DISTILLATION SECTION
01-PRC RS collection tank bottom pump emergency switch damage
03-Distillation drain water sump pump (P-472) pressure gauge not fitted
05-Analyser bottom LT (401) display damage
. 06-FOC FO decanter(S-471) Foundation nut bolts not installed
07-Flash tank (T-401) diaframe valve wheel not fitted
08-Simmering all reflux flowmeter isolation butterfly valve handle not fitted
09-All condenser foundation not properly tighted
Modification
01-(H-508) preheater thin slop inlet and outlet line RTD required for understanding preheater scaling problem
in evaporation section
02-Flowmeter required for process condensate recycles to liquefaction section to make the actual
Slurry preparation
03-Flote valve required to maintain the pump sealing water tank level in liquefaction and evaporation section
04-FOC Cooler after decanter sample point remaining
05-RC-PCV TA cut line to connect Rota meter
06- All fermenter PHE does not having SMS at inlet line