You are on page 1of 16

By,

Mythili.M
Nanda Kishore
Neha.L

TECHNICAL ANALYSIS
Technical Analysis

 Purpose
To ensure that the project is technically
feasible
1.Manufacturing
Process/Technology
 Plant capacity
 Principal outputs
 Investment outlay and production cost
 Use by other units
 Product mix
 Latest developments
 Ease of absorption
2. Technical Arrangements

Satisfactory arrangements must be made to


obtain the technical know-how needed for
the proposed manufacturing process.
3.Material Inputs and
Outputs
 Raw Materials
 Processed industrial materials and
components
 Auxiliary materials and factory supplies
 Utilities
4.Product Mix
ENVIRONMENTAL ASPECT

 Pollution
 Methods of disposal
 Environmental Norms
PROJECT CHARTS &
LAYOUTS

Estimation of investment and production cost


1.GENERAL FUNCTIONAL
LAYOUT

 Traffic flow in one direction. Buildi


Equip ng
ments

 Minimum of crossing. Civil


Works

Relationship
2.Material Flow
Diagram
Materials Utilities

Final Intermediate
Products Products

By-
Products
Emissions

Quantities Of Flow.
3.Production line
Diagram

4.Transport
Layout

5.Communicatio
n Layout
Project scheduling
 Sequence in which
activities have to be
performed.

 Time required (PERT


& CPM)

 Resources
requirements
Why Alternatives?

 Cost
 Time
 Risk
 Get the Best.
Need for considering
Alternatives
 Nature of Project.

 Production Process.

 Product Quality.

 Scale of operation & duration.

 Location.

You might also like