You are on page 1of 2

DEPARTMENT OF MECHANICAL ENGINEERING

Engineering Practices Lab( Group A)


List of Exercise

I Mechanical Engineering Practice


1) Plumbing
a. External Threading of PVC Pipe.
b. Connecting Two PVC Pipe Using Union/ Coupling.
c. Connecting two different diameter pipe using Reducer.
d. Pipe Line to Wash Basin / Water Heater.
2) Carpentry
a. T Joint
b. Cross Lap Joint
c. Dovetail Joint

II Civil Engineering Practice


1) Welding
a. Butt Joint
b. Lap Joint
c. T Joint
2) Basic Machining
a. Turning
b. Taper Turning
c. Step Turning
3) Sheet Metal
a. Fabrication of Funnel
b. Fabrication of Tray

Lab Incharge HoD / Mech


DEPARTMENT OF MECHANICAL ENGINEERING
Manufacturing Technology Lab - 1
List of Exercise

1) Lathe
a. Facing, plain turning and step turning.
b. Taper Turning
c. Knurling
d. Boring and Taping.
2) Welding
a. Horizontal Welding
b. Vertical Welding
c. Gas Welding
3) Sheet Metal
a. Fabrication of Funnel
b. Fabrication of Tray
4) Foundry
a. Mould with Solid pattern
b. Mould with Loose Piece pattern
c. Mould with Core.

Lab Incharge HoD / Mech

You might also like