ASME B31.

3 PIPING PROCESS

INTRODUCTION

This course provides the participants with a complete and up-to-date overview of process piping
design.

It covers piping fundamentals, pipe sizing,material selection for corrosion resistance, valve
sizing, including relief valves, component selection and the design, fabrication, examination and
testing requirements of ASME - B31.3 "Process Piping"

OBJECTIVES

You will leave the course with a clear understanding of how piping systems fail and what the
Code re­quires the designer, manufacturer, fabricator, supplier, erector, examiner, inspector
and owner to do to prevent such failures. A cursory review of "API 570 Piping Inspection Code"
will introduce you to the re­quirements for inspection, repair, alteration and re-rating of existing
piping systems

WHO SHOULD ATTEND

The course provides a foundation of knowledge for those designers, engineers and managers
responsible for the design and construction of new piping systems, as well as those
responsi­ble for assuring the mechanical integrity of ex­isting systems

CONTENTo   Introduction :History of Piping and Vessel Codes, Scope of B31.3,

o   Design of Piping and Piping Components : Code Design Process, Stress Calculations,

1/3
ASME B31.3 PIPING PROCESS

Types of Stresses, Piping Design Conditions, Allowable Stress, Joint Efficiency Factors, Design
of Standard Piping Components, Design of Nonstandard Piping

o   Components, Piping Joints

o   Flexibility Analysis of Piping Systems :Required Analysis, Allowable Stress Range,
Displacement Stress Range, Sustained Load Stress, Occasional Load Stresses, Increasing
Flexibility, Pipe Supports

o   Limitations on Piping and Components: Fluid Service Categories, Severe Cyclic Conditions

o   Materials: Introduction, Material Classification Systems and Specifications, Material


Requirements of B31.3,

o   Fabrication, Assembly, and Erection

o   Inspection, Examination, and Testing :Introduction, Inspection Versus Examination,


Personnel, Requirements, Examination, Testing

o   Supplemental Owner/User Requirement :Relief System Design, Inspection, Repair,


Alteration and Re-rating of In-Service Piping

Price
Rp. 3.000.000

Duration
3 days

2/3
ASME B31.3 PIPING PROCESS

Schedule

Jakarta : Octbr 29 - 31

Batam  : Nov 19 - 21

Duri      :  Nov 05 - 07 

Quota Minimum

Download Brochure

Register