Supplier Change Request

Date: Request Number:


To: Brad Callis From: MAHESH PAWAR

Company: Federal Mogul Company: TATA Autocomp Systems Ltd

Phone: (574) 735-0264 Phone: +91 20 6653 5392


FAX: FAX:
CC:

Part Number: 170-2544 Part Name: INLET HOUSING PLATE

The following change to the above component, supplied to you as indicated below,
✘ is proposed for your approval has been incorporated as an emergency, the following is supplied for your information
Field Containment Required Second supplier
Process change notification/approval Notification
As a Quality Improvement Cost reduction
To address capacity
is proposed as a product improvement

1. Description of Change: ✘ Drawing/Sketch included


The present print is not specifying the min. flat thickness for port diameter 2.95-3.10. Based on print, it read as Spec included
diameter to be maintain at sharp corner, which was not manufacturable. Major rejection is Process Flow included

2. Reason for Change:


To bring the absolute clarity in print, print to have the flat thickness to be mention as 0.5 ± 0.25mm & 2.95-3.10 is to be further realx to 2.95-3.20 to improve on fall out rate. for
details. pls find below sketch.

WIPU-06-400B.XLS 09/26/01 Page 1 of 2


3. Planned Effective Date:
18.08.2010

4. Effect of Change (Check all that apply)


✘ Form
Fit
Function
Cost
Performance
Certification/Safety
Warranty Improvement
Product Improvement
Source Change
✘ Other Core pin to be modified

5. Cost Assumptions: NA
Delta cost/part Information Attached
Annual volume x
Tool Cost + 0
Total Cost = #VALUE!

6. Closure Method (FM use Only):


Date:
Approved Responsiblity Action
Drawing Change Required ECN #
Customer Notification Required
Deviation Required Dev. #
Supplier 8-D Required
Cost Estimate Required CE #
Validation Plan
Supplier PPAP Submittal Required
PPAP Submittal to Customer Required
Other

Declined - Reason

WIPU-06-400B.XLS 009/26/01 Page 2 of 2


Sheet6

Present Proposed

Per print, It seems


sharp corner.
Per process it is on
parting line- face.
So conclude that can
not be mfg., raise SCR