Professional Documents
Culture Documents
2008 up to now
turbine in El-ATF power station.
2- Instruments and control
1
engineer in ELATF power station
– Egypt- Mitsubishi Gas turbine
units – Frame M701F (250 MW)
Total
6 years
Experience
and Thermocouple)
5- Maintenance hardware of OIS20 and
OIS41.
6- Maintenance DCS control and GE control
From 2005
(software and hardware).- DCS control
up to 2011
system (INFI90), GE Gas Turbine (MKII)
and GE Steam Turbine (MKV).
7- Calibrate and adjustment all valves
(Electrical, Pneumatic, and hydraulic).
8- Calibrate and adjustment pressure
switch and pressure transmitter
9- Calibrate and adjustment all flow switch.
10- Maintenance temperature sensor (RTD
and Thermocouple)
11- Maintenance hardware of OIS20 and
OIS41.
12- Maintenance DCS control and GE control
(software and hardware).
2
From 2008
turbine unit and steam turbine
up to now
Power StationEL-ATF Combined Cycle
· Two HRSG
– 50 MW Each One
· 220 / 66 / 11 KV Transformers substations
· 11 / 220 KV Set Up Transformers
· 220 KV Switch Yard (Sf6 circuit breakers – Isolators –
wave Trap- Surge arrestor ……
· General Electric Steam Turbine(Mark5)2sets
· Steam turbines auxiliaries (DCS) Control
· Water treatment (PLC) control
· Tube cleaning & Debris filter system (PLC)
· Feeder 220 Kv (6sets)&feeder (66kv)
· 11/6 KV Transformers
· 6.6KV Switch gear(Sf6 circuit breakers)
3
Off-site training of maintenance program of steam turbine
250 MW at Genouva city – AEN – ITALY-2009
Off-site training of maintenance program Electric
generator 290 MVA at Genouva city – AEN – ITALY-2009
Training
4
5