Presented by,
Dharmender Pratap Singh
Roll no. - 0709140037
Faculty Coordinators,
Asst. Prof. A.N.Veerendra Kumar
Asst. Prof. S.P. Ramesh
Phase -1 Phase -2
Total capacity
720MW
DEPARTMENTS VISITED
Components are:-
3. SCRAPPER CONVEYOR
4. FURNACES
6. DRAFT FANS
• natural circulation,
• vertical membrane water wall
BOILER
construction,
• reheat,
• tangentially fired furnace using
pulverized fuel and having a maximum
continuous rating of 700 tones/hr.
• working pressure of 137kg/cm2 and
• final stream temperature at 540 deg
centigrade.
Turbine Maintenance Department
Main turbine
210MW turbine is a cylinder tandem compounded type machine
comprising of H.P. and I.P and L.P cylinders.
4 stages
L.P. turbine
Plant Auxiliary Maintenance