towards
enhanced output, each
Van installs about 7-8
meters per day.
Meter Installation Van
Initiatives towards expediting energization period of new
connections
Enhancing Consumer
Convenience
22 Fully networked Consumer Care Centers for quick
redressal of Consumer complaints. Each District Consumer
Care Centre has a Relationship Officer who is a qualified
MBA
Payment Avenues – Consumer convenience
Sankalp
Scheme was launched with
objective of improving Billing
and Collection Efficiency
through increased Employee
participation
JJ Cluster Scheme
Sahyog
This Scheme (Franchisee)
was launched to reduce
AT&C losses in clusters of low
income group habitats.
Contribution from
Zone/District
Zones develop and suggest their action plan, by
including, but not limited to, the following into their strategy
for reducing the AT&C losses in their respective
zones:
• HVDS Implementation
• LTABC Implementation
• Local Enforcement
• Load shedding
F2 F7
F7 –– Reduce 5% F8 – Reduce
F2 –– Grow
Grow F4
F4 –– Enhance
Enhance sales
sales 10% Reduce F8 – Reduce
15% revenue
revenue in
in thru
thru partnerships
partnerships unit
unit cost
cost of
of cost
cost to
to serve
serve
20% F6
F6 –Reduce
–Reduce power
non-regulated
non-regulated e.g.
e.g. time
time of
of day
day 10% power
business
business tariffs
tariffs etc.
etc. F5
F5 –– fixed
fixed cost
cost of
of purchased
purchased
F3
F3 –– Reduce
Reduce Reliability network
network per
per
Reliability of
of
commercial
commercial supply input
input unit
unit
40% AT&C supply
AT&C losses
losses
30%
35% 20% C3
C3 –Low
–Low Revenue
Revenue Base
Base 10%
Customer
C1
C1 -High
-High Revenue
Revenue Base
Base C2
C2 -Government
-Government C4
C4 -Franchisees
-Franchisees
-High reliability
-24 x 7 -24 x 7 -Accurate metering/billing -Fair margin return
-Premium service quality -Premium service quality -Timely connection -Fair terms
-Promptness -Promptness -Convenient payment -Hand holding
-Reducing cost -Reducing cost modes
-Communication -Communication -Timely information
-Flexibility -Flexibility
-Prompt redress
20% 15% 30% 15% 20%
Customer
Customer Relationship
Relationship
Advocacy
Advocacy Service
Service Delivery
Delivery Loss
Loss Reduction
Reduction Cost
Cost Leadership
Leadership
Management
Management
P1-Ensure
P1-Ensure P7- P22-Identify
P22-Identify
P7- Ensure
Ensure P18-Right
P18-Right 15%
effective
effective adequate
adequate 20%
P11- Ensure 40%
P11- Ensure P15- size
size lower
lower cost
cost
enforcement P4-Brand
P4-Brand meter P15-
enforcement20% supply
supply to
to meet
meet meter Convenience organisation
organisation finance
finance 15%
building
building replacement Convenience
load replacement to
to improve
Internal Process
load improve
P2-
P2- Achieve
Achieve P23-Improve
P23-Improve
productivity
productivity
opinion/envir
opinion/envir P8-
P8- Ensure
Ensure P12- treasury
treasury P26-
P26-
P12- Effective
Effective P16-
onment
onment 25% network
network 40% billing P16- P19-Optimise
P19-Optimise management 10%
management Identify
Identify
billing &
& 30% Transparency
shaping
shaping P5-Policy availability
availability recovery Transparency procurement
procurement cheaper/
cheaper/
P5-Policy recovery
advocacy process
process P24-Improve
P24-Improve alternate
alternate
advocacy 25%
P9-
P9- Timely
Timely P13- P17-
P17- capital
capital power
power
P3-Consumer
P3-Consumer P13- Effective
Effective P20-Identify
P20-Identify
connection
connection 15% enforcement Effective/timel
Effective/timel efficiency
efficiency 20% sources
sources
communication
communication enforcement savings
savings from
from
20% 30% yy grievance
grievance 10% 20%
outsourcing
outsourcing
handling
handling 100% P25-Improve
P25-Improve
P6-Advocacy
P6-Advocacy P10-
P10- Reliable
Reliable
P21-Identify
P21-Identify project
project
for
for enhancing
enhancing billing
billing
10% 25% process
process cost
cost management
management
consumer
consumer base
base 10%
improvements
improvements processes
processes
/commitment/customer focus
-Enhance employee engagement -Drive business excellence
conducive to performance
-Improve decision making thru KM
-Imbibe the value system
- Capture & disseminate external
Organizational Performance
Alignment
- Catch Ball Theory
VISION & MISSION
O
P
CORPORATE MIS M
S
Mapping the Initiatives thro Perf. D
Scorecards
P
Targets & Initiatives for MTM CEO, COO, Senior Corporate BSC Reviews,
FY08-09 Advisors, all HODs Organizational Policy Issues,
comprising MTM Business Excellence , Cross
Every Functional Review functional Issues
through BSC
Rolling of all Functional &
CRM COO, Head Commercial BSC Review,
Commercial, MTM Commercial Issues
Corporate BSC through
Members, Circle
SAP Heads, concerned
Link all Issues to the
Dept
Measure of BSC
NRM COO, Head Operation BSC Review,
Institutionalization of Operations, MTM Operational Issues,
Departmental Scorecards Members, Circle District/Zonal Scorecard
used as Review Tool Heads, concerned Review Performance
Widening scope to cover ZMs
AMCs IRM COO, MTM , Infrastructure issues,
HOD(CE&C), HOD security, Training,
(Governance), Administration Issues,
concerned Dept.
FRM Functional Heads & Group Performance Review
respective Dept.
HOGs
ORT/ Head Operations, Circle, district specific Issues
PRT/ Circle Heads,
District/Zonal Scorecard
Deployment of Corporate
5.00
& Divisional
1.66 5.00
Balanced
5.00 0.60 3.13
4 Safety of Work 0.05 0.10 0.21 0.28 0.05 0.03
Scorecard3.16 from April
4.15 2006.
4.10 2.50 3.33 5.00
5 Innovation 0.08 0.00 5.00 0.00 0.00 0.00
1.95 5.00 0.85 0.77 0.00 0.58
6 Compliance to statutory requirements 5.00 5.00 5.00 5.00 5.00 5.00
5.00 3.75 5.00 5.00 5.00 5.00
7 Contract Closing 5.00 5.00 5.00 5.00 5.00 5.00
5.00 5.00 5.00 5.00 5.00 5.00
8 Suyojna/Online Progress orientation 15.10 12.79 11.41 8.70 10.59 10.59
18.30 19.04 17.37 20.00 19.43 19.06
CUMMULATIVE SCORE FOR FY: 05-06 59 63 59 53 46 47
Monitoring AT&C Losses
Organizational Excellence
&yti r ut a M
ec nar uss A
ec na net s u Sfl e S
eli Mt s a L
ec na mr ofr e P
e gna h C
ec na mr ofr e P
noit a dil os no C
t ne me ga na M
f o noit a ni mil E
t f e h T yti ci rt cel E
WEDDING ANNIVERSERY
FESTIVALS
Birthday
50% 530
. %
45% 477
. 9%
448
. 6%
40%
Govt stipulated loss level Bid loss level
35%
30% 337
. 9%
Intelligent
Transparency
Enterprise Award
in Billing System
For IT initiatives