LAMPIRAN

Stuktur Organisasi PT. PJB UP Gresik secara umum

LAMPIRAN
Design Manual Operasi Desalination Plant

I. Spesifikasi : ( Design Manual Operasi )


a.Desalination Plant # 1 s/d 3 produksi masing -
masing unit : 10ton /day
b pembebanan / load setter :
Load Sea c
.K Set water Dist.Water Cond.water Brine.temp ap
as flow ita
s ( % ) (t/h) flow (t/h) flow(t/h) (c)
         
50 235 20.8 3.1 94
60 260 25 3.7 98
70 285 29 4.9 102
80 310 33.3 5 106
90 334 37.5 5.8 109
100 358 41.6 6.8 113
Pompa
Minimum Design
Pompa continous Maximum
  flow (t/h ) flow ( t/h)

Brine Blow Down 150 368


Distilate 10 50
Condensate 2 8.9
Ball cleaning 4 25
Acid cleaning 12   30  
d.) Injection Rate ( 100% load) : 70.16 kg/hour (7.16 l/h
LAMPIRAN
SIMULINK MATLAB
LAMPIRAN
P&ID DESALINATION PLANT